2024A-01748-CHC-ROC Notice of Hearing & Packet MAILED 2024-01748.pdf

2024A-01748-CHC-ROC · Registrar of Contractors · 2024-05-22

REGISTRAR OF CONTRACTORS OF THE STATE OF ARIZONA

Amna Nabri , Case No. 2024-01748

COMPLAINANT, Docket No. 2024A-01748-CHC-ROC

v. NOTICE OF HEARING ON CONTESTED CASE Bonum Development & Construction, LLC DBA: Bonum Development & Construction License No. ROC 344755,

RESPONDENT.

This Notice of Hearing is issued under A.R.S. § 41-1092.05(D).

HEARING INFORMATION The hearing is set for:

July 2, 2024 9:00 AM Sondra Vanella Google Meet. A link will be provided directly from The Office of Administrative Hearings. Go to www.azoah.com to request to appear in-person.

If you have requested to appear in-person at the hearing, the hearing will be held at 1740 W Adams Street, Phoenix, AZ 85007.

You must attend this hearing. This is an adversarial hearing before an administrative

law judge, and is conducted in a similar manner as judicial proceedings. Thus, you must be

prepared to present evidence, including witness testimony and documents, in support of your case.

STATEMENT OF LEGAL AUTHORITY AND JURISDICTION

The State of Arizona has determined that the licensing and regulation of construction contractors is a proper state function, and has vested authority in the Registrar of Contractors to administer Title 32, Chapter 10 of the Arizona Revised Statutes. A.R.S. §§ 32-1101 et seq. All hearings for alleged violations of Title 32, Chapter 10 are conducted under Title 41,

Chapter 6, Article 10. A.R.S. § 32-1156.

The statutes and rules governing the hearing can be found at: Arizona Revised

Statutes §§ 41-1092 to -1092.12, and Arizona Administrative Code R2-19-101 to -122.

PARTICULAR ARIZONA STATUTES AND RULES INVOLVED

The statutes and rules the Respondent is alleged to have violated are cited in the

complaint and citation, which were served on the Respondent on April 23, 2024. SHORT AND PLAIN STATEMENT OF THE MATTERS ASSERTED

The complaint and citation allege that the Respondent committed the following act(s): Charge: 1 A.R.S. § 32-1154(A)(1) Charge: 2 A.R.S. § 32-1154(A)(3) - R4-9-108(a)

Charge: 3 A.R.S. § 32-1154(A)(22)

THE PARTIES TO THE ADMINISTRATIVE HEARING Because Respondent is a licensee and is charged with an act(s) or omission(s) that is cause for the suspension or revocation of a license, Respondent is a party to this case and will be a party to the hearing. Because Complainant alleged Respondent committed an act(s) or omission(s) that is cause for the suspension or revocation of a license, Complainant is a party to this case and will

be a party to the hearing.

Respondent and Complainant, as the parties to the hearing, will present evidence and

argument to the administrative law judge.

The Registrar’s assigned investigator will appear as a witness at the hearing. RIGHT TO BE REPRESENTED The parties to the administrative hearing may choose to be represented by an attorney.

A.R.S. § 41-1092.07(B). If one of the parties is a company, the company may be represented

by an officer or employee if that person satisfies the conditions set forth in A.R.S. § 32-

1156(B).

CHANGE OF ADDRESS Each party must inform the Registrar and the Office of Administrative Hearings of any change of address within five (5) days of the change. A.R.S. § 41-1092.04.

HEARING PROCEDURES AND RULES The administrative hearing will be conducted in accordance with A.R.S. §§ 41-1092

to -1092.12, and A.A.C. R2-19-101 to -122. The parties should review the statutes, rules, and processes governing the administrative hearing. Copies of the statutes, rules, and articles regarding the administrative hearing process can be found at https://www.azoah.com/.

REGISTRAR’S APPEARANCE BY VIDEO CONFERENCE OR TELEPHONE

The Registrar’s investigators, employees, and attorneys will appear at the hearing via video conference or telephone unless requested by a party to appear in-person. Requests for the Registrar’s investigators, employees, or attorneys to appear in-person must be filed with the Registrar and the Office of Administrative Hearings no later than seven (7) calendar days prior to the hearing date.

HEARING PACKET

In the interests of administrative efficiency, the Registrar compiles and discloses

certain documents to the parties and the Office of Administrative Hearings. These documents are attached to this Notice of Hearing as the “Hearing Packet.” If any party wishes to submit additional evidence, they must do so during the hearing after completing a disclosure statement. See “Disclosure Statement” section below.

SUBPOENAS FOR TESTIMONY FROM A WITNESS OR DOCUMENTS

The parties to the hearing must be prepared to present evidence in support of their

case. If a party wants to obtain testimony from a witness or documents not in the party’s

possession, the party must prepare and file a written subpoena for the Administrative Law Judge to review and sign, if approved. A.R.S. § 41-1092.07(C). Forms for requesting a

subpoena can be found on the Office of Administrative Hearings’ website at www.azoah.com. The party seeking a subpoena must serve notice on all the parties to the hearing, and on the Registrar. A.R.S. § 41-1092.04.

DISCLOSURE STATEMENT

At least seven calendar days before the hearing, each party must prepare and serve a disclosure statement on all other parties, and file it with the Office of Administrative Hearings. A.A.C. R4-9-118; A.A.C. R2-19-108. The disclosure statement must include any exhibit the party will use at the hearing. A party’s failure to timely disclose any witness or exhibit, without good cause, may result in the administrative law judge excluding those witnesses or exhibits from being used at the hearing. A.A.C. R4-9-118(C). A sample disclosure form is available on the Registrar’s website at https://roc.az.gov/forms/RC-L-800A%20- %20Prehearing%20Disclosure%20Statement%2020191007v4.pdf

CHANGING THE HEARING DATE

The date of the hearing may only be advanced or delayed on the agreement of the

parties or on a showing of good cause. A.R.S. § 41-1092.05(C). The date of the hearing may

be changed by filing a written agreement of the parties to change the date of the hearing. The written agreement must be filed with the Office of Administrative Hearings, directed to the assigned Administrative Law Judge, and transmitted to the Registrar and all other parties. The assigned Administrative Law Judge may be found on the Office of Administrative Hearings’ web portal at www.azoah.com

If a party would like to move the date of the hearing without agreement of all parties, the party must file a written motion with the Office of Administrative Hearings, directed to the assigned Administrative Law Judge, and transmit a copy to the Registrar and all other parties. The motion must state in detail good cause for why the date of the hearing should be advanced or delayed, and the position of all other parties regarding the advancement or delay. A party may also file a motion asserting a right to an expedited hearing upon a showing of

extraordinary circumstances or the possibility of irreparable harm. A.R.S. § 41-1092.05(E).

RESOLUTION SHORT OF ADJUDICATION In any case which is resolved or settled by the parties, or which is withdrawn by the Complainant without objection from Respondent after the Notice of Hearing is issued, the parties must notify the Office of Administrative Hearings of the resolution or settlement. Any such cases will be listed on the Registrar’s website and its records under the category: “Closed

Complaints – Resolved/Settled/Withdrawn.”

Dated May 22, 2024.

By: /s/ Erika Hoskin Erika Hoskin Legal Secretary Legal Department Arizona Registrar of Contractors

Copy mailed via USPS First Class mail May 22, 2024 to:

Respondent(s) Bonum Development & Construction, LLC DBA: Bonum Development & Construction 2820 S Alma School Rd #18-456 Chandler, AZ 85286 Complainant(s) Amna Nabri 3941 S Illinois St Chandler, AZ 85348 Copy sent electronically this same date to: Respondent at email address on record with the Registrar Complainant at email address on record with the Registrar

Case No. 2024-01748 /

Katie Hobbs, Governor Martin Quezada, Director

Hearing Packet FAQ What is the Hearing Packet?

The Hearing Packet is a packet of certain documents collected or issued by the Registrar over the course of its investigation.

Who gets the Hearing Packet?

The Hearing Packet is assembled and distributed to all parties and to the Office of Administrative Hearings (“OAH”) prior to an administrative hearing.

What types of cases does the Registrar prepare a Hearing Packet for?

The Registrar prepares a Hearing Packet for Complainant-Handled Cases and No-Pay Cases. Note: If the Docket Number on the Notice of Hearing contains a “CHC” or “NPC”, your case is a Complainant-Handled Case or a No-Pay Case.

What is in the Hearing Packet?

The Hearing Packet contains essential case-specific documents and at a minimum will include the following documents:

● Original complaint;

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Within AZ 877.692.9762 · Fax 602.542.1599 · roc.az.gov Hearing Packet FAQ

Katie Hobbs, Governor Martin Quezada, Director

● Citation; and ● Answer.

The Hearing Packet will also contain the following documents (if applicable):

● Jobsite inspection notices, notes, and photos; ● Written directives; and ● Compliance inspection notices, notes, and photos.

What if there are documents missing from the Hearing Packet?

If there is any evidence you submitted to the Registrar that are not included in the Hearing Packet it is your responsibility to introduce that evidence at the administrative hearing. Note: The administrative law judge assigned to your case does not have access to the entire Registrar record.

If there is additional evidence you submitted to the Registrar during the investigation that you also want to introduce as evidence during your hearing, it is your responsibility to:

● Properly disclose that evidence to the other party; and ● Introduce the evidence during your hearing.

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Within AZ 877.692.9762 · Fax 602.542.1599 · roc.az.gov Hearing Packet FAQ

Katie Hobbs, Governor Martin Quezada, Director

How do I disclose evidence I intend to use at a Hearing?

You must properly disclose any and all documents and witnesses you intend to use at your hearing according to the Registrar’s Prehearing Disclosure Rules. See Arizona Administrative Code Section R4-9-118.

A sample prehearing disclosure form and instructions are provided to the parties by the Registrar.

How do I obtain documents I previously submitted to the Registrar?

If you previously submitted documents to the Registrar and need a copy of these documents, please contact the Registrar’s Legal Department or submit a public records request at https://roc.force.com/AZRoc/s/roc-public-request.

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Within AZ 877.692.9762 · Fax 602.542.1599 · roc.az.gov Hearing Packet FAQ

Complainant: Amna Nabri 3941 S Illinois St Chandler, AZ 85348

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C008 12/23 Respondent: Bonum Development & Construction, LLC DBA: Bonum Development & Construction 2820 S Alma School Rd #18-456 Chandler, AZ 85286

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C008 12/23 February 14, 2024

Re: Complaint No. 2024-01748

Dear Complainant and Respondent:

A formal complaint has been filed with the Arizona Registrar of Contractors.

A jobsite inspection is scheduled for Thursday, March 14, 2024 at 09:00 AM. The Complainant is required to be present. The Respondent’s attendance is requested and encouraged. The Registrar encourages both parties to make a good faith effort to resolve this complaint prior to the jobsite inspection.

COMPLAINANT: 1. Under A.R.S. § 32-1155(D)(1), the Respondent must be allowed, upon request, the opportunity to inspect the work complained of within fifteen (15) days of receiving this notice. If Respondent is not provided an opportunity to inspect the work within the fifteen (15) day time period, the Registrar may be prohibited from taking further action on this complaint. 2. The Registrar may also be precluded from taking further action on this complaint, if the work that is the subject of the complaint is subject to neglect, modification, or abnormal use. A.R.S. § 32-1155(D)(2) 3. You must provide safe access to any area to be inspected. If access to a roof or other elevated area is required, you must provide a means to safely access the area (ladder or manlift as appropriate). Additionally, please secure any animals.

RESPONDENT: 1. Enclosed is a copy of the complaint. Under A.R.S. § 32-1155(D) you must be allowed, upon request, the opportunity to inspect the work complained of within fifteen days of the date of receipt of this notice. 2. To assist the assigned investigator in evaluating the merits of the complaint, please submit a response to the enclosed complaint to the assigned investigator prior to the scheduled inspection. 3. If you do not attend the jobsite inspection, your absence may negatively impact the investigation, and your interests. 4. If a building permit(s) was required for this project, please have the building permit information available at the jobsite inspection. If either party needs to reschedule the jobsite inspection, please notify the assigned investigator at least three business days prior to the inspection date to schedule a new date and time.

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C008 12/23 If the parties resolve the complaint prior to the inspection, please notify the assigned investigator in writing and by phone as soon as possible.

Sincerely,

Todd Anderson Todd Anderson, Investigator #227 (602) 771-6769 [email redacted] 1700 W Washington St, Ste 105 Phoenix, AZ 85007

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C008 12/23 A Guide to Jobsite Inspections

Purpose of the Jobsite Inspection When the Registrar receives a complaint against a contractor’s license alleging poor workmanship, the Registrar generally schedules a Jobsite Inspection. The Jobsite Inspection serves two purposes: 1. To give the contractor an opportunity to inspect the complaint items; and 2. To give the Registrar an opportunity to determine if the contractor’s work violates Arizona law.

Jobsite Inspection Rights and Responsibilities Access to inspect: The property owner has complete control over who they allow on the property. However, if the Registrar’s investigator or the contractor cannot inspect the work, the Registrar will not move forward with a citation.

Cooperation: Arizona law enables injured parties to seek relief for damages through several paths. When dealing with a licensed contractor, the Registrar of Contractors’ administrative complaint process may serve as one of those possible paths. However, in order to use that path, the Registrar relies on the cooperation of all parties to a complaint.

Minimum workmanship: The Registrar investigates workmanship complaints for compliance with minimum workmanship and professional industry standards. The Registrar does not issue citations for work that meets these standards.

Scope: The scope of the Jobsite Inspection is limited to items listed in the complaint filed with the Registrar’s office. It is the complainant’s responsibility to point out the complaint item(s) and the Investigators role to review the item(s). If the complainant identifies additional workmanship items not listed in the original complaint, they must file an addendum to the complaint. The Registrar’s Investigator may identify additional administrative violations by the contractor (e.g. work performed out of scope of the license and failure to provide a contract that meets requirements set by Arizona law) at the time of the inspection.

The Role of the Investigator At the Jobsite Inspection, the Registrar’s investigator will: ● Only investigate the items listed on the complaint form filed with the Registrar. ● Will gather evidence to make an informed decision about the complaint items.

What to expect after a Jobsite Inspection 1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C008 12/23 After doing a Jobsite Inspection, the Registrar’s Investigator will leave the jobsite and review the evidence provided during the inspection. Generally, the investigator does not make any determination at the time of the jobsite inspection regarding whether the allegations listed in the complaint are supported. ● If the allegations are confirmed, the Registrar’s Investigator may issue a Written Directive telling the contractor to correct the poor or incomplete work. ● If the allegations are not confirmed, the Registrar’s Investigator will close the complaint.

Questions? If you have already filed a complaint and it was assigned to an investigator, you are encouraged to contact that investigator directly with the information listed in your jobsite inspection letter. If you have not filed a complaint yet or have not been assigned an investigator, you can reach the Registrar’s compliance department at (877) 692-9762.

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C008 12/23 A Guide to Written Directives Purpose of the Jobsite Inspection When the Registrar receives a complaint against a contractor’s license, the Registrar generally schedules a Jobsite Inspection. The Jobsite Inspection serves two purposes: 1. To give the contractor an opportunity to inspect the complaint items; and 2. To give the Registrar an opportunity to determine if the contractor’s work violates Arizona law.

What to expect after a Jobsite Inspection After doing a Jobsite Inspection, the Registrar’s Investigator will determine whether the allegations listed in the complaint are supported. ● If the allegations are confirmed, the Registrar’s Investigator may issue a Written Directive telling the contractor to correct the poor or incomplete work. ● If the allegations are not confirmed, the Registrar’s Investigator will close the complaint.

Written Directives Access: In order to use the administrative process offered by the Registrar, a property owner must provide reasonable access to allow the contractor to fix their work as directed by the Registrar in a Written Directive. Complainants may not put any additional, unnecessary restrictions on the Respondent above and beyond the initial contract requirements agreed upon at the beginning of the project. Respondents are required to make repairs on items identified on any Written Directive, not otherwise restricted by local code or HOA limitations. Complainants must make access available to the Respondent to make the required repairs and failure to provide reasonable access may result in the Registrar dismissing the complaint.

Contractor obligations: The Written Directive will set a deadline for compliance. This is the period of time determined by the Investigator as necessary to complete the items listed in the Directive. ● The deadline for compliance assumes the contractor will promptly begin working on the items listed in the Directive. ● Do not wait. Both parties should communicate quickly to schedule the work.

Extensions: If good cause exists to extend this deadline, either party may submit a written request to the Investigator. The Registrar will review requests for extension and determine if the Directive should be extended.

Manner and method of performance: The Registrar does not provide specific instructions for how to correct poor work. A licensed contractor is expected to have the skill and 1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C008 12/23 professionalism to complete the work. Moreover, the complainant may not dictate the manner of repair. If the contractor fails to appropriately correct the work according to the contract, the Registrar will issue a citation.

Compliance Inspection: After the Written Directive expires, the Registrar’s Investigator will contact the complainant to determine if the contractor performed any corrective work. ● If the contractor did corrective work, the Investigator may schedule a Compliance Inspection to determine if the poor work is corrected. ● If the contractor did not perform any corrective work, the Registrar’s Investigator will not do a Compliance Inspection and will determine whether to issue a citation based on the administrative record.

Work performed after the directive ends: After the Directive period ends, a property owner may choose to allow the contractor to continue its work. The Registrar encourages parties to work cooperatively, but cannot require a homeowner to continue to allow a contractor access to the property after the Directive period ends in order for the administrative process to continue. Denying access after the Directive ends is not grounds to close or dismiss a complaint.

Questions? If you have already filed a complaint and it was assigned to an investigator, you are encouraged to contact that investigator directly with the information listed in your jobsite inspection letter. If you have not filed a complaint yet or have not been assigned an investigator, you can reach the Registrar’s compliance department at (877) 692-9762.

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C008 12/23 JSI Photos #2024-01748 P 1 Date: 3/14/24 at 9:00 am JSI PHOTOS 00AM JSI Photos #2024-01748 P 2 Date: 3/14/24 at 9:00 am JSI PHOTOS 00AM

Boxes of purchased product not yet installed JSI Photos #2024-01748 P 3 Date: 3/14/24 at 9:00 am JSI PHOTOS 00AM Boxes of purchased product not yet installed JSI Photos #2024-01748 P 4 Date: 3/14/24 at 9:00 am JSI PHOTOS 00AM Boxes of purchased product not yet installed JSI Photos #2024-01748 P 5 Date: 3/14/24 at 9:00 am JSI PHOTOS 00AM Boxes of purchased product not yet installed JSI Photos #2024-01748 P 6 Date: 3/14/24 at 9:00 am JSI PHOTOS 00AM

Powder Room not yet fully painted JSI Photos #2024-01748 P 7 Date: 3/14/24 at 9:00 am JSI PHOTOS 00AM

Powder Room not yet fully painted JSI Photos #2024-01748 P 8 Date: 3/14/24 at 9:00 am JSI PHOTOS 00AM

Location of Bathtub JSI Photos #2024-01748 P 9 Date: 3/14/24 at 9:00 am JSI PHOTOS 00AM

Location of Toilet JSI Photos #2024-01748 P 10 Date: 3/14/24 at 9:00 am JSI PHOTOS 00AM

Location of Light Fixture (Master Bathroom) JSI Photos #2024-01748 P 11 Date: 3/14/24 at 9:00 am JSI PHOTOS 00AM

Incomplete Shower

Location of Shower Glass JSI Photos #2024-01748 P 12 Date: 3/14/24 at 9:00 am JSI PHOTOS 00AM

Incomplete Shower JSI Photos #2024-01748 P 13 Date: 3/14/24 at 9:00 am JSI PHOTOS 00AM

Incomplete Shower Jobsite Inspection Notes

Case No.: 2024-01748 Investigator: Todd Anderson Inspection Date: Thursday, March 14, 2024 Inspection Time: 09:00 AM

Complainant: Amna Nabri Respondent: Bonum Development Not Present: & Construction, LLC Not Present:

Jobsite General Notes:

Respondent was not present at the Jobsite Inspection. Someone representing (R) (Jen) did meet me outside the house but I informed her that she would have to call me later. Cannot speak outside the residence.

Compliance Item: 1 - Contract was based on having project completed in two weeks, contractor failed to follow through schedule. Contractor pressured me to provide him more than 50% of the cost before starting the project. Contractor failed to order products in a timely manner, failed to respond with updates when requested. Financial statements changes. Investigator’s Observation: Contract was signed and work commenced in September of 2023. As of the date of the Jobsite Inspection (March 14th, 2024), work in the Master and Powder Rooms have still not been completed. There have been issues concerning the purchasing of incorrect materials, workmanship, communication and scheduling which have delayed progress of the project. Contractor shall complete all work as per contract, in accordance with local building codes and manufacturer's specifications, and in a timely manner.

