2024A-00681-NPC-ROC Notice of Hearing and Packet MAILED
2024A-00681-NPC-ROC · Registrar of Contractors · 2024-03-19
REGISTRAR OF CONTRACTORS OF THE STATE OF ARIZONA
K&G Construction LLC, Case No. 2024-00681 COMPLAINANT, Docket No. 2024A-00681-NPC-ROC v. NOTICE OF HEARING ON CONTESTED CASE HMW Construction LLC License No. ROC 328765,
RESPONDENT.
This Notice of Hearing is issued under A.R.S. § 41-1092.05(D).
HEARING INFORMATION The hearing is set for:
May 7, 2024 9:00 AM Velva Moses-Thompson Google Meet. A link will be provided directly from The Office of Administrative Hearings. Go to www.azoah.com to request to appear in-person.
If you have requested to appear in-person at the hearing, the hearing will
be held at 1740 W Adams Street, Phoenix, AZ 85007.
You must attend this hearing. This is an adversarial hearing before an administrative law judge, and is conducted in a similar manner as judicial proceedings. Thus, you must be prepared to present evidence, including witness testimony and documents, in support of your case.
STATEMENT OF LEGAL AUTHORITY AND JURISDICTION The State of Arizona has determined that the licensing and regulation of construction contractors is a proper state function, and has vested authority in the Registrar of Contractors
to administer Title 32, Chapter 10 of the Arizona Revised Statutes. A.R.S. §§ 32-1101 et seq.
All hearings for alleged violations of Title 32, Chapter 10 are conducted under Title 41,
Chapter 6, Article 10. A.R.S. § 32-1156.
The statutes and rules governing the hearing can be found at: Arizona Revised Statutes §§ 41-1092 to -1092.12, and Arizona Administrative Code R2-19-101 to -122. PARTICULAR ARIZONA STATUTES AND RULES INVOLVED The statutes and rules the Respondent is alleged to have violated are cited in the complaint and citation, which were served on the Respondent on March 8, 2024.
SHORT AND PLAIN STATEMENT OF THE MATTERS ASSERTED The complaint and citation allege that the Respondent committed the following act(s):
Charge: 1 A.R.S. § 32-1154(A)(10)
THE PARTIES TO THE ADMINISTRATIVE HEARING
Because Respondent is a licensee and is charged with an act(s) or omission(s) that is cause for the suspension or revocation of a license, Respondent is a party to this case and will be a party to the hearing. Because Complainant alleged Respondent committed an act(s) or omission(s) that is cause for the suspension or revocation of a license, Complainant is a party to this case and will be a party to the hearing.
Respondent and Complainant, as the parties to the hearing, will present evidence and
argument to the administrative law judge.
RIGHT TO BE REPRESENTED The parties to the administrative hearing may choose to be represented by an attorney.
A.R.S. § 41-1092.07(B). If one of the parties is a company, the company may be represented by an officer or employee if that person satisfies the conditions set forth in A.R.S. § 32- 1156(B). CHANGE OF ADDRESS Each party must inform the Registrar and the Office of Administrative Hearings of any change of address within five (5) days of the change. A.R.S. § 41-1092.04.
HEARING PROCEDURES AND RULES The administrative hearing will be conducted in accordance with A.R.S. §§ 41-1092 to -1092.12, and A.A.C. R2-19-101 to -122. The parties should review the statutes, rules, and processes governing the administrative hearing. Copies of the statutes, rules, and articles regarding the administrative hearing process can be found at https://www.azoah.com/.
REGISTRAR’S APPEARANCE BY VIDEO CONFERENCE OR TELEPHONE The Registrar’s investigators, employees, and attorneys will appear at the hearing via video conference or telephone unless requested by a party to appear in-person. Requests for the Registrar’s investigators, employees, or attorneys to appear in-person must be filed with the Registrar and the Office of Administrative Hearings no later than seven (7) calendar days prior to the hearing date.