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C011 12/23

Governing Rule: A.R.S. 32-1154(A)(3) Poor work – A contractor shall perform all work in a professional and workmanlike manner.

Compliance Item: 3 - No paint in the Powder Room Investigator’s Observation: Verified. The contractor has not repainted the Powder Room after the installation of the new Vanity and light fixture. Governing Rule: Violation of any rule adopted by the Registrar; Namely A.A.C. R4-9-108(a): A contractor shall perform all work in a professional and workmanlike manner.

Compliance Item: 4 - Master bathroom is not completed. no toilet, no tub/plumbing, no light fixtures, only part of the tile was installed Investigator’s Observation: Verified. I observed a Master Bathroom remodel which was still not completed. The installation of the shower, tub, toilet, shower glass, and all fixtures still needed to be installed. Contractor shall complete all work as per contract, in accordance with local building codes and manufacturer's specifications, and in a timely manner. Governing Rule: Violation of any rule adopted by the Registrar; Namely A.A.C. R4-9-108(a): A contractor shall perform all work in a professional and workmanlike manner.

ITEMS NOT REQUIRING CORRECTION:

Compliance Item: 7 - Downstairs flooring was changed to cheaper poor quality due to being under pressure to finish the project sooner. Investigator’s Observation: Unable to verify. Financial Dispute between the two parties. Governing Rule: N/A

Compliance Item: 2 - Powder room vanity size is not the one I approved, light fixture position installed incorrectly. Investigator’s Observation: The contractor did not stipulate the specific vanity which would be installed in the Powder Room. This is a verbal dispute

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C011 12/23

between the two parties. Additionally, there was no written agreement as to the positioning of the light fixture. This is also a verbal dispute between the two parties. Governing Rule: N/A

Compliance Item: 5 - Damages to my stove when crew demoed downstairs, damaged front door and furniture Investigator’s Observation: I observed the damages to the stove, front door, and furniture; however, I was unable to positively determine that the contractor was responsible for that damage. Governing Rule: N/A

Compliance Item: 6 - Crew did not cover my furniture when demo was conducted, furniture is very dusty Investigator’s Observation: Unable to verify; however, in an email dated January 4th, 2024, the contractor did offer to have the furniture professionally cleaned. Governing Rule: N/A

Todd Anderson Todd Anderson, Investigator #227 (602) 771-6769 [email redacted] 1700 W Washington St, Ste 105 Phoenix, AZ 85007

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C011 12/23

Complainant: Amna Nabri 3941 S Illinois St Chandler, AZ 85348

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C009 12/23 Respondent: Bonum Development & Construction, LLC DBA: Bonum Development & Construction 2820 S Alma School Rd #18-456 Chandler, AZ 85286

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C009 12/23 March 28, 2024

License No. ROC 344755

Re:Complaint No. 2024-01748

WRITTEN DIRECTIVE FROM THE REGISTRAR

Dear Respondent:

After investigation, the Registrar determined that you failed to meet the requirements of A.R.S. § 32-1154(A), and now issues this Directive requiring you to take appropriate corrective action. Failure to comply with this Directive constitutes a violation of A.R.S. § 32-1154(A)(22) and may result in the issuance of a citation, discipline of your license, and a civil penalty pursuant to A.R.S. § 32-1154(E) of up to $500.00. You must notify the Registrar’s assigned Investigator of your compliance with this Directive prior to 5:00 p.m. on April 18th, 2024.

RESTRICTIONS • You may not perform or hire other contractors to perform work that is outside the scope of your license. • If your license is currently suspended for administrative reasons 1, or is inactive, expired, or cancelled, you may not perform any corrective work nor contract in any manner, which includes hiring other contractors to perform work, until the suspension of your license(s) has been lifted or your license(s) has been reactivated.

DIRECTIVE REQUIREMENTS You are directed to remedy the following violations by the appropriate means:

Compliance Item: 1 - Contract was based on having project completed in two weeks, contractor failed to follow through schedule. Contractor pressured me to provide him more than 50% of the cost before starting the project. Contractor failed to order products in a timely manner, failed to respond with updates when requested. Financial statements changes. Investigator’s Observation: Contract was signed and work commenced in September of 2023. As of the date of the Jobsite Inspection (March 14th,

This means the license is suspended for lack of qualifying party, lack of bond, nonrenewal, Recovery Fund payout, or for any reason listed in A.R.S. § 32-1124(F).

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C009 12/23 2024), work in the Master and Powder Rooms have still not been completed. There have been issues concerning the purchasing of incorrect materials, workmanship, communication and scheduling which have delayed progress of the project. Contractor shall complete all work as per contract, in accordance with local building codes and manufacturer's specifications, and in a timely manner. Governing Rule: A.R.S. 32-1154(A)(3) Poor work – A contractor shall perform all work in a professional and workmanlike manner.

Compliance Item: 3 - No paint in the Powder Room Investigator’s Observation: Verified. The contractor has not repainted the Powder Room after the installation of the new Vanity and light fixture. Governing Rule: A.R.S. 32-1154(A)(3) Poor work – A contractor shall perform all work in a professional and workmanlike manner.

Compliance Item: 4 - Master bathroom is not completed. No toilet, no tub/plumbing, no light fixtures, only part of the tile was installed Investigator’s Observation: Verified. I observed a Master Bathroom remodel which was still not completed. The installation of the shower, tub, toilet, shower glass, and all fixtures still needed to be installed. Contractor shall complete all work as per contract, in accordance with local building codes and manufacturer's specifications, and in a timely manner. Governing Rule: A.R.S. 32-1154(A)(3) Poor work – A contractor shall perform all work in a professional and workmanlike manner.

ITEMS NOT REQUIRING CORRECTION The following complaint items require no action by the Respondent:

Compliance Item: 7 - Downstairs flooring was changed to cheaper poor quality due to being under pressure to finish the project sooner. Investigator’s Observation: Unable to verify. Financial Dispute between

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C009 12/23 the two parties. Governing Rule: N/A

Compliance Item: 2 - Powder room vanity size is not the one I approved, light fixture position installed incorrectly. Investigator’s Observation: The contractor did not stipulate the specific vanity which would be installed in the Powder Room. This is a verbal dispute between the two parties. Additionally, there was no written agreement as to the positioning of the light fixture. This is also a verbal dispute between the two parties. Governing Rule: N/A

Compliance Item: 5 - Damages to my stove when crew demoed downstairs, damaged front door and furniture Investigator’s Observation: I observed the damages to the stove, front door, and furniture; however, I was unable to positively determine that the contractor was responsible for that damages. Governing Rule: N/A

Compliance Item: 6 - Crew did not cover my furniture when demo was conducted, furniture is very dusty Investigator’s Observation: Unable to verify; however, in an email dated January 4th, 2024, the contractor did offer to have the furniture professionally cleaned. Governing Rule: N/A

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C009 12/23 Please direct all questions regarding this Directive to the undersigned Investigator.

Sincerely,

Todd Anderson Todd Anderson, Investigator #227 (602) 771-6769 [email redacted] 1700 W Washington St, Ste 105 Phoenix, AZ 85007

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov C009 12/23 REGISTRAR OF CONTRACTORS OF THE STATE OF ARIZONA

Amna Nabri, Case No. 2024-01748 COMPLAINANT, v. Bonum Development & Construction, LLC CITATION DBA: Bonum Development & Construction License No. ROC 344755,

RESPONDENT.

The Registrar issues this Citation to Bonum Development & Construction, LLC DBA: Bonum Development & Construction (“Respondent”) under A.R.S. § 32-1155(A). If Respondent fails to answer this Citation by May 8, 2024, then under A.R.S. § 32-1155(C), Respondent’s failure to answer may be deemed an admission of the act or acts charged in the underlying complaint, and the Registrar may then suspend or revoke Respondent’s license(s). THE WRITTEN COMPLAINT On February 12, 2024, Amna Nabri (“Complainant”) filed a written complaint with the Registrar. A copy of that Complaint is attached to this Citation. A FORMAL STATEMENT OF THE CHARGES AGAINST RESPONDENT The Registrar investigated this matter and finds cause to charge Respondent with violation(s) of Title 32, Chapter 10 of the Arizona Revised Statutes. Respondent is charged with violating: Charge :1 A.R.S. § 32-1154(A)(1) Abandonment of a contract or refusal to perform after submitting a bid on work without legal excuse for the abandonment or refusal.

of 5

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 Charge :2 A.R.S. § 32-1154(A)(3) - R4-9-108(a) Violation of any rule adopted by the Registrar; Namely A.A.C. R4-9-108(a): A contractor shall perform all work in a professional and workmanlike manner. Charge :3 A.R.S. § 32-1154(A)(22) Failure to take appropriate corrective action to comply with this chapter or with rules adopted pursuant to this chapter without valid justification within a reasonable period of time after receiving a written directive from the Registrar. The written directive shall set forth the time within which the contractor is to complete the remedial action. The time permitted for compliance shall not be less than fifteen days from the date of issuance of the directive. A license shall not be revoked or suspended nor shall any other penalty be imposed for a violation of this paragraph until after a hearing has been held.

If the matter proceeds to a hearing and the administrative law judge determines that any of the charges listed above are supported by a preponderance of the evidence, then Respondent’s license(s) may be subject to suspension or revocation, and Respondent may be subject to other penalties provided by law, including civil penalties under A.R.S. §§ 32-1154(E) and (F). FILING A WRITTEN ANSWER Respondent must appear by filing with the Registrar a written answer to the citation and complaint showing cause, if any, why Respondent’s license(s) should not be suspended or revoked. A.R.S. § 32-1155(A). Respondent’s written answer should contain the heading “Written Answer to Citation and Complaint” and should include the case number, which is Case No. 2024-01748. How to File a Written Answer: Respondent’s written answer may be submitted in the following ways:

of 5

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 In-Person: 1700 W. Washington St., Ste. 105, Phoenix, Arizona, 85007-2812 Mail: P.O. Box 18244, Phoenix, Arizona, 85005-8244 Email: [email redacted] The Registrar’s normal office hours are 8:00 a.m. to 5:00 p.m., Monday through Friday. If Respondent submits a written answer by mail, it is not filed with the Registrar until the Registrar actually receives it. Deadline for Filing a Written Answer: Respondent must file a written answer with the Registrar no later than May 8, 2024. This deadline is calculated under A.R.S. §§ 32-1155(A) and (B), which provides a deadline ten days after service of the Citation. Service of the Citation and Complaint is complete five days after the Registrar mails a copy of the Citation and Complaint to Respondent’s latest address of record in the Registrar’s office. Consequences for Failing to File a Written Answer: If Respondent fails to answer, Respondent’s failure may be deemed an admission of the act or acts charged in the written complaint. A.R.S. § 32-1155(C). The Registrar may then suspend or revoke Respondent’s license(s). THE ADMINISTRATIVE HEARING If Respondent files a timely written answer contesting any charges in the Complaint, then the Registrar will request the Office of Administrative Hearings set a date for an administrative hearing and will notify all the parties at least 30 days before that hearing. A.R.S. § 41-1092.05(D). INVESTIGATOR’S APPEARANCE AS A WITNESS The Registrar’s assigned investigator will appear as a witness at the hearing. If either party demands the attendance at the hearing of any other person, that party must obtain and serve a subpoena in compliance with the rules and processes established by the Office of Administrative Hearings.

of 5

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 RESPONDENT’S RIGHT TO REQUEST AN INFORMAL SETTLEMENT CONFERENCE Under A.R.S. § 41-1092.06, if Respondent submits a request to the Registrar for an informal settlement conference, the Registrar must hold a conference within 15 days after receiving the request. Respondent’s request for an informal settlement conference must be in writing and must be filed no later than 20 days before the administrative hearing. A.R.S. § 41- 1092.06(A). The Registrar will not close or settle any case without both parties’ appearance at the Settlement Conference. The parties participating in the settlement conference must have the authority to settle the case and must waive their right to object to the participation of the Registrar’s settlement conference representative in the final administrative decision. A.R.S. § 41-1092.06(B). Any statements, either written or oral, made by the parties at the conference, including a written document, created or expressed solely for the purpose of settlement negotiations, are inadmissible in the administrative hearing. A.R.S. § 41-1092.06(B). RESPONDENT’S PRIOR RECORD Under A.A.C. R4-9-117, in determining the appropriate discipline, the administrative law judge and the Registrar may consider not only facts in the current case, but also facts in prior cases and any documents regarding Respondent on file with the Registrar. Respondent’s prior disciplinary record and current license(s) status may be considered as a mitigating or aggravating factor in determining the appropriate discipline. EVIDENTIARY DISCLAIMER By issuing this Citation, the Registrar is directing Respondent to file a written answer to the Citation and Complaint, showing cause, if any, why Respondent’s license(s) should not be suspended or revoked. A.R.S. § 32-1155(A). This Citation does not constitute proof that any charge or allegation in Complainant’s written complaint is in fact true. This Citation does not

of 5

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 constitute proof that Respondent violated any statutory provision or rule adopted by the Registrar. Dated April 23, 2024. By: /s/ Tedi Quezada Tedi Quezada Legal Assistant Legal Department Arizona Registrar of Contractors COPY of the foregoing mailed by Certified Mail, Return Receipt Requested, April 23, 2024 to:

Respondent Certified Mail No: [number redacted]

Bonum Development & Construction, LLC DBA: Bonum Development & Construction 2820 S Alma School Rd #18-456 Chandler, AZ 85286

Copy mailed by USPS First Class mail this same date to: Respondent Bonum Development & Construction, LLC DBA: Bonum Development & Construction 2820 S Alma School Rd #18-456 Chandler, AZ 85286

Complainant Amna Nabri 3941 S. Illinois St. Chandler, AZ 85348 Copy sent electronically this same date to: Respondent at email address on record with the Registrar Complainant at email address on record with the Registrar Case No. 2024-01748 of 5

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 2/20/24, 11:00 AM State of Arizona Mail - Complaint #2024-01748

Todd Anderson <[email redacted]>

Complaint #2024-01748 message

AMNA NABRI <[email redacted]> Sat, Feb 17, 2024 at 10:25 AM To: "[email redacted]" <[email redacted]>

Sent from my iPhone

Begin forwarded message:

From: Gerald Turner <[email redacted]> Date: January 4, 2024 at 8:39:54 PM MST Subject: S. Illinois St. Project Meeting Recap

Amna (and family),

Your voice matters. We heard you. We listened. We should have listed more before and if we did not say it loud enough, we apologize for our short comings as a company and as humans.

By no means do I think our meeting, today, erases your bad experience with our company that you endured. We still have to come to an agreement, that is if we move forward together. First, you still have to think about whether you want to move forward or not. And if we move forward, the jury will still be out whether we will professionally complete the project or not, to your satisfaction. We know that you expect organization and timely communication.

The following is what I took note of, today: Flooring Downstairs - you do not like the quality of the product. You are happy with the labor installation but not happy with the product itself

Powder Bathroom:

Vanity - you are not happy with the vanity. I propose that we exchange the vanity for one that you like and highly recommend that you take me up on this suggestion (we can return and swap this item out for something new up to $75 more in price) Paint - you are not happy with the painting. I propose that we match the exact paint color that you need and paint the entire restroom (no additional cost) Vanity Hardware - we did not install black matte hardware to match the faucet. Please pick out the hardware that you want us to install and we will purchase it at no additional cost to you. Lighting - Needs to be lowered; we will lower it after we paint Mirror - Needs to be lowered; we will lower it after we paint

Master Bathroom:

Vanity Hardware - need to install gold hardware to match the faucet. Please pick out the hardware that you want us to install and we will purchase it at no additional cost to you. https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted] 1/3 2/20/24, 11:00 AM State of Arizona Mail - Complaint #2024-01748

Toilet - Please allow us to install this tomorrow anytime between Tuesday and Thursday of next week. (As Jen mentioned, we will remove the toilet when it is time to complete the rest of the restroom) Shower Valve, Shower Head and Shower Drain - these are onsite and have not been installed. My recommendation is that our plumber installs these when they install the shower head, drain and valve. However, we understand that you would rather have all of the work done at one time, outside of the toilet (but please consider it) Shower Glass - was not installed; we will install it at no additional cost Tile - The remaining floor tile and wall tile needs to be installed The following items need to be selected by you and we will purchase them and install them at no additional cost: Mirror Vanity Lighting Tub Tub Filler Decorative Lighting above the Tub

Making sure that we are on the same page, when I reference "at no additional cost" that means, you would not pay any more than the balance of $4723.87 shown on Itemized Sheet 3 which would bring your total out of pocket cost for the entire project to $34,723.87.

Key Points to Successfully Resume the Project:

Amna and Bonum construct mutual terms to resume the project Amna selects the products, Bonum confirms the products will work, Bonum pays for the products Bonum does not schedule the work in until all products have been received; however, Bonum does create a tentative scheduled based on potential completed delivery dates Amna and Bonum collectively decide upon the installation dates and times based on Bonum

Professional Cleaning of your Furniture: If you have already had your furniture professionally cleaned, please provide us with a receipt and we will deduct that from your final payment. If you have not had your furniture professionally cleaned, please set up the cleaning and we will reimburse you for the cleaning.

Stove Damage and Front Door Damage - please allow us to reassess these damages and properly repair them as necessary

Financial Payment Method: Amna and Gerald to revisit the possibility of putting all of the billing on to Amna's home improvement credit card and refunding her cash.

If I am missing anything, please let me know.

We look forward to hearing from you for the next steps.

Gerald Turner Bonum 480-227-4704

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted] 2/3 2/20/24, 11:00 AM State of Arizona Mail - Complaint #2024-01748

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted] 3/3 2/21/24, 1:04 PM State of Arizona Mail - Complaint #2024-01748

Todd Anderson <[email redacted]>

Complaint #2024-01748 AMNA NABRI <[email redacted]> Wed, Feb 21, 2024 at 11:05 AM To: Todd Anderson <[email redacted]>

Thanks. I just want to ask is it possible to move the site visit to March 11th instead of March 14th if not that’s ok . Regards Amna Sent from my iPhone

On Feb 21, 2024, at 8:22 AM, Todd Anderson <[email redacted]> wrote:

[Quoted text hidden]

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permmsgid=msg-f:[number redacted]&simpl=msg-f:[number redacted]… 1/1 2/21/24, 1:04 PM State of Arizona Mail - Complaint #2024-01748

Todd Anderson <[email redacted]>

Complaint #2024-01748 Todd Anderson <[email redacted]> Wed, Feb 21, 2024 at 1:04 PM To: AMNA NABRI <[email redacted]>

I'm sorry, I am out in Phoenix on March 11th. If you are not available on the 14th, my next available time slot would be on March 20th at 9am. Let me know.

Todd Anderson Investigator #227

Arizona Registrar of Contractors Construction Investigations 1700 W Washington St., Ste 105 Phoenix, AZ 85007 Phone: (602) 771-6769 Email: [email redacted]

[Quoted text hidden]

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permmsgid=msg-a:r-[number redacted]&simpl=msg-a:r-[number redacted]… 1/1 2/22/24, 10:04 AM State of Arizona Mail - Complaint #2024-01748

Todd Anderson <[email redacted]>

Complaint #2024-01748 AMNA NABRI <[email redacted]> Wed, Feb 21, 2024 at 4:15 PM To: Todd Anderson <[email redacted]>

That’s fine we can keep March 14th no worries. Thanks so much! Sent from my iPhone

On Feb 21, 2024, at 1:04 PM, Todd Anderson <[email redacted]> wrote:

[Quoted text hidden]

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permmsgid=msg-f:[number redacted]&simpl=msg-f:[number redacted]… 1/1 DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44

Client Contract Agreement

This agreement (“Contract”) is made and entered into on 9/21/23 by and between

Amna Nabri (“Owner”) and Bonum DC (“Contractor”). The Owner and Contractor agree

as follows:

The Contractor will perform and/or hire the sub-contractors to perform the required scope of

work outlined in the architectural drawings for the

Illinois St Residential ____________________________________________ (“Project”) that is located at 3941S.

Illinois Street Chandler, AZ. If architectural drawings are not available for this project, the

owner and owner representative understand that there is a higher risk for unforeseen

construction expenses that the contractor will not be responsible for financially. The

Contractor will assume the financial responsibility for all assigned Contractor furnished

equipment, finishes and fixtures that have been outlined in the related architectural

drawings and/or presented to the contractor by the owner to be listed out in the attached

estimate. If the contractor furnished equipment, finishes and fixtures are not listed out in the

attached estimate, the contractor will not be responsible for them.

Contractor shall perform the scope of work outlined in the documents attached to the satisfaction $40,000.00 of the Owner for the estimated price of $__________________. DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 The Contractor shall immediately notify the Owner in writing of any potential change orders

that will alter the project work and expenses. Before performing the work required by the

change orders, the owner and contractor will document and sign a separate contract

agreement related to each individual change order. The Contractor and the Owner agree that

no change order or other form of order or directive will be considered valid unless it is

delivered in writing by Owner to Contractor.

Communication with the sub-contractors regarding the project schedule, construction

instructions and financial matters shall only take place between the contractor and the

contractor’s subcontractors. The owner agrees not to discuss the project schedule,

construction instructions and financial matters with the subcontractor. The contractors

subcontractors will be informed not to take direction regarding construction related matters

from the owner as this is what is best for the project. If the owner would like to make changes

to the project and/or offer construction instructions, the owner must talk directly with the

contractor. Furthermore, the contractor and subcontractors are to first abide by the city codes

and architectural drawings before considering direction from the owner; this is necessary to

protect the best interest of the owner, the project and all others involved.

This contract starts after the owner and the contractor both have signed this contract agreement

and after the initial required deposit from the owner has been made to the contractor and the funds

for that payment have been released into the contractor’s bank account. The contractor cannot

begin scheduling until the deposit has been made and cleared the contractor’s bank account. The

contract ends after the owner and the city inspectors and/or building owner approve and sign off DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 on all work. The contractor will warranty all labor for one year. Any equipment furnished by the

contractor shall come with the manufacturer’s warranty.

The contractor agrees to carry the required insurance at all times during this project.

This Contract is subject to and shall be interpreted under the law of the State of

Arizona.

The owner may terminate this agreement with written notice but the owner will still be responsible for paying

the contractor for all work performed by the contractor and the contractor’s subcontractors up to the final date

outlined in the owner’s notice to terminate the contract agreement. The contractor may stop work at anytime

and/or terminate the contract agreement at anytime with written notice if the owner is not paying the

contractor as outlined in this agreement the owner will still be responsible for paying the contractor for all work

performed by the contractor and the contractor’s subcontractors up to the final date outlined in the owner’s

notice to terminate the contract agreement. The contractor may also terminate the contract agreement if the

owner breaches this contract agreement.

The Contractor shall employ only competent and skilled workmen and foremen in the conduct

of work on this Contract. The Contractor shall at all times enforce strict discipline and good

order among Contractor’s employees.

All disputes will be handled accordingly and legally under the laws of the State of

Arizona. All invoices shall be sent to the Owner’s Project Manager identified in this

Contract. DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Owner will make payments for services on a monthly basis for services performed during the

previous month in accordance with this Contract unless a project specific payment

contract agreement has been assigned to this project and attached to this contract

agreement. Materials will be payable on a reimbursable basis plus the agreed-to additional

fees for overhead, handling, and General and Administrative (G&A) costs.

If any terms, conditions or provisions of this Contract shall be held unconstitutional, illegal or

void, such finding shall not affect any other terms, conditions or provisions of this Contract.

Amna Nabri

9/21/2023

9/21/2023 DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44

PAYMENT TERMS:

50% Deposit 25% payment after 50% of work is completed 25% upon completion

$5000 cash was paid to Bonum date of signing. The remaining $15,000 to be paid in the next 48 hours

SPECIAL PROJECT TERMS: Consult Transfer Instructions You can use “Consult Transfer” to blind transfer a call, or conference in another party.

1. Select the ‘Consult Transfer’ icon

2. Next, enter the name of the person you are calling, or phone number or the Queue name, the hit ‘Enter’

3. Now you can either transfer the call, conference in both parties, or transfer the call a. Hitting the transfer button immediately will act as a ‘Blind Transfer’.

CONSULT TRANSFER | TW_08/11/2023 3/13/24, 4:35 PM State of Arizona Mail - Complaint #2024-01748

Todd Anderson <[email redacted]>

Complaint #2024-01748 AMNA NABRI <[email redacted]> Wed, Mar 13, 2024 at 4:21 PM To: Todd Anderson <[email redacted]>

I will see you tomorrow at 9:00 am right?? Sent from my iPhone

On Feb 21, 2024, at 4:15 PM, AMNA NABRI <[email redacted]> wrote:

That’s fine we can keep March 14th no worries. [Quoted text hidden]

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permmsgid=msg-f:[number redacted]&simpl=msg-f:[number redacted]… 1/1 INVOICE

Development & Construction Gerald Turner [email redacted] / 480-227-4704 DATE: 12/10/2023 FOR:

Project: Illinois Street Location:

FINAL TOTAL PROJECT INVOICE

Subtotal $27,789 Overhead / Developer Fees $4,168

TOTAL: $31,958 ****IMPORTANT - PLEASE READ****

Upon Signing this agreement, you confirm that you understand all details of the process for this project including but not limited to the turnaround time frames for architects, engineers, city & health permits, payment schedule, project start date and anticipated deadlines that come with each project phase, all change orders are agreed upon by all parties (client, sub, GC) before initiating. We do not move, remove or relocate owner furnished equipment unless we are paid to do so and we are not responsible for any damages to owner furnished equipment during the moving process. ANY DEMO COST QUOTED POTENTIALLY COULD CHANGE AFTER WE OPEN UP THE WALLS AND/OR DEMO EXISTING FLOORING AS WE DO NOT KNOW THE CONDITION INSIDE THE WALLS OR THE CONDITIION OF THE FLOORING UNTIL AFTER WE START OR COMPLETE DEMO. We are not responsible for incorrectly ordered owner furnished equipment or materials. This estimate is based on the information provided in the most recent drawings. Communication is key throughout this project. Abiding by this contract is necessary in order to reduce stress, limit construction delays and keep all payments on time. BY ACCEPTING THIS PROPOSAL, YOU ARE APPROVING THE PRICING AND THE PAYMENT SCHEDULE. PAYMENT DELAYS CAN AFFECT THE DURATION. The cost of this estimate is good for 30 days.

Signature Date

DESCRIPTION AMOUNT

Supervision Discount -$2,000

Client Discount (This discount is taken directly from Bonum's profit of $4631 that Bonum was scheduled to profit) -$5,000 Floor Demo $4,500

Tile Installation and Plumbing (Shower and Floor): Includes all Tile $10,906

Misc. Master Bathroom including framing, painting and shower glass - including hardware, lighting , hooks/rack $3,550

Flooring and Baseboards: Furnish and Install including furnish install of all door hardware $10,715

Powder Room: Drywall Repair, Install Toilets, Vanity, Lighting, Faucet, Hooks $1,505

All Electrical Work - Furnish Materials and Install Labor $632

Master Tub, Toilet, Vanity and Valve Shower Head $4,064

Supervision $2,000

Materials Credit: Tub,Tub filler, Vanity Hardware, Hooks/Racks, Ratan pendent lighting, mirror Labor Credit: Installation of showever valve, tub, tub filler, completion of tile install, install of pendent and vanity lighting, mirror -$3,082 and accessories and fabrication and installation of shower glass

Total GC Discount Offered: $7000 Total Credit/Refunds due to Contract Termination: $3082 INVOICE

Development & Construction Gerald Turner [email redacted] / 480-227-4704 DATE: 12/3/2023 FOR:

Project: Illinois Street Location:

FINAL TOTAL PROJECT INVOICE

Subtotal $30,871 Overhead / Developer Fees $4,631

TOTAL: $35,502 ****IMPORTANT - PLEASE READ****

Upon Signing this agreement, you confirm that you understand all details of the process for this project including but not limited to the turnaround time frames for architects, engineers, city & health permits, payment schedule, project start date and anticipated deadlines that come with each project phase, all change orders are agreed upon by all parties (client, sub, GC) before initiating. We do not move, remove or relocate owner furnished equipment unless we are paid to do so and we are not responsible for any damages to owner furnished equipment during the moving process. ANY DEMO COST QUOTED POTENTIALLY COULD CHANGE AFTER WE OPEN UP THE WALLS AND/OR DEMO EXISTING FLOORING AS WE DO NOT KNOW THE CONDITION INSIDE THE WALLS OR THE CONDITIION OF THE FLOORING UNTIL AFTER WE START OR COMPLETE DEMO. We are not responsible for incorrectly ordered owner furnished equipment or materials. This estimate is based on the information provided in the most recent drawings. Communication is key throughout this project. Abiding by this contract is necessary in order to reduce stress, limit construction delays and keep all payments on time. BY ACCEPTING THIS PROPOSAL, YOU ARE APPROVING THE PRICING AND THE PAYMENT SCHEDULE. PAYMENT DELAYS CAN AFFECT THE DURATION. The cost of this estimate is good for 30 days.

Signature Date

DESCRIPTION AMOUNT Supervision $2,000

Supervision Discount -$2,000

Floor Demo $4,500

Tile Installation and Plumbing (Shower and Floor): Includes all Tile $10,906

Misc. Master Bathroom including framing, painting and shower glass - including hardware, lighting , hooks/rack $3,550

Flooring and Baseboards: Furnish and Install including furnish install of all door hardware $10,715

Powder Room: Drywall Repair, Install Toilets, Vanity, Lighting, Faucet, Hooks $1,505

All Electrical Work - Furnish Materials and Install Labord $632

Master Tub, Toilet, Vanity and Valve Shower Head $4,064

Client Discount (This discount is taken directly from Bonum's profit of $4631 that Bonum was scheduled to profit) -$5,000

Total Client Discount: $7000 Contractor/Supplier Scope of Work/Proudct Amount Location Horacio Demo $ 4,500.00 Downstairs Home Depot Plastic Sheeting $ 179.48 Downstairs Floor & Décor Flooring $ 3,116.46 Downstairs Floor & Décor Underlayment $ 566.99 Downstairs Emilio Installation Flooring $ 5,450.00 Downstairs Home Depot Baseboards $ 1,342.23 Downstairs Emilio Installation Baseboards $ 1,650.00 Downstairs Home Depot Door Hardware/Millwork $ 236.66 Downstairs Lowes Toilet $ 268.42 Powder Room Home Depot Vanity $ 279.20 Powder Room Lowes Vanity Lights, Towel Ring $ 142.99 Powder Room Lowes Mirror $ 96.99 Powder Room Martin Installation Door Hardware/Toilet $ 250.00 Powder Room Greg Installation Powder Rm Accessories/Vanity $ 479.93 Powder Room Floor & Décor Wall Tile $ 418.32 Master Bath Floor & Décor Shower Floor Tile $ 237.61 Master Bath Floor & Décor Bathroom Floor Tile $ 484.01 Master Bath Emilio Installation All Master Tile $ 9,850.00 Master Bath Lowes Shower Valve/Head $ 289.98 Master Bath Emilio Installation Showerhead $ (150.00) Refund Emilio Installation Tub and Filler $ (500.00) Refund Emilio Installation Tile Compl. $ (335.00) Refund Emilio Framing, Additional Demo in Wall, Drywall, Van $ 2,500.00 Master Bath Lowes Vanity $ 2,370.52 Master Bath Lowes Toilet $ 268.42 Master Bath Home Depot Misc. ABS Piping, Lumber, Copper, Silicon, etc. $ 149.01 Home Depot Electrical Materials: Outlets, boxes, Connectors $ 331.65 Bonum Electrical Labor $ 250.00 $ 34,723.87 Contractor/Supplier Scope of Work/Proudct Amount Location Horacio Demo $ 4,500.00 Downstairs Home Depot Plastic Sheeting $ 179.48 Downstairs Floor & Décor Flooring $ 3,116.46 Downstairs Floor & Décor Underlayment $ 566.99 Downstairs Emilio Installation Flooring $ 5,450.00 Downstairs Home Depot Baseboards $ 1,342.23 Downstairs Emilio Installation Baseboards $ 1,650.00 Downstairs Home Depot Door Hardware/Millwork $ 236.66 Downstairs Lowes Toilet $ 268.42 Powder Room Home Depot Vanity $ 279.20 Powder Room Lowes Vanity Lights, Towel Ring $ 142.99 Powder Room Lowes Mirror $ 96.99 Powder Room Martin Installation Door Hardware/Toilet $ 250.00 Powder Room Greg Installation Powder Rm Accessories/Vanity $ 479.93 Powder Room Floor & Décor Wall Tile $ 418.32 Master Bath Floor & Décor Shower Floor Tile $ 237.61 Master Bath Floor & Décor Bathroom Floor Tile $ 484.01 Master Bath Emilio Installation All Master Tile $ 9,850.00 Master Bath Lowes Shower Valve/Head $ 289.98 Master Bath Emilio Installation Showerhead $ (150.00) Refund Emilio Installation Tub and Filler $ (500.00) Refund Emilio Installation Tile Compl. $ (335.00) Refund Emilio Framing, Additional Demo in Wall, Drywall, Van $ 2,500.00 Master Bath Lowes Vanity $ 2,370.52 Master Bath Lowes Toilet $ 268.42 Master Bath Home Depot Misc. ABS Piping, Lumber, Copper, Silicon, etc. $ 149.01 Home Depot Electrical Materials: Outlets, boxes, Connectors $ 331.65 Bonum Electrical Labor $ 250.00 Paypal Merchant CC Fee $ 275.91 Payment Initial Deposit Cash $ (15,000.00) Payment 2nd Payment Cash $ (5,000.00) Payment 3rd Payment Paypal CC $ (5,275.91) Payment 4th Payment Cash $ (5,000.00) $ 4,723.87 INVOICE Development & Construction Gerald Turner [email redacted] / 480-227-4704 DATE: 12/3/2023 FOR:

Project: Illinois Street Location:

Subtotal $35,800 Overhead / Developer Fees $5,370

Deposit Required - Start work Friday Sept 29 TOTAL: $41,170 ****IMPORTANT - PLEASE READ****

Upon Signing this agreement, you confirm that you understand all details of the process for this project including but not limited to the turnaround time frames for architects, engineers, city & health permits, payment schedule, project start date and anticipated deadlines that come with each project phase, all change orders are agreed upon by all parties (client, sub, GC) before initiating. We do not move, remove or relocate owner furnished equipment unless we are paid to do so and we are not responsible for any damages to owner furnished equipment during the moving process. ANY DEMO COST QUOTED POTENTIALLY COULD CHANGE AFTER WE OPEN UP THE WALLS AND/OR DEMO EXISTING FLOORING AS WE DO NOT KNOW THE CONDITION INSIDE THE WALLS OR THE CONDITIION OF THE FLOORING UNTIL AFTER WE START OR COMPLETE DEMO. We are not responsible for incorrectly ordered owner furnished equipment or materials. This estimate is based on the information provided in the most recent drawings. Communication is key throughout this project. Abiding by this contract is necessary in order to reduce stress, limit construction delays and keep all payments on time. BY ACCEPTING THIS PROPOSAL, YOU ARE APPROVING THE PRICING AND THE PAYMENT SCHEDULE. PAYMENT DELAYS CAN AFFECT THE DURATION. The cost of this estimate is good for 30 days.

Signature Date

DESCRIPTION AMOUNT Dumpster Rentals $1,300

Dowstairs Flooring/Baseboards/Door Trim and Hardware - Includes furnish all materials, flooring trim and hardware - includes $13,550 demo and install Half Bath Remodel - Includes furnishing new vanity, toilet, sink, faucet, mirror and lighting, Includes installation of all equipment $1,900 and fixtures and includes demo of all existing equipment

Master Bath - Includes all demo. Includes the furnishing of a stand alone tub, toilet, vanity, sink, faucet, mirror lighting, shower $16,050 head and valvle, shower glass and all tile. Includes installation of all items

Project Manager/Supervisor ($1000 Week) $2,000

Allowance Fee for removing cabinets for flooring install. If we do not need to remove, you will not be charged this line item fee $1,000 3/14/24, 4:40 PM State of Arizona Mail - Document

Todd Anderson <[email redacted]>

Document messages

AMNA NABRI <[email redacted]> To: Todd Anderson <[email redacted]>

Hi Todd, It was a pleasure meeting you today, this is the termination document he sent me after I told him I want to terminate the contract between us on December 8th 2023, I asked him to revise it be Regards Amna

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted]… 1/5 3/14/24, 4:40 PM State of Arizona Mail - Document

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted]… 2/5 3/14/24, 4:40 PM State of Arizona Mail - Document

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted]… 3/5 3/14/24, 4:40 PM State of Arizona Mail - Document

Sent from my iPhone

Todd Anderson <[email redacted]> Thu, Mar 14, 2024 at 4:39 PM To: AMNA NABRI <[email redacted]>

Amna,

Thank you for the document. I will put it in the case file.

I did check on Bonum Develop[ent's license. It is active and in good standing at this point.

I should have my report out by the end of next week.

Todd Anderson Investigator #227

Arizona Registrar of Contractors Construction Investigations 1700 W Washington St., Ste 105 Phoenix, AZ 85007 Phone: (602) 771-6769

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted]… 4/5 3/14/24, 4:40 PM State of Arizona Mail - Document Email: [email redacted]

[Quoted text hidden]

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted]… 5/5 3/21/24, 4:50 PM State of Arizona Mail - Document

Todd Anderson <[email redacted]>

Document AMNA NABRI <[email redacted]> Wed, Mar 20, 2024 at 1:15 PM To: Todd Anderson <[email redacted]>

Hi Todd, I hope you’re doing good, I want to ask after you put your report how long do you give Bonum to start fixing and finish what they didn’t finish, and what if they didn’t respond? Like I mentioned before the email he sent titled meeting recap consider a confession to his handling my project unprofessionally! I really need to finish this project it’s been too long since we started! Regards Amna Sent from my iPhone

On Mar 14, 2024, at 8:19 PM, AMNA NABRI <[email redacted]> wrote:

Thanks [Quoted text hidden]

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permmsgid=msg-f:[number redacted]&simpl=msg-f:[number redacted]… 1/1 3/26/24, 11:25 AM State of Arizona Mail - Document

Todd Anderson <[email redacted]>

Document AMNA NABRI <[email redacted]> Fri, Mar 22, 2024 at 11:46 AM To: Todd Anderson <[email redacted]>

Hi Todd, Since we got the wrong mirror and light for the master bathroom, is it ok to take them back to exchange with the right one, I am just wondering if it’s going to late to do that if I wait until he comes back to do that, I don’t have any contact with them, I am waiting for your report and we can go from here. If I take them now I think I have to pay the difference, or you think I should wait, I hope Home Depot can exchange after all this time. Regards Amna Sent from my iPhone

On Mar 21, 2024, at 4:58 PM, Todd Anderson <[email redacted]> wrote:

[Quoted text hidden]

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permmsgid=msg-f:[number redacted]&simpl=msg-f:[number redacted]… 1/1 DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44

Client Contract Agreement

This agreement (“Contract”) is made and entered into on 9/21/23 by and between

Amna Nabri (“Owner”) and Bonum DC (“Contractor”). The Owner and Contractor agree

as follows:

The Contractor will perform and/or hire the sub-contractors to perform the required scope of

work outlined in the architectural drawings for the

Illinois St Residential ____________________________________________ (“Project”) that is located at 3941S.

Illinois Street Chandler, AZ. If architectural drawings are not available for this project, the The client was not charged for owner and owner representative understand that there is a higher risk for unforeseen these unforeseen construction expenses that the contractor will not be responsible for financially. The expenses.

Contractor will assume the financial responsibility for all assigned Contractor furnished

equipment, finishes and fixtures that have been outlined in the related architectural

drawings and/or presented to the contractor by the owner to be listed out in the attached The Client was not charged for estimate. If the contractor furnished equipment, finishes and fixtures are not listed out in the items such as paint, hooks etc not listed attached estimate, the contractor will not be responsible for them. on the estimate Contractor shall perform the scope of work outlined in the documents attached to the satisfaction $40,000.00 of the Owner for the estimated price of $__________________. DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 The Contractor shall immediately notify the Owner in writing of any potential change orders

that will alter the project work and expenses. Before performing the work required by the

change orders, the owner and contractor will document and sign a separate contract

agreement related to each individual change order. The Contractor and the Owner agree that

no change order or other form of order or directive will be considered valid unless it is

delivered in writing by Owner to Contractor.

Communication with the sub-contractors regarding the project schedule, construction

instructions and financial matters shall only take place between the contractor and the

contractor’s subcontractors. The owner agrees not to discuss the project schedule,

construction instructions and financial matters with the subcontractor. The contractors

subcontractors will be informed not to take direction regarding construction related matters

from the owner as this is what is best for the project. If the owner would like to make changes

to the project and/or offer construction instructions, the owner must talk directly with the

contractor. Furthermore, the contractor and subcontractors are to first abide by the city codes

and architectural drawings before considering direction from the owner; this is necessary to

protect the best interest of the owner, the project and all others involved.