HEARING PACKET In the interests of administrative efficiency, the Registrar compiles and discloses
certain documents to the parties and the Office of Administrative Hearings. These documents
are attached to this Notice of Hearing as the “Hearing Packet.” If any party wishes to submit
additional evidence, they must do so during the hearing after completing a disclosure statement. See “Disclosure Statement” section below. SUBPOENAS FOR TESTIMONY FROM A WITNESS OR DOCUMENTS The parties to the hearing must be prepared to present evidence in support of their
case. If a party wants to obtain testimony from a witness or documents not in the party’s
possession, the party must prepare and file a written subpoena for the Administrative Law
Judge to review and sign, if approved. A.R.S. § 41-1092.07(C). Forms for requesting a
subpoena can be found on the Office of Administrative Hearings’ website at www.azoah.com. The party seeking a subpoena must serve notice on all the parties to the hearing, and on the Registrar. A.R.S. § 41-1092.04.
DISCLOSURE STATEMENT At least seven calendar days before the hearing, each party must prepare and serve a
disclosure statement on all other parties, and file it with the Office of Administrative Hearings.
A.A.C. R4-9-118; A.A.C. R2-19-108. The disclosure statement must include any exhibit the
party will use at the hearing. A party’s failure to timely disclose any witness or exhibit, without good cause, may result in the administrative law judge excluding those witnesses or exhibits from being used at the hearing. A.A.C. R4-9-118(C). A sample disclosure form is available on the Registrar’s website at https://roc.az.gov/forms/RC-L-800A%20- %20Prehearing%20Disclosure%20Statement%2020191007v4.pdf
CHANGING THE HEARING DATE The date of the hearing may only be advanced or delayed on the agreement of the
parties or on a showing of good cause. A.R.S. § 41-1092.05(C). The date of the hearing may
be changed by filing a written agreement of the parties to change the date of the hearing. The
written agreement must be filed with the Office of Administrative Hearings, directed to the
assigned Administrative Law Judge, and transmitted to the Registrar and all other parties. The
assigned Administrative Law Judge may be found on the Office of Administrative Hearings’ web portal at www.azoah.com If a party would like to move the date of the hearing without agreement of all parties, the party must file a written motion with the Office of Administrative Hearings, directed to the assigned Administrative Law Judge, and transmit a copy to the Registrar and all other parties.
The motion must state in detail good cause for why the date of the hearing should be advanced or delayed, and the position of all other parties regarding the advancement or delay. A party may also file a motion asserting a right to an expedited hearing upon a showing of extraordinary circumstances or the possibility of irreparable harm. A.R.S. § 41-1092.05(E).
RESOLUTION SHORT OF ADJUDICATION In any case which is resolved or settled by the parties, or which is withdrawn by the Complainant without objection from Respondent after the Notice of Hearing is issued, the parties must notify the Office of Administrative Hearings of the resolution or settlement. Any such cases will be listed on the Registrar’s website and its records under the category: “Closed Complaints – Resolved/Settled/Withdrawn.” Dated March 19, 2024.
By: /s/ Erika Hoskin Erika Hoskin Legal Secretary Legal Department Arizona Registrar of Contractors Copy mailed via USPS First Class mail March 19, 2024 to: Respondent(s) HMW Construction LLC 4225 S 80th St Omaha, NE 68127
HMW Construction LLC 7887 F St Omaha, NE 68127
Complainant(s) K&G Construction LLC 1578 N Tucana Ct Gilbert, AZ 85234
Copy sent electronically this same date to: Respondent at email address on record with the Registrar Complainant at email address on record with the Registrar
Case No. 2024-00681 /
Katie Hobbs, Governor Martin Quezada, Director
Hearing Packet FAQ What is the Hearing Packet?
The Hearing Packet is a packet of certain documents collected or issued by the Registrar over the course of its investigation.
Who gets the Hearing Packet?
The Hearing Packet is assembled and distributed to all parties and to the Office of Administrative Hearings (“OAH”) prior to an administrative hearing.
What types of cases does the Registrar prepare a Hearing Packet for?
The Registrar prepares a Hearing Packet for Complainant-Handled Cases and No-Pay Cases. Note: If the Docket Number on the Notice of Hearing contains a “CHC” or “NPC”, your case is a Complainant-Handled Case or a No-Pay Case.
What is in the Hearing Packet?
The Hearing Packet contains essential case-specific documents and at a minimum will include the following documents:
● Original complaint;
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Within AZ 877.692.9762 · Fax 602.542.1599 · roc.az.gov Hearing Packet FAQ
Katie Hobbs, Governor Martin Quezada, Director
● Citation; and ● Answer.
The Hearing Packet will also contain the following documents (if applicable):
● Jobsite inspection notices, notes, and photos; ● Written directives; and ● Compliance inspection notices, notes, and photos.