This contract starts after the owner and the contractor both have signed this contract agreement

and after the initial required deposit from the owner has been made to the contractor and the funds

for that payment have been released into the contractor’s bank account. The contractor cannot

begin scheduling until the deposit has been made and cleared the contractor’s bank account. The

contract ends after the owner and the city inspectors and/or building owner approve and sign off DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 on all work. The contractor will warranty all labor for one year. Any equipment furnished by the

contractor shall come with the manufacturer’s warranty.

The contractor agrees to carry the required insurance at all times during this project.

This Contract is subject to and shall be interpreted under the law of the State of

Arizona.

The owner may terminate this agreement with written notice but the owner will still be responsible for paying

the contractor for all work performed by the contractor and the contractor’s subcontractors up to the final date

outlined in the owner’s notice to terminate the contract agreement. The contractor may stop work at anytime

and/or terminate the contract agreement at anytime with written notice if the owner is not paying the

contractor as outlined in this agreement the owner will still be responsible for paying the contractor for all work

performed by the contractor and the contractor’s subcontractors up to the final date outlined in the owner’s

notice to terminate the contract agreement. The contractor may also terminate the contract agreement if the

owner breaches this contract agreement.

The Contractor shall employ only competent and skilled workmen and foremen in the conduct

of work on this Contract. The Contractor shall at all times enforce strict discipline and good

order among Contractor’s employees.

All disputes will be handled accordingly and legally under the laws of the State of

Arizona. All invoices shall be sent to the Owner’s Project Manager identified in this

Contract. DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Owner will make payments for services on a monthly basis for services performed during the

previous month in accordance with this Contract unless a project specific payment

contract agreement has been assigned to this project and attached to this contract

agreement. Materials will be payable on a reimbursable basis plus the agreed-to additional

fees for overhead, handling, and General and Administrative (G&A) costs.

If any terms, conditions or provisions of this Contract shall be held unconstitutional, illegal or

void, such finding shall not affect any other terms, conditions or provisions of this Contract.

Amna Nabri

9/21/2023

9/21/2023 DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44

PAYMENT TERMS:

50% Deposit 25% payment after 50% of work is completed 25% upon completion

$5000 cash was paid to Bonum date of signing. The remaining $15,000 to be paid in the next 48 hours

SPECIAL PROJECT TERMS: Licensed Complaint Form Departmental Use Only For Current or Suspended Licensees

Person Filing Complaint Full Name (First Middle Last) Business Name (if a licensed contractor or supplier) ROC License Number(s) (if any)

Amna Nabri Mailing Address (Enter jobsite in Contract/Project section) City State Zip

3941 s Illinois st Chandler Arizona 85348 Phone Number Email

[number redacted] [email redacted] I consent to receive communications electronically in connection with this case Name of Attorney (if any)

Street Address of Attorney City State Zip

Phone Number of Attorney Email of Attorney

Contractor Information Name (as shown on contract/invoice) ROC License Number(s)

Bonum Development & Construction, LLC ROC 344755 Street Address City State Zip

1204 East Baseline Rd Tempe Arizona 85204 Phone Number Email

[number redacted] [email redacted] Name of Person(s) Representing License

Jen Spangler;Zack Engelking Contract/Project Information Contract Date Contract Amount Amount Paid

September 21, 2023 $40,000.00 $30,275.91 Date Work Started Date Work Stopped Date Work Was Completed

September 29, 2023 November 10, 2023 Close of Escrow (New Home) Move-In Date (New-Home)

Jobsite Street Address City State Zip

3941 S Illinois St Chandler AZ 85248 Name of Construction Site Owner Construction Site Name (if applicable)

Phone Number of Construction Site Owner Email of Construction Site Owner

This complaint is for Poor Work;Other I have contacted the contractor by Have you filed a complaint in court? No Has any work been corrected? No

RCC099 12/05/18 Page 1 of 2 Licensed Complaint Form Departmental Use Only For Current or Suspended Licensees

The contract was Written All change orders were Both This project was Residential This project involved Remodel

A building permit was obtained by N/A List and briefly describe each complaint item (Please do not write "see attached" or use additional pages unless necessary to further describe issues or list more complaint items) (limited to 100 characters per line)

Contract was based on having project completed in two weeks, contractor failed to follow through schedule. Contractor pressured me to provided him more than 50% of the cost before starting the project. Contractor failed to order products in a timley manner, failed to respond with updates when requested. Financial statements changes Allegations Listed on Complaint:

Powder room vanity size is not the one I approved, light fixture position installed incorrectly and no paint

Master bathroom is not completed. no toilet, no tub/plumbing, no light fixtures, only part of the tile was installed

Damages to my stove when crew demoed downstairs , damaged front door and furniture

Crew did not cover my furniture when demo was conducted, furniture is very dusty

Downstairs flooring was changed to cheaper poor quality due to being under pressure to finish the project sooner.

Signature I declare under penalty of perjury that the information and documents contained on this Complaint Form, included with this complaint, or hereafter submitted in support of this complaint are true and accurate to the best of my knowledge. I will assist in the investigation or in the prosecution of the contractor or other parties, and will, if necessary, attend hearings and testify to facts. Printed Name Signature Date

Amna Nabri \complainant1\ \complainantd1\

RCC099 12/05/18 Page 2 of 2 $5000 discount given early on in the project - Bonum only profited $370 for this project, contractually.

Savings for Amna - we did not charge to move furniture We did not charge extra for the plumbing for the tub. After opening up the walls, we determined that there were more changes needed to be made in order to plumb into the free standing tub faucet. ($550 savings and actual hard cost that Bonum's tile installer is literally paying for) Savings: Client is receiving free chandelier and free electrical rewiring for all vanity lighting $1170 discount given which includes time and labor ($450 savings before Bonum started and actual hard cost that Bonum is literally the project - Bonum only paying for) is receiving $830 for project management

Savings: Client did not get charged for painting. Bonum to provide a touch up paint at first and a final painting when the project is completed ($750 savings and actual hard cost that Bonum is literally paying for)

Savings: Client did not get charged for purchasing and installing towel hooks and toilet paper hooks. ($350 savings and actual hard cost that Bonum is literally paying for)

Total literal hard cost savings: $2100 (Funds that come direct from Bonum's pocket

Total literal soft cost savings: $6170 (Funds that Bonum does not receive)

Total Contractural Costs that Bonum Receives: $1200 However, due to the amount of extra management time (calls, texts, site visits etc, Bonum loses money on this project) Customer Service Information: www.bankofamerica.com 1.800.421.2110 Mail billing inquiries to: P.O. BOX 15284 Bank of America WILMINGTON, DE 19850 P.O. Box 672050 Dallas TX 75267-2050 Mail payment to: Bank of America P.O. Box 851001 Dallas TX 75285-1001

AMNA NABRI 3941 S ILLINOIS ST CHANDLER AZ 85248-4535

October 6 - November 5, 2023

Account Summary/Payment Information New Balance Total $5,275.91 Current Payment Due $52.00 Previous Balance $0.00 Total Minimum Payment Due $52.00 Payments and Other Credits $0.00 Payment Due Date 12/02/2023 Purchases and Adjustments $5,275.91

Fees Charged $0.00 Interest Charged $0.00

New Balance Total Late Payment Warning: If we do not receive your Total Minimum $5,275.91 Payment by the date listed above, you may have to pay a late fee of up to Total Credit Line $14,000.00 $40.00 and your APRs may be increased up to the Penalty APR of 29.99%. Total Credit Available $8,724.09 Total Minimum Payment Warning: If you make only the Total Minimum Cash Credit Line $2,800.00 Payment each period, you will pay more in interest and it will take you Portion of Credit Available longer to pay off your balance. For example: for Cash $2,800.00 If you make no additional You will payoff the And you will end up Statement Closing Date 11/05/2023 charges using this card balance shown on this paying an estimated Days in Billing Cycle 31 and each month you pay statement in about total of

Only the Total 16 years $11,025.00 Minimum Payment

$174.00 36 months $6,264.00 (Savings = $4,761.00)

If you would like information about credit counseling services, call 866.300.5238.

[number redacted]

BANK OF AMERICA Account Number: P.O. BOX 851001 DALLAS TX 75285-1001 Payment Due Date 12/02/2023 New Balance Total $5,275.91 Total Minimum Payment Due $52.00

AMNA NABRI Enter payment amount $ 3941 S ILLINOIS ST .

CHANDLER AZ 85248-4535 For change of address/phone number, see reverse side. Make your payment online at www.bankofamerica.com or Mail this coupon along with your check payable to: Bank of America

A524022250A 19620668672065C AMNA NABRI ! Account #5 ! October 6 - November 5, 2023

004 - 000 - 000 - G

IMPORTANT INFORMATION ABOUT THIS ACCOUNT

PAYING INTEREST - We will not charge interest on Purchases on the next CALCULATION OF BALANCES SUBJECT TO INTEREST RATE statement if you pay the New Balance Total in full by the Payment Due Date, Average Daily Balance Method (including new Purchases): We calculate and you had paid in full by the previous Payment Due Date. We will begin separate Balances Subject to an Interest Rate for Purchases and for each charging interest on Balance Transfers and Cash Advances on the transaction Introductory or Promotional Offer balance consisting of Purchases. We do this date. by: (1) calculating a daily balance for each day in the billing cycle; (2) adding all TOTAL INTEREST CHARGE COMPUTATION - Interest Charges accrue and the daily balances together; and (3) dividing the sum of the daily balances by are compounded on a daily basis. To determine the Interest Charges, we the number of days in the billing cycle. multiply each Balance Subject to Interest Rate by its applicable Daily Periodic To calculate the daily balance for each day in this statement's billing cycle, we: Rate and that result is multiplied by the number of days in the billing cycle. To (1) take the beginning balance; (2) add an amount equal to the applicable Daily determine the total Interest Charge for the billing cycle, we add the Periodic Periodic Rate multiplied by the previous day's daily balance; (3) add new Rate Interest Charges together. A Daily Periodic Rate is calculated by dividing Purchases, new Account Fees, and new Transaction Fees; and (4) subtract an Annual Percentage Rate by 365. applicable payments and credits. If any daily balance is less than zero we treat HOW WE ALLOCATE YOUR PAYMENTS - Payments are allocated to it as zero. posted balances. If your account has balances with different APRs, we will Average Balance Method (including new Balance Transfers and new Cash allocate the amount of your payment equal to the Total Minimum Payment Due Advances): We calculate separate Balances Subject to an Interest Rate for to the lowest APR balances first (including transactions made after this Balance Transfers, Cash Advances, and for each Introductory or Promotional statement). Payment amounts in excess of your Total Minimum Payment Due Offer balance consisting of Balance Transfers or Cash Advances. We do this by: will be applied to balances with higher APRs before balances with lower APRs. (1) calculating a daily balance for each day in this statement's billing cycle; (2) IMPORTANT INFORMATION ABOUT PAYMENTS BY PHONE - When calculating a daily balance for each day prior to this statement's billing cycle using the optional Pay-by-Phone service, you authorize us to initiate an that had a "Pre-Cycle balance" - a Pre-Cycle balance is a Balance Transfer or a electronic payment from your account at the financial institution you designate. Cash Advance with a transaction date prior to this statement's billing cycle but You must authorize the amount and timing of each payment. For your with a posting date within this statement's billing cycle; (3) adding all the daily protection, we will ask for security information. To cancel, call us before the balances together; and (4) dividing the sum of the daily balances by the number scheduled payment date. Same-day payments cannot be edited or canceled. of days in this statement's billing cycle. YOUR CREDIT LINES - The Total Credit Line is the amount of credit To calculate the daily balance for each day in this statement's billing cycle, we: available for the account; however, only a portion of that is available for Bank (1) take the beginning balance; (2) add an amount equal to the applicable Daily Cash Advances. The Cash Credit Line is that amount you have available for Periodic Rate multiplied by the previous day's daily balance; (3) add new Bank Cash Advances. Generally, Bank Cash Advances consist of ATM Cash Balance Transfers, new Cash Advances and Transaction Fees; and (4) subtract Advances, Over the Counter (OTC) Cash Advances, Same-Day Online Cash applicable payments and credits. If any daily balance is less than zero we treat Advances, Overdraft Protection Cash Advances, Cash Equivalents, and it as zero. applicable transaction fees. To calculate a daily balance for each day prior to this statement's billing cycle MISCELLANEOUS - Promotional Rate End Date: This date is based on a that had a Pre-Cycle balance: (1) we take the beginning balance attributable future statement closing date. If you change your payment due date, this date solely to Pre-Cycle balance (which will be zero on the transaction date of the could change. The New Balance Total which appears on this statement is not a first Pre-Cycle balance); (2) add an amount equal to the applicable Daily payoff amount and may be subject to additional interest charges when you pay Periodic Rate multiplied by the previous day's daily balance; (3) and add only in full after your statement closing date. Virtual cards are the digital form of the applicable Pre-Cycle balances and their related Transaction Fees. We your eligible physical credit cards stored within a digital wallet. exclude from this calculation all transactions posted in previous billing cycles.

© 2023 Bank of America Corporation For the complete terms and conditions of your account, consult your Credit Card Agreement. This account is issued and administered by Bank of America. Bank of America is a registered trademark of Bank of America Corporation.

PAYMENTS - We credit mailed payments as of the date received, if the payment is: (1) received by 5 p.m. local time at the address shown on the remittance portion of your monthly statement; (2) paid with a check drawn in U.S. dollars on a U.S. financial institution or a U.S. dollar money order; and (3) sent in the return envelope with only the remittance portion of your statement accompanying it. Payments received by mail after 5 p.m. local time at the remittance address on any day including the Payment Due Date, but that otherwise meet the above requirements, will be credited as of the next day. Payments made online or by phone will be credited as of the date of receipt if made by 5 p.m. Central. Credit for any other payments may be delayed up to five days. Cash payments made with our tellers will only be accepted with a valid identification (ID). No payment shall operate as an accord and satisfaction without the prior written approval of one of our Senior Officers. We process most payment checks electronically by using the information found on your check. Each check authorizes us to create a one-time electronic funds transfer (or process it as a check or paper draft). Funds may be withdrawn from your account as soon as the same day we receive your payment. Checks are not returned to you. If you have authorized us to pay your credit card bill automatically from your savings or checking account with us, you can stop the payment on any amount you think is wrong. To stop payment, your letter must reach us at least three business days before the automatic payment is scheduled to occur.

Change of Address/Phone number: Online at www.bankofamerica.com

Please do not add any written communication in this space.

AB AMNA NABRI ! Account ! October 6 - November 5, 2023

Transactions Transaction Posting Reference Account Date Date Description Number Number Amount Total

Purchases and Adjustments 10/06 10/09 PAYPAL *BONUM [number redacted] AZ 3715 2065 5,275.91 TOTAL PURCHASES AND ADJUSTMENTS FOR THIS PERIOD $5,275.91

Interest Charged 11/05 11/05 INTEREST CHARGED ON PURCHASES 0.00 11/05 11/05 INTEREST CHARGED ON BALANCE TRANSFERS 0.00 11/05 11/05 INTEREST CHARGED ON DIR DEP&CHK CASHADV 0.00 11/05 11/05 INTEREST CHARGED ON BANK CASH ADVANCES 0.00 TOTAL INTEREST CHARGED FOR THIS PERIOD $0.00

2023 Totals Year-to-Date

Total fees charged in 2023 $0.00

Total interest charged in 2023 $0.00

Interest Charge Calculation Your Annual Percentage Rate (APR) is the annual interest rate on your account.

Type of Annual Promotional Promotional Promotional Balance Interest Balance Percentage Transaction Offer ID Rate End Subject to Charges by Rate Type Date Interest Transaction Rate Type

Purchases 18.24% V $ 0.00 $ 0.00 Promotional APR 0.00% PUR, WT LM23-60777 12/05/2024 $ 0.00 $ 0.00 Balance Transfers 18.24% V $ 0.00 $ 0.00 Direct Deposit and Check Cash 21.24% V $ 0.00 $ 0.00 Advances Bank Cash Advances 29.24% V $ 0.00 $ 0.00

APR Type Definitions Promotional Transaction Types: PUR = Purchase, WT = Non-Bank Wire Transfer; Daily Interest Rate Type: V= Variable Rate (rate may vary); APR Type: Promotional APR (APR for limited time on eligible transactions)

AMNA NABRI ! Account ! October 6 - November 5, 2023

Important Messages You can request a copy of this statement in either Braille or Large Print by calling 800.432.1000 or going to bankofamerica.com and enter Visually Impaired Access from the home page.

Your Reward Summary 52.76 Base Cash Back Earned

50.00 Category Bonus Earned Make the most of your 25.69 Relationship Bonus Earned rewards program today! 200.00 Other Bonus Earned

328.45 Total Cash Back Available

INVOICE

Development & Construction Gerald Turner [email redacted] / 480-227-4704 DATE: 12/3/2023 FOR:

Project: Illinois Street Location:

FINAL TOTAL PROJECT INVOICE

Subtotal $30,871 Overhead / Developer Fees $4,631

TOTAL: $35,502 ****IMPORTANT - PLEASE READ****

Upon Signing this agreement, you confirm that you understand all details of the process for this project including but not limited to the turnaround time frames for architects, engineers, city & health permits, payment schedule, project start date and anticipated deadlines that come with each project phase, all change orders are agreed upon by all parties (client, sub, GC) before initiating. We do not move, remove or relocate owner furnished equipment unless we are paid to do so and we are not responsible for any damages to owner furnished equipment during the moving process. ANY DEMO COST QUOTED POTENTIALLY COULD CHANGE AFTER WE OPEN UP THE WALLS AND/OR DEMO EXISTING FLOORING AS WE DO NOT KNOW THE CONDITION INSIDE THE WALLS OR THE CONDITIION OF THE FLOORING UNTIL AFTER WE START OR COMPLETE DEMO. We are not responsible for incorrectly ordered owner furnished equipment or materials. This estimate is based on the information provided in the most recent drawings. Communication is key throughout this project. Abiding by this contract is necessary in order to reduce stress, limit construction delays and keep all payments on time. BY ACCEPTING THIS PROPOSAL, YOU ARE APPROVING THE PRICING AND THE PAYMENT SCHEDULE. PAYMENT DELAYS CAN AFFECT THE DURATION. The cost of this estimate is good for 30 days.

Signature Date

DESCRIPTION AMOUNT Supervision $2,000

Supervision Discount -$2,000

Floor Demo $4,500

Tile Installation and Plumbing (Shower and Floor): Includes all Tile $10,906

Misc. Master Bathroom including framing, painting and shower glass - including hardware, lighting , hooks/rack $3,550

Flooring and Baseboards: Furnish and Install including furnish install of all door hardware $10,715

Powder Room: Drywall Repair, Install Toilets, Vanity, Lighting, Faucet, Hooks $1,505

All Electrical Work - Furnish Materials and Install Labord $632

Master Tub, Toilet, Vanity and Valve Shower Head $4,064

Client Discount (This discount is taken directly from Bonum's profit of $4631 that Bonum was scheduled to profit) -$5,000

Total Client Discount: $7000 Contractor/Supplier Scope of Work/Proudct Amount Location Horacio Demo $ 4,500.00 Downstairs Home Depot Plastic Sheeting $ 179.48 Downstairs Floor & Décor Flooring $ 3,116.46 Downstairs Floor & Décor Underlayment $ 566.99 Downstairs Emilio Installation Flooring $ 5,450.00 Downstairs Home Depot Baseboards $ 1,342.23 Downstairs Emilio Installation Baseboards $ 1,650.00 Downstairs Home Depot Door Hardware/Millwork $ 236.66 Downstairs Lowes Toilet $ 268.42 Powder Room Home Depot Vanity $ 279.20 Powder Room Lowes Vanity Lights, Towel Ring $ 142.99 Powder Room Lowes Mirror $ 96.99 Powder Room Martin Installation Door Hardware/Toilet $ 250.00 Powder Room Greg Installation Powder Rm Accessories/Vanity $ 479.93 Powder Room Floor & Décor Wall Tile $ 418.32 Master Bath Floor & Décor Shower Floor Tile $ 237.61 Master Bath Floor & Décor Bathroom Floor Tile $ 484.01 Master Bath Emilio Installation All Master Tile $ 9,850.00 Master Bath Lowes Shower Valve/Head $ 289.98 Master Bath Emilio Installation Showerhead $ (150.00) Refund Emilio Installation Tub and Filler $ (500.00) Refund Emilio Installation Tile Compl. $ (335.00) Refund Emilio Framing, Additional Demo in Wall, Drywall, Van $ 2,500.00 Master Bath Lowes Vanity $ 2,370.52 Master Bath Lowes Toilet $ 268.42 Master Bath Home Depot Misc. ABS Piping, Lumber, Copper, Silicon, etc. $ 149.01 Home Depot Electrical Materials: Outlets, boxes, Connectors $ 331.65 Bonum Electrical Labor $ 250.00 Paypal Merchant CC Fee $ 275.91 Payment Initial Deposit Cash $ (15,000.00) Payment 2nd Payment Cash $ (5,000.00) Payment 3rd Payment Paypal CC $ (5,275.91) Payment 4th Payment Cash $ (5,000.00) $ 4,723.87 Contractor/Supplier Scope of Work/Proudct Amount Location Horacio Demo $ 4,500.00 Downstairs Home Depot Plastic Sheeting $ 179.48 Downstairs Floor & Décor Flooring $ 3,116.46 Downstairs Floor & Décor Underlayment $ 566.99 Downstairs Emilio Installation Flooring $ 5,450.00 Downstairs Home Depot Baseboards $ 1,342.23 Downstairs Emilio Installation Baseboards $ 1,650.00 Downstairs Home Depot Door Hardware/Millwork $ 236.66 Downstairs Lowes Toilet $ 268.42 Powder Room Home Depot Vanity $ 279.20 Powder Room Lowes Vanity Lights, Towel Ring $ 142.99 Powder Room Lowes Mirror $ 96.99 Powder Room Martin Installation Door Hardware/Toilet $ 250.00 Powder Room Greg Installation Powder Rm Accessories/Vanity $ 479.93 Powder Room Floor & Décor Wall Tile $ 418.32 Master Bath Floor & Décor Shower Floor Tile $ 237.61 Master Bath Floor & Décor Bathroom Floor Tile $ 484.01 Master Bath Emilio Installation All Master Tile $ 9,850.00 Master Bath Lowes Shower Valve/Head $ 289.98 Master Bath Emilio Installation Showerhead $ (150.00) Refund Emilio Installation Tub and Filler $ (500.00) Refund Emilio Installation Tile Compl. $ (335.00) Refund Emilio Framing, Additional Demo in Wall, Drywall, Van $ 2,500.00 Master Bath Lowes Vanity $ 2,370.52 Master Bath Lowes Toilet $ 268.42 Master Bath Home Depot Misc. ABS Piping, Lumber, Copper, Silicon, etc. $ 149.01 Home Depot Electrical Materials: Outlets, boxes, Connectors $ 331.65 Bonum Electrical Labor $ 250.00 $ 34,723.87 5/9/24, 11:25 AM Received Legal State of Arizona Mail - Case 2024-01748 - Citation and Complaint - RESPONSE

05/09/2024 Legal New Mail - AZROC <[email redacted]>

Case 2024-01748 - Citation and Complaint - RESPONSE messages

Gerald Turner <[email redacted]> Thu, May 9, 2024 at 11:20 AM To: "[email redacted]" <[email redacted]>, Legal New Mail - AZROC <[email redacted]>

Bonum does not agree with the citation. How is Bonum supposed to complete the project when the client wanted to terminate the contract on two different occasions. Please review all documents attached. It is clear as day through her text messages that she wanted to terminate the contract.

There are multiple emails attached showing that we have tried to resolve this matter. Bonum cannot do work for free. Bonum has given her more than enough friendly discounts. Please review ALL documents.

Please use this email address moving forward, not [email redacted]

Bonum

From: Gerald Turner <[email redacted]> Sent: Thursday, May 9, 2024 11:03 AM To: Gerald Turner <[email redacted]> Subject: Fw: Case 2024-01748 - Citation and Complaint - DO NOT REPLY

Gerald Turner Bonum 480-227-4704

From: Tedi Quezada <[email redacted]> Sent: Tuesday, April 23, 2024 8:00 AM To: Gerald Turner <[email redacted]> Subject: Case 2024-01748 - Citation and Complaint - DO NOT REPLY

Hello,

Attached is an electronic courtesy copy of the Citation and Complaint issued in Case 2024-01748. This document was also sent to your attention via US Mail and Certified Mail.

PLEASE DO NOT REPLY DIRECTLY TO THIS EMAIL. Any reply or response should be addressed to [email redacted]

Thank you

Tedi Quezada Legal Assistant II Legal Department Arizona Registrar of Contractors Main: 602.542-1525

Email: [email redacted]

The ROC is now on social media! Make sure to follow us on:

Fill out AZ ROC's survey to let us know how we're doing and how we can better serve you!

attachments 20240423 Citation and Complaint 2024-01748 MAIL.pdf 12370K Bonum_Client_Contract_Agreement_with_Amna_Nabri[1].pdf 241K Illinois_St_Timeline[1].pdf 34K

https://mail.google.com/mail/b/AEoRXRSseHLhnnZGDC17V06cpIBAY_tMMJTyKILx8ZnEHU5sk_6R/u/0/?ik=d3afebeda9&view=pt&search=all&permt… 1/2 5/9/24, 11:25 AM Received Legal State of Arizona Mail - Case 2024-01748 - Citation and Complaint - RESPONSE

05/09/2024 Illinois_text_thread_between_Bonum_and_the_ROC[1].pdf 1032K Illinois_Text_Thread_from_Jan_25_just_before_the_ROC_complaint[1].pdf 1219K Illinois_Text_Thread_from_Jan_25_just_before_the_ROC_complaint[1].pdf 1219K ITEMIZED_EMAIL[1].pdf 233K ITEMIZED_SHEET_PAGE_1[1].pdf 494K ITEMIZED_SHEET_PAGE_2_(1)[1].pdf 373K ITEMIZED_SHEET_PAGE_3[1].pdf 520K JAN_18_EMAIL_TO_AMNA_OFFER[1].pdf 207K EMAIL.pdf 527K EMAIL 2.pdf 820K

Legal New Mail - AZROC <[email redacted]> Thu, May 9, 2024 at 11:25 AM To: Gerald Turner <[email redacted]>

Good morning,

Is this your answer to citation? If so please send it to [email redacted] as it is the appropriate email listed on the Citation on how to file an answer.

Thank you,

Arizona Registrar of Contractors Legal Department

Fill out AZ ROC’s survey to let us know how we’re doing and how we can better serve you!

[Quoted text hidden]

https://mail.google.com/mail/b/AEoRXRSseHLhnnZGDC17V06cpIBAY_tMMJTyKILx8ZnEHU5sk_6R/u/0/?ik=d3afebeda9&view=pt&search=all&permt… 2/2 Received Legal 05/09/2024

REGISTRAR OF CONTRACTORS OF THE STATE OF ARIZONA

Amna Nabri, Case No. 2024-01748 COMPLAINANT, v. Bonum Development & Construction, LLC CITATION DBA: Bonum Development & Construction License No. ROC 344755,

RESPONDENT.

The Registrar issues this Citation to Bonum Development & Construction, LLC DBA: Bonum Development & Construction (“Respondent”) under A.R.S. § 32-1155(A). If Respondent fails to answer this Citation by May 8, 2024, then under A.R.S. § 32-1155(C), Respondent’s failure to answer may be deemed an admission of the act or acts charged in the underlying complaint, and the Registrar may then suspend or revoke Respondent’s license(s). THE WRITTEN COMPLAINT On February 12, 2024, Amna Nabri (“Complainant”) filed a written complaint with the Registrar. A copy of that Complaint is attached to this Citation. A FORMAL STATEMENT OF THE CHARGES AGAINST RESPONDENT The Registrar investigated this matter and finds cause to charge Respondent with violation(s) of Title 32, Chapter 10 of the Arizona Revised Statutes. Respondent is charged with violating: Charge :1 A.R.S. § 32-1154(A)(1) Abandonment of a contract or refusal to perform after submitting a bid on work without legal excuse for the abandonment or refusal.

of 5

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 Received Legal 05/09/2024

Charge :2 A.R.S. § 32-1154(A)(3) - R4-9-108(a) Violation of any rule adopted by the Registrar; Namely A.A.C. R4-9-108(a): A contractor shall perform all work in a professional and workmanlike manner. Charge :3 A.R.S. § 32-1154(A)(22) Failure to take appropriate corrective action to comply with this chapter or with rules adopted pursuant to this chapter without valid justification within a reasonable period of time after receiving a written directive from the Registrar. The written directive shall set forth the time within which the contractor is to complete the remedial action. The time permitted for compliance shall not be less than fifteen days from the date of issuance of the directive. A license shall not be revoked or suspended nor shall any other penalty be imposed for a violation of this paragraph until after a hearing has been held.

If the matter proceeds to a hearing and the administrative law judge determines that any of the charges listed above are supported by a preponderance of the evidence, then Respondent’s license(s) may be subject to suspension or revocation, and Respondent may be subject to other penalties provided by law, including civil penalties under A.R.S. §§ 32-1154(E) and (F). FILING A WRITTEN ANSWER Respondent must appear by filing with the Registrar a written answer to the citation and complaint showing cause, if any, why Respondent’s license(s) should not be suspended or revoked. A.R.S. § 32-1155(A). Respondent’s written answer should contain the heading “Written Answer to Citation and Complaint” and should include the case number, which is Case No. 2024-01748. How to File a Written Answer: Respondent’s written answer may be submitted in the following ways:

of 5

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 Received Legal 05/09/2024

In-Person: 1700 W. Washington St., Ste. 105, Phoenix, Arizona, 85007-2812 Mail: P.O. Box 18244, Phoenix, Arizona, 85005-8244 Email: [email redacted] The Registrar’s normal office hours are 8:00 a.m. to 5:00 p.m., Monday through Friday. If Respondent submits a written answer by mail, it is not filed with the Registrar until the Registrar actually receives it. Deadline for Filing a Written Answer: Respondent must file a written answer with the Registrar no later than May 8, 2024. This deadline is calculated under A.R.S. §§ 32-1155(A) and (B), which provides a deadline ten days after service of the Citation. Service of the Citation and Complaint is complete five days after the Registrar mails a copy of the Citation and Complaint to Respondent’s latest address of record in the Registrar’s office. Consequences for Failing to File a Written Answer: If Respondent fails to answer, Respondent’s failure may be deemed an admission of the act or acts charged in the written complaint. A.R.S. § 32-1155(C). The Registrar may then suspend or revoke Respondent’s license(s). THE ADMINISTRATIVE HEARING If Respondent files a timely written answer contesting any charges in the Complaint, then the Registrar will request the Office of Administrative Hearings set a date for an administrative hearing and will notify all the parties at least 30 days before that hearing. A.R.S. § 41-1092.05(D). INVESTIGATOR’S APPEARANCE AS A WITNESS The Registrar’s assigned investigator will appear as a witness at the hearing. If either party demands the attendance at the hearing of any other person, that party must obtain and serve a subpoena in compliance with the rules and processes established by the Office of Administrative Hearings.

of 5

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 Received Legal 05/09/2024

RESPONDENT’S RIGHT TO REQUEST AN INFORMAL SETTLEMENT CONFERENCE Under A.R.S. § 41-1092.06, if Respondent submits a request to the Registrar for an informal settlement conference, the Registrar must hold a conference within 15 days after receiving the request. Respondent’s request for an informal settlement conference must be in writing and must be filed no later than 20 days before the administrative hearing. A.R.S. § 41- 1092.06(A). The Registrar will not close or settle any case without both parties’ appearance at the Settlement Conference. The parties participating in the settlement conference must have the authority to settle the case and must waive their right to object to the participation of the Registrar’s settlement conference representative in the final administrative decision. A.R.S. § 41-1092.06(B). Any statements, either written or oral, made by the parties at the conference, including a written document, created or expressed solely for the purpose of settlement negotiations, are inadmissible in the administrative hearing. A.R.S. § 41-1092.06(B). RESPONDENT’S PRIOR RECORD Under A.A.C. R4-9-117, in determining the appropriate discipline, the administrative law judge and the Registrar may consider not only facts in the current case, but also facts in prior cases and any documents regarding Respondent on file with the Registrar. Respondent’s prior disciplinary record and current license(s) status may be considered as a mitigating or aggravating factor in determining the appropriate discipline. EVIDENTIARY DISCLAIMER By issuing this Citation, the Registrar is directing Respondent to file a written answer to the Citation and Complaint, showing cause, if any, why Respondent’s license(s) should not be suspended or revoked. A.R.S. § 32-1155(A). This Citation does not constitute proof that any charge or allegation in Complainant’s written complaint is in fact true. This Citation does not

of 5

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 Received Legal 05/09/2024

constitute proof that Respondent violated any statutory provision or rule adopted by the Registrar. Dated April 23, 2024. By: /s/ Tedi Quezada Tedi Quezada Legal Assistant Legal Department Arizona Registrar of Contractors COPY of the foregoing mailed by Certified Mail, Return Receipt Requested, April 23, 2024 to:

Respondent Certified Mail No: [number redacted]

Bonum Development & Construction, LLC DBA: Bonum Development & Construction 2820 S Alma School Rd #18-456 Chandler, AZ 85286

Copy mailed by USPS First Class mail this same date to: Respondent Bonum Development & Construction, LLC DBA: Bonum Development & Construction 2820 S Alma School Rd #18-456 Chandler, AZ 85286

Complainant Amna Nabri 3941 S. Illinois St. Chandler, AZ 85348 Copy sent electronically this same date to: Respondent at email address on record with the Registrar Complainant at email address on record with the Registrar Case No. 2024-01748 of 5

1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 2/20/24, 11:00 AM Received Legal State of Arizona Mail - Complaint #2024-01748

05/09/2024 Todd Anderson <[email redacted]>

Complaint #2024-01748 message

AMNA NABRI <[email redacted]> Sat, Feb 17, 2024 at 10:25 AM To: "[email redacted]" <[email redacted]>

Sent from my iPhone

Begin forwarded message:

From: Gerald Turner <[email redacted]> Date: January 4, 2024 at 8:39:54 PM MST Subject: S. Illinois St. Project Meeting Recap

Amna (and family),

Your voice matters. We heard you. We listened. We should have listed more before and if we did not say it loud enough, we apologize for our short comings as a company and as humans.

By no means do I think our meeting, today, erases your bad experience with our company that you endured. We still have to come to an agreement, that is if we move forward together. First, you still have to think about whether you want to move forward or not. And if we move forward, the jury will still be out whether we will professionally complete the project or not, to your satisfaction. We know that you expect organization and timely communication.

The following is what I took note of, today: Flooring Downstairs - you do not like the quality of the product. You are happy with the labor installation but not happy with the product itself

Powder Bathroom:

Vanity - you are not happy with the vanity. I propose that we exchange the vanity for one that you like and highly recommend that you take me up on this suggestion (we can return and swap this item out for something new up to $75 more in price) Paint - you are not happy with the painting. I propose that we match the exact paint color that you need and paint the entire restroom (no additional cost) Vanity Hardware - we did not install black matte hardware to match the faucet. Please pick out the hardware that you want us to install and we will purchase it at no additional cost to you. Lighting - Needs to be lowered; we will lower it after we paint Mirror - Needs to be lowered; we will lower it after we paint

Master Bathroom:

Vanity Hardware - need to install gold hardware to match the faucet. Please pick out the hardware that you want us to install and we will purchase it at no additional cost to you. https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted] 1/3 2/20/24, 11:00 AM Received Legal State of Arizona Mail - Complaint #2024-01748

Toilet - Please allow us to install this tomorrow anytime between Tuesday and Thursday 05/09/2024 of next week. (As Jen mentioned, we will remove the toilet when it is time to complete the rest of the restroom) Shower Valve, Shower Head and Shower Drain - these are onsite and have not been installed. My recommendation is that our plumber installs these when they install the shower head, drain and valve. However, we understand that you would rather have all of the work done at one time, outside of the toilet (but please consider it) Shower Glass - was not installed; we will install it at no additional cost Tile - The remaining floor tile and wall tile needs to be installed The following items need to be selected by you and we will purchase them and install them at no additional cost: Mirror Vanity Lighting Tub Tub Filler Decorative Lighting above the Tub

Making sure that we are on the same page, when I reference "at no additional cost" that means, you would not pay any more than the balance of $4723.87 shown on Itemized Sheet 3 which would bring your total out of pocket cost for the entire project to $34,723.87.

Key Points to Successfully Resume the Project:

Amna and Bonum construct mutual terms to resume the project Amna selects the products, Bonum confirms the products will work, Bonum pays for the products Bonum does not schedule the work in until all products have been received; however, Bonum does create a tentative scheduled based on potential completed delivery dates Amna and Bonum collectively decide upon the installation dates and times based on Bonum

Professional Cleaning of your Furniture: If you have already had your furniture professionally cleaned, please provide us with a receipt and we will deduct that from your final payment. If you have not had your furniture professionally cleaned, please set up the cleaning and we will reimburse you for the cleaning.

Stove Damage and Front Door Damage - please allow us to reassess these damages and properly repair them as necessary

Financial Payment Method: Amna and Gerald to revisit the possibility of putting all of the billing on to Amna's home improvement credit card and refunding her cash.

If I am missing anything, please let me know.

We look forward to hearing from you for the next steps.

Gerald Turner Bonum 480-227-4704

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted] 2/3 2/20/24, 11:00 AM Received Legal State of Arizona Mail - Complaint #2024-01748

05/09/2024

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted] 3/3 2/21/24, 1:04 PM State of Arizona Mail - Complaint #2024-01748 Received Legal 05/09/2024 Todd Anderson <[email redacted]>

Complaint #2024-01748 AMNA NABRI <[email redacted]> Wed, Feb 21, 2024 at 11:05 AM To: Todd Anderson <[email redacted]>

Thanks. I just want to ask is it possible to move the site visit to March 11th instead of March 14th if not that’s ok . Regards Amna Sent from my iPhone

On Feb 21, 2024, at 8:22 AM, Todd Anderson <[email redacted]> wrote:

[Quoted text hidden]

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permmsgid=msg-f:[number redacted]&simpl=msg-f:[number redacted]… 1/1 2/21/24, 1:04 PM State of Arizona Mail - Complaint #2024-01748 Received Legal 05/09/2024 Todd Anderson <[email redacted]>

Complaint #2024-01748 Todd Anderson <[email redacted]> Wed, Feb 21, 2024 at 1:04 PM To: AMNA NABRI <[email redacted]>

I'm sorry, I am out in Phoenix on March 11th. If you are not available on the 14th, my next available time slot would be on March 20th at 9am. Let me know.

Todd Anderson Investigator #227

Arizona Registrar of Contractors Construction Investigations 1700 W Washington St., Ste 105 Phoenix, AZ 85007 Phone: (602) 771-6769 Email: [email redacted]

[Quoted text hidden]

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permmsgid=msg-a:r-[number redacted]&simpl=msg-a:r-[number redacted]… 1/1 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 2/22/24, 10:04 AM Received Legal State of Arizona Mail - Complaint #2024-01748

05/09/2024 Todd Anderson <[email redacted]>

Complaint #2024-01748 AMNA NABRI <[email redacted]> Wed, Feb 21, 2024 at 4:15 PM To: Todd Anderson <[email redacted]>

That’s fine we can keep March 14th no worries. Thanks so much! Sent from my iPhone

On Feb 21, 2024, at 1:04 PM, Todd Anderson <[email redacted]> wrote:

[Quoted text hidden]

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permmsgid=msg-f:[number redacted]&simpl=msg-f:[number redacted]… 1/1 DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Received Legal 05/09/2024

Client Contract Agreement

This agreement (“Contract”) is made and entered into on 9/21/23 by and between

Amna Nabri (“Owner”) and Bonum DC (“Contractor”). The Owner and Contractor agree

as follows:

The Contractor will perform and/or hire the sub-contractors to perform the required scope of

work outlined in the architectural drawings for the

Illinois St Residential ____________________________________________ (“Project”) that is located at 3941S.

Illinois Street Chandler, AZ. If architectural drawings are not available for this project, the

owner and owner representative understand that there is a higher risk for unforeseen

construction expenses that the contractor will not be responsible for financially. The

Contractor will assume the financial responsibility for all assigned Contractor furnished

equipment, finishes and fixtures that have been outlined in the related architectural

drawings and/or presented to the contractor by the owner to be listed out in the attached

estimate. If the contractor furnished equipment, finishes and fixtures are not listed out in the

attached estimate, the contractor will not be responsible for them.

Contractor shall perform the scope of work outlined in the documents attached to the satisfaction $40,000.00 of the Owner for the estimated price of $__________________. DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Received The Contractor shall immediately notify the Owner in writing of any potential Legal change orders 05/09/2024 that will alter the project work and expenses. Before performing the work required by the

change orders, the owner and contractor will document and sign a separate contract

agreement related to each individual change order. The Contractor and the Owner agree that

no change order or other form of order or directive will be considered valid unless it is

delivered in writing by Owner to Contractor.