What if there are documents missing from the Hearing Packet?
If there is any evidence you submitted to the Registrar that are not included in the Hearing Packet it is your responsibility to introduce that evidence at the administrative hearing. Note: The administrative law judge assigned to your case does not have access to the entire Registrar record.
If there is additional evidence you submitted to the Registrar during the investigation that you also want to introduce as evidence during your hearing, it is your responsibility to:
● Properly disclose that evidence to the other party; and ● Introduce the evidence during your hearing.
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Within AZ 877.692.9762 · Fax 602.542.1599 · roc.az.gov Hearing Packet FAQ
Katie Hobbs, Governor Martin Quezada, Director
How do I disclose evidence I intend to use at a Hearing?
You must properly disclose any and all documents and witnesses you intend to use at your hearing according to the Registrar’s Prehearing Disclosure Rules. See Arizona Administrative Code Section R4-9-118.
A sample prehearing disclosure form and instructions are provided to the parties by the Registrar.
How do I obtain documents I previously submitted to the Registrar?
If you previously submitted documents to the Registrar and need a copy of these documents, please contact the Registrar’s Legal Department or submit a public records request at https://roc.force.com/AZRoc/s/roc-public-request.
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Within AZ 877.692.9762 · Fax 602.542.1599 · roc.az.gov Hearing Packet FAQ
January 19, 2024
Via U.S. Mail and Email
Complainant K&G Construction LLC 1578 N Tucana Ct Gilbert, AZ 85234
Via U.S. Mail and Email
Respondent HMW Construction LLC 4225 S 80th St Omaha, NE 68127
HMW Construction LLC 7887 F St. Omaha, NE 68127
Re: Complaint No. 2024-00681
Dear Complainant and Respondent:
The Registrar received a complaint filed against HMW Construction LLC for non- payment of materials or services rendered. This complaint is incomplete and will not be substantively reviewed by the Registrar until the following documentation is provided: 1. As indicated on the Non-Payment Complaint Form Instructions & Checklist, provide a copy of the original construction contract signed (by both parties). If no written contract, provide a written statement describing the agreement that includes the following information: • The reason a written contract is not being provided. • A description of the work to be performed under the contract. • The names of the people who negotiated the contract. • The agreed upon payment schedule. • An explanation of who was to receive payment. • The date the work was to be completed.
Please provide ALL requested information by January 29, 2024. The Registrar will close this complaint (as incomplete) without further written notice if you fail to provide the requested documentation by such date.
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg100a 11/23 Documents can be submitted by:
Mail: P.O. Box 18244, Phoenix, Arizona, 85005-8244 In-Person: 1700 W. Washington St., Ste. 105, Phoenix, Arizona, 85007-2812 Email: [email redacted]
Although the complaint is incomplete at this time, Respondent may file a response with the Registrar raising any issues or affirmative defenses to the complaint.
If the required information is provided and this complaint becomes complete, Respondent will be provided an additional opportunity to respond to the complaint.
Sincerely,
/s/ Tedi Quezada ________________ Tedi Quezada Legal Department 1700 W Washington St. Ste. 105 Phoenix, AZ 85007
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg100a 11/23 Non-Payment Complaint Form Departmental Use Only Complaint Number: Mail to: Registrar of Contractors P.O. Box 18243 Phoenix, AZ 85005-8243
Person Filing Complaint (Payee) Business Name Full Name (First Middle Last) ROC License Number(s) (if any) Kevin Thomas Matzke Street Address City State Zip Code 1578 N Tucana Ct Gilbert Arizona 85234 Phone Number Email Address [number redacted] [email redacted] I consent to receive communications electronically in connection with this case
Name of Attorney (if any)
Attorney’s Street Address City State Zip Code
Attorney’s Phone Number Attorney’s Email Address
Licensee Information (Payer) Name (as shown on contracts, invoices, etc.) ROC License Number(s) HMW Construction LLC ROC 328765 Street Address City State Zip Code 4225 S 80th St Omaha NE 68127 Phone Number Email Address
Name of Person(s) Representing License Hank Doss Complaint Information Principal Amount Due (excluding interest and fees) Contract Date (if applicable) $62,992.28 September 18, 2023 Have you filed a civil complaint? No List all specific invoices which have not been paid. Attach additional pages if necessary. 1149, 1146, 1145, 1143, 1142, 1140
Certification I certify, upon information and belief, that the above-named licensee has failed to pay monies in excess of seven hundred fifty dollars when due for materials or services rendered in connection with the licensee’s operations as a contractor. I further certify, upon information and belief, that the above-named licensee has the capacity to pay, or has received sufficient monies as payment for the particular construction work project or operation for which the services or materials were rendered or purchased. A.R.S. § 32-1154(A)(10). Printed Name Signature Date Kevin Thomas Matzke Declaration & Signature I am the Complainant in this Complaint Form or Complainant’s duly authorized representative. I declare under penalty of perjury that the information contained in this Form is true and correct to the best of my knowledge. I further certify that any documents submitted in support of this complaint are true and correct copies of the originals and are accurate to the best of my knowledge. I will assist in the investigation or in the prosecution of the contractor or other parties, and will, if necessary, attend hearings and testify to facts. Printed Name Signature Date Kevin Thomas Matzke INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to HMW Construction 129 East Pima Street Phoenix, AZ 85004
Invoice details Invoice no.: 1140 Terms: Due on receipt Invoice date: 09/18/2023 Due date: 09/25/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 LUMEN Project P.032287
2. 09/19/2023 Drilling/Bore $10.50 $1,365.00 Bore Single Pipe-7 day pay
P-68 to corner of 7251 E Navarro Ave, to cross to North side of street and north on Terripin Circle. 130ft total 3 pipes
3. 09/19/2023 Bore-Additional Pipe 7 Day 130 $1.125 $146.25 Bore-Additional Pipe-7 day pay
P-68 to corner of 7251 E Navarro Ave, to cross to North side of street and north on Terripin Circle. 130ft total 3 pipes
4. 09/19/2023 Bore-Additional Pipe 7 Day 130 $1.125 $146.25 Bore-Additional Pipe-7 day pay