Communication with the sub-contractors regarding the project schedule, construction

instructions and financial matters shall only take place between the contractor and the

contractor’s subcontractors. The owner agrees not to discuss the project schedule,

construction instructions and financial matters with the subcontractor. The contractors

subcontractors will be informed not to take direction regarding construction related matters

from the owner as this is what is best for the project. If the owner would like to make changes

to the project and/or offer construction instructions, the owner must talk directly with the

contractor. Furthermore, the contractor and subcontractors are to first abide by the city codes

and architectural drawings before considering direction from the owner; this is necessary to

protect the best interest of the owner, the project and all others involved.

This contract starts after the owner and the contractor both have signed this contract agreement

and after the initial required deposit from the owner has been made to the contractor and the funds

for that payment have been released into the contractor’s bank account. The contractor cannot

begin scheduling until the deposit has been made and cleared the contractor’s bank account. The

contract ends after the owner and the city inspectors and/or building owner approve and sign off DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Received on all work. The contractor will warranty all labor for one year. Any equipment furnishedLegal by the 05/09/2024 contractor shall come with the manufacturer’s warranty.

The contractor agrees to carry the required insurance at all times during this project.

This Contract is subject to and shall be interpreted under the law of the State of

Arizona.

The owner may terminate this agreement with written notice but the owner will still be responsible for paying

the contractor for all work performed by the contractor and the contractor’s subcontractors up to the final date

outlined in the owner’s notice to terminate the contract agreement. The contractor may stop work at anytime

and/or terminate the contract agreement at anytime with written notice if the owner is not paying the

contractor as outlined in this agreement the owner will still be responsible for paying the contractor for all work

performed by the contractor and the contractor’s subcontractors up to the final date outlined in the owner’s

notice to terminate the contract agreement. The contractor may also terminate the contract agreement if the

owner breaches this contract agreement.

The Contractor shall employ only competent and skilled workmen and foremen in the conduct

of work on this Contract. The Contractor shall at all times enforce strict discipline and good

order among Contractor’s employees.

All disputes will be handled accordingly and legally under the laws of the State of

Arizona. All invoices shall be sent to the Owner’s Project Manager identified in this

Contract. DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Owner will make payments for services on a monthly basis for services peReceived Legal rformed during the 05/09/2024 previous month in accordance with this Contract unless a project specific payment

contract agreement has been assigned to this project and attached to this contract

agreement. Materials will be payable on a reimbursable basis plus the agreed-to additional

fees for overhead, handling, and General and Administrative (G&A) costs.

If any terms, conditions or provisions of this Contract shall be held unconstitutional, illegal or

void, such finding shall not affect any other terms, conditions or provisions of this Contract.

Amna Nabri

9/21/2023

9/21/2023 DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Received Legal 05/09/2024

PAYMENT TERMS:

50% Deposit 25% payment after 50% of work is completed 25% upon completion

$5000 cash was paid to Bonum date of signing. The remaining $15,000 to be paid in the next 48 hours

SPECIAL PROJECT TERMS: Received Legal 05/09/2024

Consult Transfer Instructions You can use “Consult Transfer” to blind transfer a call, or conference in another party.

1. Select the ‘Consult Transfer’ icon

2. Next, enter the name of the person you are calling, or phone number or the Queue name, the hit ‘Enter’

3. Now you can either transfer the call, conference in both parties, or transfer the call a. Hitting the transfer button immediately will act as a ‘Blind Transfer’.

CONSULT TRANSFER | TW_08/11/2023 3/13/24, 4:35 PM State of Arizona Mail - Complaint #2024-01748 Received Legal 05/09/2024 Todd Anderson <[email redacted]>

Complaint #2024-01748 AMNA NABRI <[email redacted]> Wed, Mar 13, 2024 at 4:21 PM To: Todd Anderson <[email redacted]>

I will see you tomorrow at 9:00 am right?? Sent from my iPhone

On Feb 21, 2024, at 4:15 PM, AMNA NABRI <[email redacted]> wrote:

That’s fine we can keep March 14th no worries. [Quoted text hidden]

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permmsgid=msg-f:[number redacted]&simpl=msg-f:[number redacted]… 1/1 INVOICE Received Legal 05/09/2024 Development & Construction Gerald Turner [email redacted] / 480-227-4704 DATE: 12/10/2023 FOR:

Project: Illinois Street Location:

FINAL TOTAL PROJECT INVOICE

Subtotal $27,789 Overhead / Developer Fees $4,168

TOTAL: $31,958 ****IMPORTANT - PLEASE READ****

Upon Signing this agreement, you confirm that you understand all details of the process for this project including but not limited to the turnaround time frames for architects, engineers, city & health permits, payment schedule, project start date and anticipated deadlines that come with each project phase, all change orders are agreed upon by all parties (client, sub, GC) before initiating. We do not move, remove or relocate owner furnished equipment unless we are paid to do so and we are not responsible for any damages to owner furnished equipment during the moving process. ANY DEMO COST QUOTED POTENTIALLY COULD CHANGE AFTER WE OPEN UP THE WALLS AND/OR DEMO EXISTING FLOORING AS WE DO NOT KNOW THE CONDITION INSIDE THE WALLS OR THE CONDITIION OF THE FLOORING UNTIL AFTER WE START OR COMPLETE DEMO. We are not responsible for incorrectly ordered owner furnished equipment or materials. This estimate is based on the information provided in the most recent drawings. Communication is key throughout this project. Abiding by this contract is necessary in order to reduce stress, limit construction delays and keep all payments on time. BY ACCEPTING THIS PROPOSAL, YOU ARE APPROVING THE PRICING AND THE PAYMENT SCHEDULE. PAYMENT DELAYS CAN AFFECT THE DURATION. The cost of this estimate is good for 30 days.

Signature Date

DESCRIPTION AMOUNT

Supervision Discount -$2,000

Client Discount (This discount is taken directly from Bonum's profit of $4631 that Bonum was scheduled to profit) -$5,000 Received Legal 05/09/2024 Floor Demo $4,500

Tile Installation and Plumbing (Shower and Floor): Includes all Tile $10,906

Misc. Master Bathroom including framing, painting and shower glass - including hardware, lighting , hooks/rack $3,550

Flooring and Baseboards: Furnish and Install including furnish install of all door hardware $10,715

Powder Room: Drywall Repair, Install Toilets, Vanity, Lighting, Faucet, Hooks $1,505

All Electrical Work - Furnish Materials and Install Labor $632

Master Tub, Toilet, Vanity and Valve Shower Head $4,064

Supervision $2,000

Materials Credit: Tub,Tub filler, Vanity Hardware, Hooks/Racks, Ratan pendent lighting, mirror Labor Credit: Installation of showever valve, tub, tub filler, completion of tile install, install of pendent and vanity lighting, mirror -$3,082 and accessories and fabrication and installation of shower glass

Total GC Discount Offered: $7000 Total Credit/Refunds due to Contract Termination: $3082 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 INVOICE Received Legal 05/09/2024 Development & Construction Gerald Turner [email redacted] / 480-227-4704 DATE: 12/3/2023 FOR:

Project: Illinois Street Location:

FINAL TOTAL PROJECT INVOICE

Subtotal $30,871 Overhead / Developer Fees $4,631

TOTAL: $35,502 ****IMPORTANT - PLEASE READ****

Upon Signing this agreement, you confirm that you understand all details of the process for this project including but not limited to the turnaround time frames for architects, engineers, city & health permits, payment schedule, project start date and anticipated deadlines that come with each project phase, all change orders are agreed upon by all parties (client, sub, GC) before initiating. We do not move, remove or relocate owner furnished equipment unless we are paid to do so and we are not responsible for any damages to owner furnished equipment during the moving process. ANY DEMO COST QUOTED POTENTIALLY COULD CHANGE AFTER WE OPEN UP THE WALLS AND/OR DEMO EXISTING FLOORING AS WE DO NOT KNOW THE CONDITION INSIDE THE WALLS OR THE CONDITIION OF THE FLOORING UNTIL AFTER WE START OR COMPLETE DEMO. We are not responsible for incorrectly ordered owner furnished equipment or materials. This estimate is based on the information provided in the most recent drawings. Communication is key throughout this project. Abiding by this contract is necessary in order to reduce stress, limit construction delays and keep all payments on time. BY ACCEPTING THIS PROPOSAL, YOU ARE APPROVING THE PRICING AND THE PAYMENT SCHEDULE. PAYMENT DELAYS CAN AFFECT THE DURATION. The cost of this estimate is good for 30 days.

Signature Date

DESCRIPTION AMOUNT Received Legal Supervision $2,000 05/09/2024

Supervision Discount -$2,000

Floor Demo $4,500

Tile Installation and Plumbing (Shower and Floor): Includes all Tile $10,906

Misc. Master Bathroom including framing, painting and shower glass - including hardware, lighting , hooks/rack $3,550

Flooring and Baseboards: Furnish and Install including furnish install of all door hardware $10,715

Powder Room: Drywall Repair, Install Toilets, Vanity, Lighting, Faucet, Hooks $1,505

All Electrical Work - Furnish Materials and Install Labord $632

Master Tub, Toilet, Vanity and Valve Shower Head $4,064

Client Discount (This discount is taken directly from Bonum's profit of $4631 that Bonum was scheduled to profit) -$5,000

Total Client Discount: $7000 Received Legal 05/09/2024 Contractor/Supplier Scope of Work/Proudct Amount Location Horacio Demo $ 4,500.00 Downstairs Home Depot Plastic Sheeting $ 179.48 Downstairs Floor & Décor Flooring $ 3,116.46 Downstairs Floor & Décor Underlayment $ 566.99 Downstairs Emilio Installation Flooring $ 5,450.00 Downstairs Home Depot Baseboards $ 1,342.23 Downstairs Emilio Installation Baseboards $ 1,650.00 Downstairs Home Depot Door Hardware/Millwork $ 236.66 Downstairs Lowes Toilet $ 268.42 Powder Room Home Depot Vanity $ 279.20 Powder Room Lowes Vanity Lights, Towel Ring $ 142.99 Powder Room Lowes Mirror $ 96.99 Powder Room Martin Installation Door Hardware/Toilet $ 250.00 Powder Room Greg Installation Powder Rm Accessories/Vanity $ 479.93 Powder Room Floor & Décor Wall Tile $ 418.32 Master Bath Floor & Décor Shower Floor Tile $ 237.61 Master Bath Floor & Décor Bathroom Floor Tile $ 484.01 Master Bath Emilio Installation All Master Tile $ 9,850.00 Master Bath Lowes Shower Valve/Head $ 289.98 Master Bath Emilio Installation Showerhead $ (150.00) Refund Emilio Installation Tub and Filler $ (500.00) Refund Emilio Installation Tile Compl. $ (335.00) Refund Emilio Framing, Additional Demo in Wall, Drywall, Van $ 2,500.00 Master Bath Lowes Vanity $ 2,370.52 Master Bath Lowes Toilet $ 268.42 Master Bath Home Depot Misc. ABS Piping, Lumber, Copper, Silicon, etc. $ 149.01 Home Depot Electrical Materials: Outlets, boxes, Connectors $ 331.65 Bonum Electrical Labor $ 250.00 $ 34,723.87 Received Legal 05/09/2024 Contractor/Supplier Scope of Work/Proudct Amount Location Horacio Demo $ 4,500.00 Downstairs Home Depot Plastic Sheeting $ 179.48 Downstairs Floor & Décor Flooring $ 3,116.46 Downstairs Floor & Décor Underlayment $ 566.99 Downstairs Emilio Installation Flooring $ 5,450.00 Downstairs Home Depot Baseboards $ 1,342.23 Downstairs Emilio Installation Baseboards $ 1,650.00 Downstairs Home Depot Door Hardware/Millwork $ 236.66 Downstairs Lowes Toilet $ 268.42 Powder Room Home Depot Vanity $ 279.20 Powder Room Lowes Vanity Lights, Towel Ring $ 142.99 Powder Room Lowes Mirror $ 96.99 Powder Room Martin Installation Door Hardware/Toilet $ 250.00 Powder Room Greg Installation Powder Rm Accessories/Vanity $ 479.93 Powder Room Floor & Décor Wall Tile $ 418.32 Master Bath Floor & Décor Shower Floor Tile $ 237.61 Master Bath Floor & Décor Bathroom Floor Tile $ 484.01 Master Bath Emilio Installation All Master Tile $ 9,850.00 Master Bath Lowes Shower Valve/Head $ 289.98 Master Bath Emilio Installation Showerhead $ (150.00) Refund Emilio Installation Tub and Filler $ (500.00) Refund Emilio Installation Tile Compl. $ (335.00) Refund Emilio Framing, Additional Demo in Wall, Drywall, Van $ 2,500.00 Master Bath Lowes Vanity $ 2,370.52 Master Bath Lowes Toilet $ 268.42 Master Bath Home Depot Misc. ABS Piping, Lumber, Copper, Silicon, etc. $ 149.01 Home Depot Electrical Materials: Outlets, boxes, Connectors $ 331.65 Bonum Electrical Labor $ 250.00 Paypal Merchant CC Fee $ 275.91 Payment Initial Deposit Cash $ (15,000.00) Payment 2nd Payment Cash $ (5,000.00) Payment 3rd Payment Paypal CC $ (5,275.91) Payment 4th Payment Cash $ (5,000.00) $ 4,723.87 INVOICE Received Legal 05/09/2024 Development & Construction Gerald Turner [email redacted] / 480-227-4704 DATE: 12/3/2023 FOR:

Project: Illinois Street Location:

Subtotal $35,800 Overhead / Developer Fees $5,370

Deposit Required - Start work Friday Sept 29 TOTAL: $41,170 ****IMPORTANT - PLEASE READ****

Upon Signing this agreement, you confirm that you understand all details of the process for this project including but not limited to the turnaround time frames for architects, engineers, city & health permits, payment schedule, project start date and anticipated deadlines that come with each project phase, all change orders are agreed upon by all parties (client, sub, GC) before initiating. We do not move, remove or relocate owner furnished equipment unless we are paid to do so and we are not responsible for any damages to owner furnished equipment during the moving process. ANY DEMO COST QUOTED POTENTIALLY COULD CHANGE AFTER WE OPEN UP THE WALLS AND/OR DEMO EXISTING FLOORING AS WE DO NOT KNOW THE CONDITION INSIDE THE WALLS OR THE CONDITIION OF THE FLOORING UNTIL AFTER WE START OR COMPLETE DEMO. We are not responsible for incorrectly ordered owner furnished equipment or materials. This estimate is based on the information provided in the most recent drawings. Communication is key throughout this project. Abiding by this contract is necessary in order to reduce stress, limit construction delays and keep all payments on time. BY ACCEPTING THIS PROPOSAL, YOU ARE APPROVING THE PRICING AND THE PAYMENT SCHEDULE. PAYMENT DELAYS CAN AFFECT THE DURATION. The cost of this estimate is good for 30 days.

Signature Date

DESCRIPTION AMOUNT Received Legal Dumpster Rentals $1,300 05/09/2024

Dowstairs Flooring/Baseboards/Door Trim and Hardware - Includes furnish all materials, flooring trim and hardware - includes $13,550 demo and install Half Bath Remodel - Includes furnishing new vanity, toilet, sink, faucet, mirror and lighting, Includes installation of all equipment $1,900 and fixtures and includes demo of all existing equipment

Master Bath - Includes all demo. Includes the furnishing of a stand alone tub, toilet, vanity, sink, faucet, mirror lighting, shower $16,050 head and valvle, shower glass and all tile. Includes installation of all items

Project Manager/Supervisor ($1000 Week) $2,000

Allowance Fee for removing cabinets for flooring install. If we do not need to remove, you will not be charged this line item fee $1,000 3/14/24, 4:40 PM State of Arizona Mail - Document Received Legal 05/09/2024 Todd Anderson <[email redacted]>

Document messages

AMNA NABRI <[email redacted]> To: Todd Anderson <[email redacted]>

Hi Todd, It was a pleasure meeting you today, this is the termination document he sent me after I told him I want to terminate the contract between us on December 8th 2023, I asked him to revise it be Regards Amna

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted]… 1/5 3/14/24, 4:40 PM State of Arizona Mail - Document Received Legal 05/09/2024

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted]… 2/5 3/14/24, 4:40 PM State of Arizona Mail - Document Received Legal 05/09/2024

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted]… 3/5 3/14/24, 4:40 PM State of Arizona Mail - Document Received Legal 05/09/2024

Sent from my iPhone

Todd Anderson <[email redacted]> Thu, Mar 14, 2024 at 4:39 PM To: AMNA NABRI <[email redacted]>

Amna,

Thank you for the document. I will put it in the case file.

I did check on Bonum Develop[ent's license. It is active and in good standing at this point.

I should have my report out by the end of next week.

Todd Anderson Investigator #227

Arizona Registrar of Contractors Construction Investigations 1700 W Washington St., Ste 105 Phoenix, AZ 85007 Phone: (602) 771-6769

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted]… 4/5 3/14/24, 4:40 PM Email: [email redacted] State of Arizona Mail - Document Received Legal [Quoted text hidden] 05/09/2024

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted]… 5/5 Received Legal 05/09/2024 3/21/24, 4:50 PM State of Arizona Mail - Document Received Legal 05/09/2024 Todd Anderson <[email redacted]>

Document AMNA NABRI <[email redacted]> Wed, Mar 20, 2024 at 1:15 PM To: Todd Anderson <[email redacted]>

Hi Todd, I hope you’re doing good, I want to ask after you put your report how long do you give Bonum to start fixing and finish what they didn’t finish, and what if they didn’t respond? Like I mentioned before the email he sent titled meeting recap consider a confession to his handling my project unprofessionally! I really need to finish this project it’s been too long since we started! Regards Amna Sent from my iPhone

On Mar 14, 2024, at 8:19 PM, AMNA NABRI <[email redacted]> wrote:

Thanks [Quoted text hidden]

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permmsgid=msg-f:[number redacted]&simpl=msg-f:[number redacted]… 1/1 3/26/24, 11:25 AM State of Arizona Mail - Document Received Legal 05/09/2024 Todd Anderson <[email redacted]>

Document AMNA NABRI <[email redacted]> Fri, Mar 22, 2024 at 11:46 AM To: Todd Anderson <[email redacted]>

Hi Todd, Since we got the wrong mirror and light for the master bathroom, is it ok to take them back to exchange with the right one, I am just wondering if it’s going to late to do that if I wait until he comes back to do that, I don’t have any contact with them, I am waiting for your report and we can go from here. If I take them now I think I have to pay the difference, or you think I should wait, I hope Home Depot can exchange after all this time. Regards Amna Sent from my iPhone

On Mar 21, 2024, at 4:58 PM, Todd Anderson <[email redacted]> wrote:

[Quoted text hidden]

https://mail.google.com/mail/u/0/?ik=9cbed3e67d&view=pt&search=all&permmsgid=msg-f:[number redacted]&simpl=msg-f:[number redacted]… 1/1 DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Received Legal 05/09/2024

Client Contract Agreement

This agreement (“Contract”) is made and entered into on 9/21/23 by and between

Amna Nabri (“Owner”) and Bonum DC (“Contractor”). The Owner and Contractor agree

as follows:

The Contractor will perform and/or hire the sub-contractors to perform the required scope of

work outlined in the architectural drawings for the

Illinois St Residential ____________________________________________ (“Project”) that is located at 3941S.

Illinois Street Chandler, AZ. If architectural drawings are not available for this project, the The client was not charged for owner and owner representative understand that there is a higher risk for unforeseen these unforeseen construction expenses that the contractor will not be responsible for financially. The expenses.

Contractor will assume the financial responsibility for all assigned Contractor furnished

equipment, finishes and fixtures that have been outlined in the related architectural

drawings and/or presented to the contractor by the owner to be listed out in the attached The Client was not charged for estimate. If the contractor furnished equipment, finishes and fixtures are not listed out in the items such as paint, hooks etc not listed attached estimate, the contractor will not be responsible for them. on the estimate Contractor shall perform the scope of work outlined in the documents attached to the satisfaction $40,000.00 of the Owner for the estimated price of $__________________. DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Received The Contractor shall immediately notify the Owner in writing of any potential Legal change orders 05/09/2024 that will alter the project work and expenses. Before performing the work required by the

change orders, the owner and contractor will document and sign a separate contract

agreement related to each individual change order. The Contractor and the Owner agree that

no change order or other form of order or directive will be considered valid unless it is

delivered in writing by Owner to Contractor.