P-68 to corner of 7251 E Navarro Ave, to cross to North side of street and north on Terripin Circle. 130ft total 3 pipes
5. 09/20/2023 Drilling/Bore $10.50 $1,942.50 Bore Single Pipe-7 day pay
P-13 South, crossing E Navarro Ave to splice pipes from P-68. Total 185ft, 3 Pipes
6. 09/20/2023 Bore-Additional Pipe 7 Day 185 $1.125 $208.13 Bore-Additional Pipe-7 day pay
P-13 South, crossing E Navarro Ave to splice pipes from P-68. Total 185ft, 3 Pipes 7. 09/20/2023 Bore-Additional Pipe 7 Day 185 $1.125 $208.13 Bore-Additional Pipe-7 day pay
P-13 South, crossing E Navarro Ave to splice pipes from P-68. Total 185ft, 3 Pipes
8. 09/20/2023 Existing Facility 4 $31.80 $127.20 Dig and Expose Existing Facility-Per Cubic Yard
2637 S Terripin Circle 2649 S Terripin Cirlce
9. 09/21/2023 Drilling/Bore $10.50 $903.00 Bore Single Pipe-7 day pay
S-102 South to splice with pipes from P-67. West side of 72nd Circle. Total 86 ft, 2 pipes
10. 09/21/2023 Bore-Additional Pipe 7 Day 86 $1.125 $96.75 Bore-Additional Pipe-7 day pay
S-102 South to splice with pipes from P-67. Total 86 ft, 2 pipes
11. 09/21/2023 Existing Facility 2 $31.80 $63.60 Dig and Expose Existing Facility-Per Cubic Yard
2654 S 72nd Circle
12. 09/22/2023 Drilling/Bore $10.50 $6,825.00 Bore Single Pipe-7 day pay
72nd Street from E Madero Ave to E Monte Ave, East side of 72nd St. 650ft, 1 pipe
13. 09/22/2023 Drilling/Bore $10.50 $1,701.00 Bore Single Pipe-7 day pay
2654 S 72nd Circle to P-12. West side of 72nd Circle. 162ft total, 2 pipes
14. 09/22/2023 Bore-Additional Pipe 7 Day 162 $1.125 $182.25 Bore-Additional Pipe-7 day pay
2654 S 72nd Circle to P-12. West side of 72nd Circle. 162ft total, 2 pipes
15. 09/22/2023 Existing Facility 4 $31.80 $127.20 Dig and Expose Existing Facility-Per Cubic Yard
2646 S 72nd Circle 2638 S 72nd Circle
16. Hydro- Vac Dump 7 $100.00 $700.00 Hydro-Vac Dump Charge
17. $0.00 ACH ON 10/10/23 FOR 13496.55
Total $14,742.26 Cash, Zelle or Approved Check excepted for payment
Payment -$9,757.49 Balance due $4,984.77
Overdue 09/25/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to HMW Construction 129 East Pima Street Phoenix, AZ 85004
Invoice details Invoice no.: 1142 Terms: Due on receipt Invoice date: 10/02/2023 Due date: 10/09/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 Project P.032287 Lumen
2. Drilling/Bore $10.50 $3,318.00 Bore Single Pipe-7 day pay
7445 E Nopal Ave, P-42 to P-74 @7505 E Nopal Ave. 316ft, 4 pipes total
3. Bore-Additional Pipe 7 Day 316 $1.125 $355.50 Bore-Additional Pipe-7 day pay
7445 E Nopal Ave, P-42 to P-74 @7505 E Nopal Ave. 316ft, 4 pipes total
4. Bore-Additional Pipe 7 Day 315 $1.125 $354.38 Bore-Additional Pipe-7 day pay
7445 E Nopal Ave, P-42 to P-74 @7505 E Nopal Ave. 316ft, 4 pipes total
5. Bore-Additional Pipe 7 Day 316 $1.125 $355.50 Bore-Additional Pipe-7 day pay
7445 E Nopal Ave, P-42 to P-74 @7505 E Nopal Ave. 316ft, 4 pipes total
6. Existing Facility 6 $31.80 $190.80 Dig and Expose Existing Facility-Per Cubic Yard
7449 E Nopal Ave 7457 E Nopal Ave 7461 E Nopal Ave 7. Asphalt 4 $7.313 $29.25 Asphalt-Temperary Cold Patch-Per Square Foot
8. Drilling/Bore $10.50 $4,147.50 Bore Single Pipe-7 day pay
P42 to corner of S Raven and E Nopal Ave. 2 Pipes. Total ft 395. 1-395, 2-215
9. Bore-Additional Pipe 7 Day 215 $1.125 $241.88 Bore-Additional Pipe-7 day pay
P42 to corner of S Raven and E Nopal Ave. 2 Pipes. Total ft 395. 1-395, 2-215