Communication with the sub-contractors regarding the project schedule, construction

instructions and financial matters shall only take place between the contractor and the

contractor’s subcontractors. The owner agrees not to discuss the project schedule,

construction instructions and financial matters with the subcontractor. The contractors

subcontractors will be informed not to take direction regarding construction related matters

from the owner as this is what is best for the project. If the owner would like to make changes

to the project and/or offer construction instructions, the owner must talk directly with the

contractor. Furthermore, the contractor and subcontractors are to first abide by the city codes

and architectural drawings before considering direction from the owner; this is necessary to

protect the best interest of the owner, the project and all others involved.

This contract starts after the owner and the contractor both have signed this contract agreement

and after the initial required deposit from the owner has been made to the contractor and the funds

for that payment have been released into the contractor’s bank account. The contractor cannot

begin scheduling until the deposit has been made and cleared the contractor’s bank account. The

contract ends after the owner and the city inspectors and/or building owner approve and sign off DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Received on all work. The contractor will warranty all labor for one year. Any equipment furnishedLegal by the 05/09/2024 contractor shall come with the manufacturer’s warranty.

The contractor agrees to carry the required insurance at all times during this project.

This Contract is subject to and shall be interpreted under the law of the State of

Arizona.

The owner may terminate this agreement with written notice but the owner will still be responsible for paying

the contractor for all work performed by the contractor and the contractor’s subcontractors up to the final date

outlined in the owner’s notice to terminate the contract agreement. The contractor may stop work at anytime

and/or terminate the contract agreement at anytime with written notice if the owner is not paying the

contractor as outlined in this agreement the owner will still be responsible for paying the contractor for all work

performed by the contractor and the contractor’s subcontractors up to the final date outlined in the owner’s

notice to terminate the contract agreement. The contractor may also terminate the contract agreement if the

owner breaches this contract agreement.

The Contractor shall employ only competent and skilled workmen and foremen in the conduct

of work on this Contract. The Contractor shall at all times enforce strict discipline and good

order among Contractor’s employees.

All disputes will be handled accordingly and legally under the laws of the State of

Arizona. All invoices shall be sent to the Owner’s Project Manager identified in this

Contract. DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Owner will make payments for services on a monthly basis for services peReceived Legal rformed during the 05/09/2024 previous month in accordance with this Contract unless a project specific payment

contract agreement has been assigned to this project and attached to this contract

agreement. Materials will be payable on a reimbursable basis plus the agreed-to additional

fees for overhead, handling, and General and Administrative (G&A) costs.

If any terms, conditions or provisions of this Contract shall be held unconstitutional, illegal or

void, such finding shall not affect any other terms, conditions or provisions of this Contract.

Amna Nabri

9/21/2023

9/21/2023 DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Received Legal 05/09/2024

PAYMENT TERMS:

50% Deposit 25% payment after 50% of work is completed 25% upon completion

$5000 cash was paid to Bonum date of signing. The remaining $15,000 to be paid in the next 48 hours

SPECIAL PROJECT TERMS: Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal Licensed Complaint Form 05/09/2024 Departmental Use Only For Current or Suspended Licensees

Person Filing Complaint Full Name (First Middle Last) Business Name (if a licensed contractor or supplier) ROC License Number(s) (if any)

Amna Nabri Mailing Address (Enter jobsite in Contract/Project section) City State Zip

3941 s Illinois st Chandler Arizona 85348 Phone Number Email

[number redacted] [email redacted] I consent to receive communications electronically in connection with this case Name of Attorney (if any)

Street Address of Attorney City State Zip

Phone Number of Attorney Email of Attorney

Contractor Information Name (as shown on contract/invoice) ROC License Number(s)

Bonum Development & Construction, LLC ROC 344755 Street Address City State Zip

1204 East Baseline Rd Tempe Arizona 85204 Phone Number Email

[number redacted] [email redacted] Name of Person(s) Representing License

Jen Spangler;Zack Engelking Contract/Project Information Contract Date Contract Amount Amount Paid

September 21, 2023 $40,000.00 $30,275.91 Date Work Started Date Work Stopped Date Work Was Completed

September 29, 2023 November 10, 2023 Close of Escrow (New Home) Move-In Date (New-Home)

Jobsite Street Address City State Zip

3941 S Illinois St Chandler AZ 85248 Name of Construction Site Owner Construction Site Name (if applicable)

Phone Number of Construction Site Owner Email of Construction Site Owner

This complaint is for Poor Work;Other I have contacted the contractor by Have you filed a complaint in court? No Has any work been corrected? No

RCC099 12/05/18 Page 1 of 2 Received Legal Licensed Complaint Form 05/09/2024 Departmental Use Only For Current or Suspended Licensees

The contract was Written All change orders were Both This project was Residential This project involved Remodel

A building permit was obtained by N/A List and briefly describe each complaint item (Please do not write "see attached" or use additional pages unless necessary to further describe issues or list more complaint items) (limited to 100 characters per line)

Contract was based on having project completed in two weeks, contractor failed to follow through schedule. Contractor pressured me to provided him more than 50% of the cost before starting the project. Contractor failed to order products in a timley manner, failed to respond with updates when requested. Financial statements changes Allegations Listed on Complaint:

Powder room vanity size is not the one I approved, light fixture position installed incorrectly and no paint

Master bathroom is not completed. no toilet, no tub/plumbing, no light fixtures, only part of the tile was installed

Damages to my stove when crew demoed downstairs , damaged front door and furniture

Crew did not cover my furniture when demo was conducted, furniture is very dusty

Downstairs flooring was changed to cheaper poor quality due to being under pressure to finish the project sooner.

Signature I declare under penalty of perjury that the information and documents contained on this Complaint Form, included with this complaint, or hereafter submitted in support of this complaint are true and accurate to the best of my knowledge. I will assist in the investigation or in the prosecution of the contractor or other parties, and will, if necessary, attend hearings and testify to facts. Printed Name Signature Date

Amna Nabri \complainant1\ \complainantd1\

RCC099 12/05/18 Page 2 of 2 Received Legal 05/09/2024

$5000 discount given early on in the project - Bonum only profited $370 for this project, contractually.

Savings for Amna - we did not charge to move furniture We did not charge extra for the plumbing for the tub. After opening up the walls, we determined that there were more changes needed to be made in order to plumb into the free standing tub faucet. ($550 savings and actual hard cost that Bonum's tile installer is literally paying for) Received Legal 05/09/2024

Savings: Client is receiving free chandelier and free electrical rewiring for all vanity lighting $1170 discount given which includes time and labor ($450 savings before Bonum started and actual hard cost that Bonum is literally the project - Bonum only paying for) is receiving $830 for project management

Savings: Client did not get charged for painting. Bonum to provide a touch up paint at first and a final painting when the project is completed ($750 savings and actual hard cost that Bonum is literally paying for)

Savings: Client did not get charged for purchasing and installing towel hooks and toilet paper hooks. ($350 savings and actual hard cost that Bonum is literally paying for)

Total literal hard cost savings: $2100 (Funds that come direct from Bonum's pocket

Total literal soft cost savings: $6170 (Funds that Bonum does not receive)

Total Contractural Costs that Bonum Receives: $1200 However, due to the amount of extra management time (calls, texts, site visits etc, Bonum loses money on this project) Received Legal 05/09/2024 Customer Service Information: www.bankofamerica.com 1.800.421.2110 Mail billing inquiries to: P.O. BOX 15284 Bank of America WILMINGTON, DE 19850 P.O. Box 672050 Dallas TX 75267-2050 Mail payment to: Bank of America P.O. Box 851001 Dallas TX 75285-1001

AMNA NABRI 3941 S ILLINOIS ST CHANDLER AZ 85248-4535

October 6 - November 5, 2023

Account Summary/Payment Information New Balance Total $5,275.91 Current Payment Due $52.00 Previous Balance $0.00 Total Minimum Payment Due $52.00 Payments and Other Credits $0.00 Payment Due Date 12/02/2023 Purchases and Adjustments $5,275.91

Fees Charged $0.00 Interest Charged $0.00

New Balance Total Late Payment Warning: If we do not receive your Total Minimum $5,275.91 Payment by the date listed above, you may have to pay a late fee of up to Total Credit Line $14,000.00 $40.00 and your APRs may be increased up to the Penalty APR of 29.99%. Total Credit Available $8,724.09 Total Minimum Payment Warning: If you make only the Total Minimum Cash Credit Line $2,800.00 Payment each period, you will pay more in interest and it will take you Portion of Credit Available longer to pay off your balance. For example: for Cash $2,800.00 If you make no additional You will payoff the And you will end up Statement Closing Date 11/05/2023 charges using this card balance shown on this paying an estimated Days in Billing Cycle 31 and each month you pay statement in about total of

Only the Total 16 years $11,025.00 Minimum Payment

$174.00 36 months $6,264.00 (Savings = $4,761.00)

If you would like information about credit counseling services, call 866.300.5238.

[number redacted]

BANK OF AMERICA Account Number: P.O. BOX 851001 DALLAS TX 75285-1001 Payment Due Date 12/02/2023 New Balance Total $5,275.91 Total Minimum Payment Due $52.00

AMNA NABRI Enter payment amount $ 3941 S ILLINOIS ST .

CHANDLER AZ 85248-4535 For change of address/phone number, see reverse side. Make your payment online at www.bankofamerica.com or Mail this coupon along with your check payable to: Bank of America

A524022250A 19620668672065C Received Legal AMNA NABRI ! Account #5 ! October 6 - November 5, 2023 05/09/2024 004 - 000 - 000 - G

IMPORTANT INFORMATION ABOUT THIS ACCOUNT

PAYING INTEREST - We will not charge interest on Purchases on the next CALCULATION OF BALANCES SUBJECT TO INTEREST RATE statement if you pay the New Balance Total in full by the Payment Due Date, Average Daily Balance Method (including new Purchases): We calculate and you had paid in full by the previous Payment Due Date. We will begin separate Balances Subject to an Interest Rate for Purchases and for each charging interest on Balance Transfers and Cash Advances on the transaction Introductory or Promotional Offer balance consisting of Purchases. We do this date. by: (1) calculating a daily balance for each day in the billing cycle; (2) adding all TOTAL INTEREST CHARGE COMPUTATION - Interest Charges accrue and the daily balances together; and (3) dividing the sum of the daily balances by are compounded on a daily basis. To determine the Interest Charges, we the number of days in the billing cycle. multiply each Balance Subject to Interest Rate by its applicable Daily Periodic To calculate the daily balance for each day in this statement's billing cycle, we: Rate and that result is multiplied by the number of days in the billing cycle. To (1) take the beginning balance; (2) add an amount equal to the applicable Daily determine the total Interest Charge for the billing cycle, we add the Periodic Periodic Rate multiplied by the previous day's daily balance; (3) add new Rate Interest Charges together. A Daily Periodic Rate is calculated by dividing Purchases, new Account Fees, and new Transaction Fees; and (4) subtract an Annual Percentage Rate by 365. applicable payments and credits. If any daily balance is less than zero we treat HOW WE ALLOCATE YOUR PAYMENTS - Payments are allocated to it as zero. posted balances. If your account has balances with different APRs, we will Average Balance Method (including new Balance Transfers and new Cash allocate the amount of your payment equal to the Total Minimum Payment Due Advances): We calculate separate Balances Subject to an Interest Rate for to the lowest APR balances first (including transactions made after this Balance Transfers, Cash Advances, and for each Introductory or Promotional statement). Payment amounts in excess of your Total Minimum Payment Due Offer balance consisting of Balance Transfers or Cash Advances. We do this by: will be applied to balances with higher APRs before balances with lower APRs. (1) calculating a daily balance for each day in this statement's billing cycle; (2) IMPORTANT INFORMATION ABOUT PAYMENTS BY PHONE - When calculating a daily balance for each day prior to this statement's billing cycle using the optional Pay-by-Phone service, you authorize us to initiate an that had a "Pre-Cycle balance" - a Pre-Cycle balance is a Balance Transfer or a electronic payment from your account at the financial institution you designate. Cash Advance with a transaction date prior to this statement's billing cycle but You must authorize the amount and timing of each payment. For your with a posting date within this statement's billing cycle; (3) adding all the daily protection, we will ask for security information. To cancel, call us before the balances together; and (4) dividing the sum of the daily balances by the number scheduled payment date. Same-day payments cannot be edited or canceled. of days in this statement's billing cycle. YOUR CREDIT LINES - The Total Credit Line is the amount of credit To calculate the daily balance for each day in this statement's billing cycle, we: available for the account; however, only a portion of that is available for Bank (1) take the beginning balance; (2) add an amount equal to the applicable Daily Cash Advances. The Cash Credit Line is that amount you have available for Periodic Rate multiplied by the previous day's daily balance; (3) add new Bank Cash Advances. Generally, Bank Cash Advances consist of ATM Cash Balance Transfers, new Cash Advances and Transaction Fees; and (4) subtract Advances, Over the Counter (OTC) Cash Advances, Same-Day Online Cash applicable payments and credits. If any daily balance is less than zero we treat Advances, Overdraft Protection Cash Advances, Cash Equivalents, and it as zero. applicable transaction fees. To calculate a daily balance for each day prior to this statement's billing cycle MISCELLANEOUS - Promotional Rate End Date: This date is based on a that had a Pre-Cycle balance: (1) we take the beginning balance attributable future statement closing date. If you change your payment due date, this date solely to Pre-Cycle balance (which will be zero on the transaction date of the could change. The New Balance Total which appears on this statement is not a first Pre-Cycle balance); (2) add an amount equal to the applicable Daily payoff amount and may be subject to additional interest charges when you pay Periodic Rate multiplied by the previous day's daily balance; (3) and add only in full after your statement closing date. Virtual cards are the digital form of the applicable Pre-Cycle balances and their related Transaction Fees. We your eligible physical credit cards stored within a digital wallet. exclude from this calculation all transactions posted in previous billing cycles.

© 2023 Bank of America Corporation For the complete terms and conditions of your account, consult your Credit Card Agreement. This account is issued and administered by Bank of America. Bank of America is a registered trademark of Bank of America Corporation.

PAYMENTS - We credit mailed payments as of the date received, if the payment is: (1) received by 5 p.m. local time at the address shown on the remittance portion of your monthly statement; (2) paid with a check drawn in U.S. dollars on a U.S. financial institution or a U.S. dollar money order; and (3) sent in the return envelope with only the remittance portion of your statement accompanying it. Payments received by mail after 5 p.m. local time at the remittance address on any day including the Payment Due Date, but that otherwise meet the above requirements, will be credited as of the next day. Payments made online or by phone will be credited as of the date of receipt if made by 5 p.m. Central. Credit for any other payments may be delayed up to five days. Cash payments made with our tellers will only be accepted with a valid identification (ID). No payment shall operate as an accord and satisfaction without the prior written approval of one of our Senior Officers. We process most payment checks electronically by using the information found on your check. Each check authorizes us to create a one-time electronic funds transfer (or process it as a check or paper draft). Funds may be withdrawn from your account as soon as the same day we receive your payment. Checks are not returned to you. If you have authorized us to pay your credit card bill automatically from your savings or checking account with us, you can stop the payment on any amount you think is wrong. To stop payment, your letter must reach us at least three business days before the automatic payment is scheduled to occur.

Change of Address/Phone number: Online at www.bankofamerica.com

Please do not add any written communication in this space.

AB Received Legal AMNA NABRI ! Account ! October 6 - November 5, 2023 05/09/2024

Transactions Transaction Posting Reference Account Date Date Description Number Number Amount Total

Purchases and Adjustments 10/06 10/09 PAYPAL *BONUM [number redacted] AZ 3715 2065 5,275.91 TOTAL PURCHASES AND ADJUSTMENTS FOR THIS PERIOD $5,275.91

Interest Charged 11/05 11/05 INTEREST CHARGED ON PURCHASES 0.00 11/05 11/05 INTEREST CHARGED ON BALANCE TRANSFERS 0.00 11/05 11/05 INTEREST CHARGED ON DIR DEP&CHK CASHADV 0.00 11/05 11/05 INTEREST CHARGED ON BANK CASH ADVANCES 0.00 TOTAL INTEREST CHARGED FOR THIS PERIOD $0.00

2023 Totals Year-to-Date

Total fees charged in 2023 $0.00

Total interest charged in 2023 $0.00

Interest Charge Calculation Your Annual Percentage Rate (APR) is the annual interest rate on your account.

Type of Annual Promotional Promotional Promotional Balance Interest Balance Percentage Transaction Offer ID Rate End Subject to Charges by Rate Type Date Interest Transaction Rate Type

Purchases 18.24% V $ 0.00 $ 0.00 Promotional APR 0.00% PUR, WT LM23-60777 12/05/2024 $ 0.00 $ 0.00 Balance Transfers 18.24% V $ 0.00 $ 0.00 Direct Deposit and Check Cash 21.24% V $ 0.00 $ 0.00 Advances Bank Cash Advances 29.24% V $ 0.00 $ 0.00

APR Type Definitions Promotional Transaction Types: PUR = Purchase, WT = Non-Bank Wire Transfer; Daily Interest Rate Type: V= Variable Rate (rate may vary); APR Type: Promotional APR (APR for limited time on eligible transactions)

Received Legal AMNA NABRI ! Account ! October 6 - November 5, 2023 05/09/2024

Important Messages You can request a copy of this statement in either Braille or Large Print by calling 800.432.1000 or going to bankofamerica.com and enter Visually Impaired Access from the home page.

Your Reward Summary 52.76 Base Cash Back Earned

50.00 Category Bonus Earned Make the most of your 25.69 Relationship Bonus Earned rewards program today! 200.00 Other Bonus Earned

328.45 Total Cash Back Available

INVOICE Received Legal 05/09/2024 Development & Construction Gerald Turner [email redacted] / 480-227-4704 DATE: 12/3/2023 FOR:

Project: Illinois Street Location:

FINAL TOTAL PROJECT INVOICE

Subtotal $30,871 Overhead / Developer Fees $4,631

TOTAL: $35,502 ****IMPORTANT - PLEASE READ****

Upon Signing this agreement, you confirm that you understand all details of the process for this project including but not limited to the turnaround time frames for architects, engineers, city & health permits, payment schedule, project start date and anticipated deadlines that come with each project phase, all change orders are agreed upon by all parties (client, sub, GC) before initiating. We do not move, remove or relocate owner furnished equipment unless we are paid to do so and we are not responsible for any damages to owner furnished equipment during the moving process. ANY DEMO COST QUOTED POTENTIALLY COULD CHANGE AFTER WE OPEN UP THE WALLS AND/OR DEMO EXISTING FLOORING AS WE DO NOT KNOW THE CONDITION INSIDE THE WALLS OR THE CONDITIION OF THE FLOORING UNTIL AFTER WE START OR COMPLETE DEMO. We are not responsible for incorrectly ordered owner furnished equipment or materials. This estimate is based on the information provided in the most recent drawings. Communication is key throughout this project. Abiding by this contract is necessary in order to reduce stress, limit construction delays and keep all payments on time. BY ACCEPTING THIS PROPOSAL, YOU ARE APPROVING THE PRICING AND THE PAYMENT SCHEDULE. PAYMENT DELAYS CAN AFFECT THE DURATION. The cost of this estimate is good for 30 days.