10. Asphalt 2 $7.313 $14.63 Asphalt-Temperary Cold Patch-Per Square Foot
11. Pedestal-Medium 1 $24.33 $24.33 Pedestal-Medium RMV-Per Unit 7 Day
12. Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium-Per Unit 7 Day
13. Existing Facility 6 $31.80 $190.80 Dig and Expose Existing Facility-Per Cubic Yard
7437 E Nopal Ave 7425 E Nopal Ave 7415 E Nopal Ave
14. 10/05/2023 Drilling/Bore $10.50 $4,431.00 Bore Single Pipe-7 day pay
P-58 to P-36 and past in preparation to cross street east 422ft total, 1-422, 2-280
15. 10/05/2023 Bore-Additional Pipe 7 Day 280 $1.125 $315.00 Bore-Additional Pipe-7 day pay
P-58 to Connection @ S Raven and E Nopal Ave 280 ft total
16. 10/05/2023 Asphalt 6 $7.313 $43.88 Asphalt-Temporary Cold Patch-Per Square Foot
17. 10/05/2023 Existing Facility 10 $31.80 $318.00 Dig and Expose Existing Facility-Per Cubic Yard
2748 S Raven 2744 S Raven 2738 S Raven 2724 S Raven 2710 S Raven
18. 10/06/2023 Drilling/Bore $10.50 $1,785.00 Bore Single Pipe-7 day pay
7446 E Naranja 170 ft total, 2 pipes 19. 10/06/2023 Bore-Additional Pipe 7 Day 170 $1.125 $191.25 Bore-Additional Pipe-7 day pay
7446 E Naranja Ave
20. 10/06/2023 Asphalt 11.5 $7.313 $84.10 Asphalt-Temperary Cold Patch-Per Square Foot
21. 10/06/2023 Existing Facility 8 $31.80 $254.40 Dig and Expose Existing Facility-Per Cubic Yard
7446 E Naranja Ave 7438 E Naranja Ave 7426 E Naranja Ave 7416 E Naranja Ave
22. Pedestal-Medium 2 $28.612 $57.22 Pedestal-Medium-Per Unit 7 Day
23. Pedestal-Medium 2 $24.33 $48.66 Pedestal-Medium RMV-Per Unit 7 Day
24. Hydro- Vac Dump 11 $100.00 $1,100.00 Hydro-Vac Dump Charge
25. $0.00 ACH ON 10/23/23 FOR 14913.68
26. $0.00 975.30 ACH CREDITED FROM 10/16/23 ACH PAYMENT ON INVOICE 1141
Total $17,879.69 Cash, Zelle or Approved Check excepted for payment
Payment -$15,888.98
Balance due $1,990.71
Overdue 10/09/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to HMW Construction 129 East Pima Street Phoenix, AZ 85004
Invoice details Invoice no.: 1143 Terms: Due on receipt Invoice date: 10/09/2023 Due date: 10/16/2023
# Date Product or service SKU Qty Rate Amount
1. 10/09/2023 Drilling/Bore 280 $10.50 $2,940.00 Bore Single Pipe-7 day pay
7438 E Naranja Ave to 2753 S Raven. 280ft total, 2 Pipes
2. 10/09/2023 Bore-Additional Pipe 7 Day 280 $1.13 $316.40 Bore-Additional Pipe-7 day pay
7438 E Naranja Ave to 2753 S Raven. 280ft total, 2 Pipes
3. 10/09/2023 Asphalt 8 $7.31 $58.48 Asphalt-Temperary Cold Patch-Per Square Foot
4. Drilling/Bore 444 $10.50 $4,662.00 Bore Single Pipe-7 day pay
P73-P40. 444ft total, 1 Pipe
5. 10/10/2023 Existing Facility 10 $31.80 $318.00 Dig and Expose Existing Facility-Per Cubic Yard
7462 E Naranja Ave 7506 E Naranja Ave 7510 E Naranja Ave 7514 E Naranja Ave 7518 E Naranja Ave
6. Asphalt 5 $7.31 $36.55 Asphalt-Temperary Cold Patch-Per Square Foot 7. Pedestal-Medium 1 $28.61 $28.61 Pedestal-Medium-Per Unit 7 Day
8. Pedestal-Medium 1 $24.33 $24.33 Pedestal-Medium RMV-Per Unit 7 Day
9. 10/11/2023 Drilling/Bore 905 $10.50 $9,502.50 Bore Single Pipe-7 day pay
P-51 to 7422 E Navarro Ave. 905ft total, 2 Pipes
10. 10/11/2023 Bore-Additional Pipe 7 Day 260 $1.125 $292.50 Bore-Additional Pipe-7 Day Pay
P-51 to 7422 E Navarro Ave. 905ft total, 2 Pipes
11. 10/11/2023 Existing Facility 16 $31.80 $508.80 Dig and Expose Existing Facility-Per Cubic Yard
7518 E Navarro Ave 7512 E Navarro Ave 7502 E Navarro Ave 7460 E Navarro Ave 7442 E Navarro Ave 7432 E Navarro Ave 7428 E Navarro Ave 7422 E Navarro Ave
12. 10/11/2023 Asphalt 12 $7.313 $87.76 Asphalt-Temperary Cold Patch-Per Square Foot
13. 10/12/2023 Drilling/Bore 465 $10.50 $4,882.50 Bore Single Pipe7 day pay 465ft total
P-52 to P-51. 2 Pipe 465ft. P-49 to connection @ 2650 S Raven. 1 Pipe 165ft
14. 10/12/2023 Bore-Additional Pipe 7 Day 300 $1.125 $337.50 Bore-Additional Pipe-7 Day Pay
P-52 to P-51. 2 Pipe 465ft. P-49 to connection @ 2650 S Raven. 1 Pipe 165ft
15. Existing Facility 4 $31.80 $127.20 Dig and Expose Existing Facility-Per Cubic Yard
7413 E Navarro Ave 7452 E Navarro Ave
16. 10/12/2023 Asphalt 42 $7.313 $307.15 Asphalt-Temperary Cold Patch-Per Square Foot
17. 10/13/2023 Drilling/Bore 75 $10.50 $787.50 Bore Single Pipe-7 Day Pay
7422 E Navarro Ave crossing street to 7421 E Navarro Ave. Total 75 ft, 2 pipes 18. Drilling/Bore $10.50 $787.50 Bore Single Pipe-7 Day Pay
7422 E Navarro Ave crossing street to 7421 E Navarro Ave. Total 75 ft, 2 pipes
19. Hydro- Vac Dump 11 $100.00 $1,100.00 Hydro-Vac Dump Charge
20. Asphalt 24 $7.313 $175.51 Asphalt-Temporary Cold Patch-Per Square Foot
21. Pedestal-Medium 4 $24.33 $97.32 Pedestal-Medium RMV-Per Unit 7 Day
22. Pedestal-Medium 4 $28.612 $114.45 Pedestal-Medium-Per Unit 7 Day
23. $0.00 ACH 11/1/23 FOR 25,075.98
Total $27,492.56 Cash, Zelle or Approved Check excepted for payment
Payment -$25,075.98
Balance due $2,416.58
Overdue 10/16/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to Ship to HMW Construction HMW Construction 129 East Pima Street 129 East Pima Street Phoenix, AZ 85004 Phoenix, AZ 85004
Invoice details Invoice no.: 1145 Terms: Due on receipt Invoice date: 10/22/2023 Due date: 10/22/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 P.032287
2. 10/20/2023 Drilling/Bore $10.50 $8,893.50 Bore Single Pipe-7 day pay
7442 E Nido Ave to P63/ End of Street. 2 Pipes, 847ft total. 1-847ft/1-197ft
3. 10/20/2023 Bore-Additional Pipe 7 Day 197 $1.125 $221.63 Bore-Additional Pipe-7 day pay
7442 E Nido Ave to P63/ End of Street. 2 Pipes, 847ft total. 1-847ft/1-197ft
4. 10/20/2023 Asphalt 36 $7.313 $263.27 Asphalt-Temperary Cold Patch-Per Square Foot
5. 10/20/2023 Existing Facility 22 $31.80 $699.60 Dig and Expose Existing Facility-Per Cubic Yard
7446 E Nido Ave 7456 E Nido Ave 7462 E Nido Ave 7466 E Nido Ave 7510 E Nido Ave 7514 E Nido Ave 7526 E Nido Ave 7532 E Nido Ave 7542 E Nido Ave 7546 E Nido Ave 6. 10/20/2023 Hydro- Vac Dump 14 $100.00 $1,400.00 Hydro-Vac Dump Charge
7. 10/20/2023 Cut Concrete 14 $4.335 $60.69 Concrete RMV Per Sq Ft 7 Day Pay
8. 10/20/2023 Pedestal-Medium 1 $24.33 $24.33 Pedestal-Medium RMV-Per Unit 7 Day
9. 10/20/2023 Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium-Per Unit 7 Day
10. 10/17/2023 Asphalt 14 $7.313 $102.38 Asphalt-Temperary Cold Patch-Per Square Foot
11. 10/17/2023 Drilling/Bore $10.50 $5,932.50 Bore Single Pipe-7 day pay
P50 2662 S Raven to P53 2628 S Raven. 565ft total, 3 Pipes. 1-565/1-180/1-76
12. 10/17/2023 Bore-Additional Pipe 7 Day 180 $1.125 $202.50 Bore-Additional Pipe-7 day pay
P50 2662 S Raven to P53 2628 S Raven. 565ft total, 3 Pipes. 1-565/1-180/1-76
13. 10/17/2023 Bore-Additional Pipe 7 Day 76 $1.125 $85.50 Bore-Additional Pipe-7 day pay
P50 2662 S Raven to P53 2628 S Raven. 565ft total, 3 Pipes. 1-565/1-180/1-76
14. 10/17/2023 Existing Facility 14 $31.80 $445.20 Dig and Expose Existing Facility-Per Cubic Yard