Signature Date

DESCRIPTION AMOUNT Received Legal Supervision $2,000 05/09/2024

Supervision Discount -$2,000

Floor Demo $4,500

Tile Installation and Plumbing (Shower and Floor): Includes all Tile $10,906

Misc. Master Bathroom including framing, painting and shower glass - including hardware, lighting , hooks/rack $3,550

Flooring and Baseboards: Furnish and Install including furnish install of all door hardware $10,715

Powder Room: Drywall Repair, Install Toilets, Vanity, Lighting, Faucet, Hooks $1,505

All Electrical Work - Furnish Materials and Install Labord $632

Master Tub, Toilet, Vanity and Valve Shower Head $4,064

Client Discount (This discount is taken directly from Bonum's profit of $4631 that Bonum was scheduled to profit) -$5,000

Total Client Discount: $7000 Received Legal 05/09/2024 Contractor/Supplier Scope of Work/Proudct Amount Location Horacio Demo $ 4,500.00 Downstairs Home Depot Plastic Sheeting $ 179.48 Downstairs Floor & Décor Flooring $ 3,116.46 Downstairs Floor & Décor Underlayment $ 566.99 Downstairs Emilio Installation Flooring $ 5,450.00 Downstairs Home Depot Baseboards $ 1,342.23 Downstairs Emilio Installation Baseboards $ 1,650.00 Downstairs Home Depot Door Hardware/Millwork $ 236.66 Downstairs Lowes Toilet $ 268.42 Powder Room Home Depot Vanity $ 279.20 Powder Room Lowes Vanity Lights, Towel Ring $ 142.99 Powder Room Lowes Mirror $ 96.99 Powder Room Martin Installation Door Hardware/Toilet $ 250.00 Powder Room Greg Installation Powder Rm Accessories/Vanity $ 479.93 Powder Room Floor & Décor Wall Tile $ 418.32 Master Bath Floor & Décor Shower Floor Tile $ 237.61 Master Bath Floor & Décor Bathroom Floor Tile $ 484.01 Master Bath Emilio Installation All Master Tile $ 9,850.00 Master Bath Lowes Shower Valve/Head $ 289.98 Master Bath Emilio Installation Showerhead $ (150.00) Refund Emilio Installation Tub and Filler $ (500.00) Refund Emilio Installation Tile Compl. $ (335.00) Refund Emilio Framing, Additional Demo in Wall, Drywall, Van $ 2,500.00 Master Bath Lowes Vanity $ 2,370.52 Master Bath Lowes Toilet $ 268.42 Master Bath Home Depot Misc. ABS Piping, Lumber, Copper, Silicon, etc. $ 149.01 Home Depot Electrical Materials: Outlets, boxes, Connectors $ 331.65 Bonum Electrical Labor $ 250.00 Paypal Merchant CC Fee $ 275.91 Payment Initial Deposit Cash $ (15,000.00) Payment 2nd Payment Cash $ (5,000.00) Payment 3rd Payment Paypal CC $ (5,275.91) Payment 4th Payment Cash $ (5,000.00) $ 4,723.87 Received Legal 05/09/2024 Contractor/Supplier Scope of Work/Proudct Amount Location Horacio Demo $ 4,500.00 Downstairs Home Depot Plastic Sheeting $ 179.48 Downstairs Floor & Décor Flooring $ 3,116.46 Downstairs Floor & Décor Underlayment $ 566.99 Downstairs Emilio Installation Flooring $ 5,450.00 Downstairs Home Depot Baseboards $ 1,342.23 Downstairs Emilio Installation Baseboards $ 1,650.00 Downstairs Home Depot Door Hardware/Millwork $ 236.66 Downstairs Lowes Toilet $ 268.42 Powder Room Home Depot Vanity $ 279.20 Powder Room Lowes Vanity Lights, Towel Ring $ 142.99 Powder Room Lowes Mirror $ 96.99 Powder Room Martin Installation Door Hardware/Toilet $ 250.00 Powder Room Greg Installation Powder Rm Accessories/Vanity $ 479.93 Powder Room Floor & Décor Wall Tile $ 418.32 Master Bath Floor & Décor Shower Floor Tile $ 237.61 Master Bath Floor & Décor Bathroom Floor Tile $ 484.01 Master Bath Emilio Installation All Master Tile $ 9,850.00 Master Bath Lowes Shower Valve/Head $ 289.98 Master Bath Emilio Installation Showerhead $ (150.00) Refund Emilio Installation Tub and Filler $ (500.00) Refund Emilio Installation Tile Compl. $ (335.00) Refund Emilio Framing, Additional Demo in Wall, Drywall, Van $ 2,500.00 Master Bath Lowes Vanity $ 2,370.52 Master Bath Lowes Toilet $ 268.42 Master Bath Home Depot Misc. ABS Piping, Lumber, Copper, Silicon, etc. $ 149.01 Home Depot Electrical Materials: Outlets, boxes, Connectors $ 331.65 Bonum Electrical Labor $ 250.00 $ 34,723.87 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Received Legal 05/09/2024

Client Contract Agreement

This agreement (“Contract”) is made and entered into on 9/21/23 by and between

Amna Nabri (“Owner”) and Bonum DC (“Contractor”). The Owner and Contractor agree

as follows:

The Contractor will perform and/or hire the sub-contractors to perform the required scope of

work outlined in the architectural drawings for the

Illinois St Residential ____________________________________________ (“Project”) that is located at 3941S.

Illinois Street Chandler, AZ. If architectural drawings are not available for this project, the

owner and owner representative understand that there is a higher risk for unforeseen

construction expenses that the contractor will not be responsible for financially. The

Contractor will assume the financial responsibility for all assigned Contractor furnished

equipment, finishes and fixtures that have been outlined in the related architectural

drawings and/or presented to the contractor by the owner to be listed out in the attached

estimate. If the contractor furnished equipment, finishes and fixtures are not listed out in the

attached estimate, the contractor will not be responsible for them.

Contractor shall perform the scope of work outlined in the documents attached to the satisfaction $40,000.00 of the Owner for the estimated price of $__________________. DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Received The Contractor shall immediately notify the Owner in writing of any potential Legal change orders 05/09/2024 that will alter the project work and expenses. Before performing the work required by the

change orders, the owner and contractor will document and sign a separate contract

agreement related to each individual change order. The Contractor and the Owner agree that

no change order or other form of order or directive will be considered valid unless it is

delivered in writing by Owner to Contractor.

Communication with the sub-contractors regarding the project schedule, construction

instructions and financial matters shall only take place between the contractor and the

contractor’s subcontractors. The owner agrees not to discuss the project schedule,

construction instructions and financial matters with the subcontractor. The contractors

subcontractors will be informed not to take direction regarding construction related matters

from the owner as this is what is best for the project. If the owner would like to make changes

to the project and/or offer construction instructions, the owner must talk directly with the

contractor. Furthermore, the contractor and subcontractors are to first abide by the city codes

and architectural drawings before considering direction from the owner; this is necessary to

protect the best interest of the owner, the project and all others involved.

This contract starts after the owner and the contractor both have signed this contract agreement

and after the initial required deposit from the owner has been made to the contractor and the funds

for that payment have been released into the contractor’s bank account. The contractor cannot

begin scheduling until the deposit has been made and cleared the contractor’s bank account. The

contract ends after the owner and the city inspectors and/or building owner approve and sign off DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Received on all work. The contractor will warranty all labor for one year. Any equipment furnishedLegal by the 05/09/2024 contractor shall come with the manufacturer’s warranty.

The contractor agrees to carry the required insurance at all times during this project.

This Contract is subject to and shall be interpreted under the law of the State of

Arizona.

The owner may terminate this agreement with written notice but the owner will still be responsible for paying

the contractor for all work performed by the contractor and the contractor’s subcontractors up to the final date

outlined in the owner’s notice to terminate the contract agreement. The contractor may stop work at anytime

and/or terminate the contract agreement at anytime with written notice if the owner is not paying the

contractor as outlined in this agreement the owner will still be responsible for paying the contractor for all work

performed by the contractor and the contractor’s subcontractors up to the final date outlined in the owner’s

notice to terminate the contract agreement. The contractor may also terminate the contract agreement if the

owner breaches this contract agreement.

The Contractor shall employ only competent and skilled workmen and foremen in the conduct

of work on this Contract. The Contractor shall at all times enforce strict discipline and good

order among Contractor’s employees.

All disputes will be handled accordingly and legally under the laws of the State of

Arizona. All invoices shall be sent to the Owner’s Project Manager identified in this

Contract. DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Owner will make payments for services on a monthly basis for services peReceived Legal rformed during the 05/09/2024 previous month in accordance with this Contract unless a project specific payment

contract agreement has been assigned to this project and attached to this contract

agreement. Materials will be payable on a reimbursable basis plus the agreed-to additional

fees for overhead, handling, and General and Administrative (G&A) costs.

If any terms, conditions or provisions of this Contract shall be held unconstitutional, illegal or

void, such finding shall not affect any other terms, conditions or provisions of this Contract.

Amna Nabri

9/21/2023

9/21/2023 DocuSign Envelope ID: 57D97B83-C50E-4B31-BEED-02834D598F44 Received Legal 05/09/2024

PAYMENT TERMS:

50% Deposit 25% payment after 50% of work is completed 25% upon completion

$5000 cash was paid to Bonum date of signing. The remaining $15,000 to be paid in the next 48 hours

SPECIAL PROJECT TERMS: Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024

Illinois St Timeline

Sept. 21 8am - Estimate was issued for $41,170

Sept 21 4:30pm - Gerald offered Amna a discount of $1170 after Amna explained that she was hoping to get the project completed at the lowest cost possible. A contract totalling $40,000 was signed

Sept 29 - Demo Started

Oct 5 - 7:16pm Gerald sent over Powder Room and Master Bath Design options to choose from

Oct 6 - Jen and Gerald, while onsite, were told to hold off on the original bath tub option. Amna said she wanted to see other options.

October 8th - received text about the dust from Demo.

October 9th - in the morning, Gerald literally pleaded with Amna to allow Bonum to clean the entire house right away but Bonum was not allowed to do so. And both agreed that it would be cleaned after construction. Only for Amna to later complain that the house was still dirty. Gerald, from his experience, saw where this project was going and offered Amna an additional $5000 discount which comes from Bonum’s profits. Keep in mind, Amna was already offered an $1170 initial discount and now an additional $5000. One can easily do the math to see that Bonum is no longer making any money on the project.

Oct 9 2:21pm - Gerald provided options for the tub

Oct 9 2:28pm - Amna decided to stay with original order and asked us to move forward with the original tub

Oct 13 - Amna told Zach to cancel the original powder room vanity and order the alternate because the original had not arrived yet. Zach presented Amna with three alternates. Amna chose one. We installed it on October 21st but Amna was not happy with her choice in the vanity that she chose. Come to find out from Jen, Amana told Jen that everyone likes the vanity but Amna, herself.

Oct 21 - Zach informed Amna that due to late and delayed deliveries for the vanity, tub and tub faucet, we are rescheduling to complete the project November 9-11 as Amna will be home from work for the federal holiday and it allows more time for deliveries. Received Legal 05/09/2024

Bonum met Todd (ROC Inspector) onsite - Bonum sent a group text message to the inspector with all documentation that clearly provides some background on the entire situation not just what the Client told the ROC. Bonum never received a response to this text message. Why would the inspector give Bonum his cell phone number if he was not going to respond. Received Legal 05/09/2024

Bonum met Todd (ROC Inspector) onsite - Bonum sent a group text message to the inspector with all documentation that clearly provides some background on the entire situation not just what the Client told the ROC. Bonum never received a response to this text message. Why would the inspector give Bonum his cell phone number if he was not going to respond. Received Legal 05/09/2024

Bonum met Todd (ROC Inspector) onsite - Bonum sent a group text message to the inspector with all documentation that clearly provides some background on the entire situation not just what the Client told the ROC. Bonum never received a response to this text message. Why would the inspector give Bonum his cell phone number if he was not going to respond. Received Legal 05/09/2024

Bonum met Todd (ROC Inspector) onsite - Bonum sent a group text message to the inspector with all documentation that clearly provides some background on the entire situation not just what the Client told the ROC. Bonum never received a response to this text message. Why would the inspector give Bonum his cell phone number if he was not going to respond. Received Legal 05/09/2024

This text message is from the Owner of Bonum reaching out to the inspector pleading for an answer to the question "How is Bonum suppose to finish the project without knowing whether or not the client is going to pay the balance"? Again, Bonum never received a response.

How can the ROC find contractors guilty when they don't respond but it is ok if the ROC does not respond?

Why give us the cell phone number if we are not going to get a response? Received Legal 05/09/2024

The Client Received Legal 05/09/2024

Bonum

The Client stating that she is DONE with Bonum simply because she was not standing beside us when we made the purchases even though afterwards, Bonum walked the client back up to the cashier to confirm that everything was purchased correctly.

How can Bonum be held responsible simply because the client was not standing beside us when we placed the order?

It is also important to add that the materials that were purchased for the client that day were purchased for her out of the kindness of our hearts at no cost to the client Received Legal 05/09/2024

She is asking for money back from Bonum when the client owes Bonum money and even when we have purchased and paid for over $1000 worth of materials and fixtures at no cost to the client out of the kindness of our hearts Received Legal 05/09/2024

Bonum Received Legal 05/09/2024 Received Legal 05/09/2024

Bonum providing all order numbers to the client so the client can track the order and verify that Bonum ordered everything correctly even though the cashier already confirmed it. Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Received Legal 05/09/2024 Mediation Notice

Mediation Services Mediation services are available to the parties. What is Mediation? Mediation is a method of resolving disputes where the parties can end conflict without the expense and time associated with the full administrative process. Who Participates in During mediation, a mediator will attempt to help the Mediation? parties find an optimal solution to the conflict. Both parties must agree to participate in mediation, and both parties must bring a representative to mediation that has full authority to settle the entire matter. Mediation Is Not Neither the Registrar nor the Office of Administrative Mandatory Hearings will penalize a party for not agreeing to mediation. Where do the Parties The parties will meet at the Office of Administrative Meet for Mediation? Hearings to participate in mediation.

The Office of Administrative Hearings is located at 1400 West Washington, Suite 101, Phoenix, Arizona 85007. When does Mediation can occur after the Registrar issues a citation, but Mediation Occur? before the administrative hearing. Why Should Parties Mediation can be an alternative to the full administrative Consider Mediation? process. Mediation is beneficial because it is (1) time- efficient, (2) cost-effective, (3) confidential, and (4) capable of providing flexible solutions to complex problems. How to Request If the parties wish to mediate this case, they must file a Joint Mediation Request for Mediation with the Office of Administrative Hearings. A Joint Request for Mediation is included with this Mediation Notice. REGISTRAR OF CONTRACTORS OF THE STATE OF ARIZONA _________________________ Case No. _______________ COMPLAINANT,

v. JOINT REQUEST FOR MEDIATION _________________________ RESPONDENT.

REQUEST

The parties jointly request that this matter be referred to mediation in the Office of Administrative Hearings (OAH). ☐ This matter is set for hearing on __________________(date). ☐ This matter is not currently set for hearing. MEDIATION AGREEMENT By requesting this mediation and signing below, the parties understand, represent, and agree: 1. The parties are prepared to commence mediation and will be ready for mediation on _____________________(date); 2. The parties will participate in the mediation process in good faith; 3. This request for mediation is not intended to hinder or delay administrative proceedings; 4. No party will contend that the mediation limits the power of OAH and its administrative law judges to conduct an administrative hearing and issue decisions under A.R.S. §§ 41-1092 – 1092.12; 5. The parties will be courteous and respectful throughout the mediation process to all participants; 6. The mediation is completely voluntary and the principal purpose is to allow the parties a full and fair opportunity to discuss settlement; of 3 REGISTRAR OF CONTRACTORS 1700 W. Washington St. Suite 105 – PHOENIX, AZ 85007-2812 Telephone (602)542-1525 1-877-692-9762 7. The mediator may conduct joint and separate meetings with the parties and may suggest resolutions to the parties’ dispute, but the mediator has no authority to impose a settlement upon the parties; 8. The mediation process is confidential. Communications made, material created for or used during, and acts occurring during mediation are confidential and may not be discovered or admitted into evidence in any proceeding except as provided by A.R.S. § 12-2238; 9. The mediator is not subject to service of process or a subpoena to produce evidence or to testify regarding any evidence or occurrence relating to the mediation except as provided in A.R.S. § 12-2238(C); 10. Neither the mediator, nor the Registrar of Contractors, nor the Office of Administrative Hearings is subject to civil liability for any act or omission in connection with any mediation service or activity except for acts involving

intentional misconduct or reckless disregard of a substantial risk of injury to the rights of others; 11. Throughout the mediation process, each party must have a representative present who will have full settlement authority to settle all claims at issue in the administrative

proceeding. 12. The mediation process will terminate when: a. The parties reach settlement; b. The mediator determines that further efforts at mediation are no longer likely

to achieve a settlement; or c. One of the parties withdraws from mediation. _____________________________________ _______________________ Complainant (or representative) Date

_____________________________________ _______________________ Respondent (or representative) Date

of 3 REGISTRAR OF CONTRACTORS 1700 W. Washington St. Suite 105 – PHOENIX, AZ 85007-2812 Telephone (602)542-1525 1-877-692-9762 PREHEARING DISCLOSURE STATEMENT INSTRUCTIONS ***DO NOT SUBMIT THESE INSTRUCTIONS WITH THE PREHEARING DISCLOSURE FORM***

ADMINISTRATIVE RULES A copy of the Arizona Administrative Code’s Rules for the Registrar of Contractors can be located on the Registrar’s Website.

PREHEARING DISCLOSURE REQUIREMENT Under A.A.C. R4-9-118(A), before a hearing, the parties must prepare a disclosure statement. The disclosure statement must contain: • A list of all the witnesses the party will call to testify, including the witnesses’ contact information and a brief description of the subject matter of the witnesses’ expected testimony; and • A list of all the exhibits that the party will use at the hearing.

FILE PREHEARING DISCLOSURE STATEMENTS • The Prehearing Disclosure Statements and Exhibits may be submitted to the Arizona Office of Administrative Hearings using any of the following: • Electronically: https://portal.azoah.com/submission/ • In-Person or by Mail: 1740 West Adams Street, Lower Level, Phoenix, Arizona 85007

EXCHANGING DISCLOSURE STATEMENTS AND EXHIBITS Under A.A.C. R4-9-118(B) (effective November 5, 2017), a party to the hearing must serve on every other party and file with the Office of Administrative Hearings a copy of: • The disclosure statement; and, • Any exhibit that the party will use at the hearing. Service: The disclosure statement and exhibits must be served on all parties in accordance with Arizona Administrative Code R2-19-108 Filing Documents. Under A.A.C. R2-19-108, service is completed by: • Personal delivery; • 1st class, certified or express mail; or • Facsimile. Timing: The disclosure statement and the exhibits must be served and filed not less than seven calendar days before the date of the hearing. Under A.A.C. R2-19-108, a document is served on a party: • On the date it is personally served; • Five days after it is mailed by express or 1st class mail; • On the date of the return receipt if it is mailed by certified mail; or • On the date indicated on the facsimile transmission.

CONSEQUENCES FOR FAILING TO DISCLOSE Under A.A.C. R4-9-108(C), if a witness or an exhibit is not timely disclosed as required the rules, and good cause for the failure to disclose is not shown, then the administrative law judge may: • Order that certain witnesses or exhibits not be used at the hearing; • Order that a particular fact is or is not established for the record; or, • Order that a charge, a defense, a claim, or some portion thereof, be dismissed.

Form RC-L-800A Prehearing Disclosure Statement Rev. 10/08/2019 Instructions Form PREHEARING DISCLOSURE STATEMENT FORM RC-L-800A

PART 1: WITNESS LIST DOCKET NO. Under A.A.C. R4-9-118(A), before a hearing, a party must prepare a disclosure statement containing a list of all the witnesses the party will call to testify, including the witnesses’ contact information and a brief description of the subject matter of the witnesses’ expected testimony. If you need additional space to list all witnesses, complete and attach additional Witness Lists. Example 1. Name 2. Telephone Number 3. Email Address

John Doe (123) 456-7890 [email redacted] 4. Subject Matter of Expected Testimony

John Doe will testify regarding the poor workmanship and poor installation of the Garage Door. Mr. Doe will also testify regarding the invoices and change orders for the project.

Witness 1. Name 2. Telephone Number 3. Email Address

4. Subject Matter of Expected Testimony

Witness 1. Name 2. Telephone Number 3. Email Address

4. Subject Matter of Expected Testimony

Witness 1. Name 2. Telephone Number 3. Email Address

4. Subject Matter of Expected Testimony

Witness 1. Name 2. Telephone Number 3. Email Address

4. Subject Matter of Expected Testimony

Form RC-L-800A Prehearing Disclosure Statement Rev. 1/15/2019 Page 1 of 3 PART 2: EXHIBIT LIST DOCKET NO. Under A.A.C. R4-9-118(A), before a hearing, a party must prepare a disclosure statement containing a list of all the exhibits that the party will use at the hearing. Note: All exhibits listed below must be provided to all parties to the hearing. See A.A.C. R4-9-118(B). If you need additional space to list all witnesses, complete and attach additional Exhibit Lists. Example Contract for new garage door. Invoice #10001 – Cost for garage door replacement.

Exhibit Exhibit Name

Form RC-L-800A Prehearing Disclosure Statement Rev. 1/15/2019 Page 2 of 3 PART 3: ACKNOWLEDGEMENT & SIGNATURE I certify that the above information is true and correct and that I will serve a copy of this disclosure statement and any exhibits listed in Part 2 to all parties to the hearing in accordance with A.A.C. R4-9-118. I acknowledge and understand that if I fail to properly disclose a witness or exhibit, the administrative law judge may: • Order that certain witnesses or exhibits not be used at the hearing; • Order that a particular fact is or is not established for the record; or, • Order that a charge, a defense, a claim, or some portion thereof, be dismissed.

I am the (check one):  Complainant  Respondent Docket No.

Print Name Signature Date

Form RC-L-800A Prehearing Disclosure Statement Rev. 1/15/2019 Page 3 of 3