2650 S Raven 2644 S Raven 2534 S Raven 2620 S Raven 2616 S Raven 2610 S Raven
15. 10/17/2023 Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium-Per Unit 7 Day P50
16. 10/17/2023 Pedestal-Medium 1 $24.33 $24.33 Pedestal-Medium RMV-Per Unit 7 Day P50
17. 10/17/2023 Cut Concrete 6 $4.335 $26.01 Concrete RMV Per Sq Ft 7 Day Pay
Total $18,438.66 Cash, Zelle or Approved Check excepted for payment
Payment -$14,913.68
Balance due $3,524.98 Overdue 10/22/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to Ship to HMW Construction HMW Construction 129 East Pima Street 129 East Pima Street Phoenix, AZ 85004 Phoenix, AZ 85004
Invoice details Invoice no.: 1146 Terms: Due on receipt Invoice date: 10/23/2023 Due date: 10/27/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 P.0032289
2. 10/27/2023 Drilling/Bore $10.50 $9,639.00 Bore Single Pipe-7 day pay
P60-P63 total 918ft. 1-918/2-208
3. 10/27/2023 Bore-Additional Pipe 7 Day 208 $1.125 $234.00 Bore-Additional Pipe
P60-P63 total 918ft. 1-918/2-208
4. 10/27/2023 Hydro- Vac Dump 13 $100.00 $1,300.00 Hydro-Vac Dump Charge
5. 10/27/2023 Existing Facility 18 $31.80 $572.40 Dig and Expose Existing Facility-Per Cubic Yard
7446 E Nido Ave 7450 E Nido Ave 7456 E Nido Ave 7466 E Nido Ave 7504 E Nido Ave 7510 E Nido Ave 7520 E Nido Ave 7538 E Nido Ave 7542 E Nido Ave 6. 10/27/2023 Asphalt 49 $7.313 $358.34 Asphalt-Temporary Cold Patch-Per Square Foot
7. 10/27/2023 Pedestal-Medium 8 $28.612 $228.90 Pedestal-Medium-Per Unit 7 Day
8. 10/27/2023 Pedestal-Medium 8 $24.33 $194.64 Pedestal-Medium RMV-Per Unit 7 Day
9. 11/03/2023 Drilling/Bore $10.50 $14,805.00 Bore Single Pipe-7 day pay
HH 41044 to P57 1410 ft total. 1-1410/2-440
10. 11/03/2023 Bore-Additional Pipe 7 Day 440 $1.125 $495.00 Bore-Additional Pipe-7 day pay
HH 41044 to P57 1410 ft total. 1-1410/2-440
11. 11/03/2023 Hydro- Vac Dump 13 $100.00 $1,300.00 Hydro-Vac Dump Charge
12. 11/03/2023 Existing Facility 24 $31.80 $763.20 Dig and Expose Existing Facility-Per Cubic Yard
2632 S Rowen 2628 S Rowen 2618 S Rowen 7434 e Natal Ave 7438 E Natal Ave 7442 E Natal Ave 7450 E Natal Ave 7454 E Natal Ave 7464 E Natal Ave 7506 E Natal Ave 7536 E Natal Ave 7548 E Natal Ave
13. 11/03/2023 Asphalt 68 $7.313 $497.28 Asphalt-Temporary Cold Patch-Per Square Foot
14. 11/03/2023 Pedestal-Medium 6 $28.612 $171.67 Pedestal-Medium-Per Unit 7 Day
15. 11/03/2023 Pedestal-Medium 6 $24.33 $145.98 Pedestal-Medium RMV-Per Unit 7 Day
16. $0.00 ACH PAYMENT MADE 12/18/23 14913.68
Total $30,705.41 Cash, Zelle or Approved Check excepted for payment
Overdue 10/27/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to Ship to HMW Construction HMW Construction 129 East Pima Street 129 East Pima Street Phoenix, AZ 85004 Phoenix, AZ 85004
Invoice details Invoice no.: 1149 Terms: Due on receipt Invoice date: 11/27/2023 Due date: 11/27/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 P032287
2. Drilling/Bore $10.50 $4,536.00 Bore Single Pipe-7 DAY PAY
P59-P60 1 pipe 432ft total
3. 11/24/2023 Hydro- Vac Dump 12 $100.00 $1,200.00 Hydro-Vac Dump Charge
4. 11/24/2023 Bore-Additional Pipe 7 Day 191 $1.125 $214.88 Bore-Additional Pipe-7 DAY
P59-P80 1 additional pipe 191ft total
5. 11/24/2023 Pedestal-Medium 3 $28.612 $85.84 Pedestal-Medium-Per Unit 7 Day P59 P60 P80
6. 11/24/2023 Pedestal-Medium 3 $24.33 $72.99 Pedestal-Medium RMV-Per Unit 7 Day P59 P60 P80 7. 11/24/2023 Existing Facility 12 $31.80 $381.60 Dig and Expose Existing Facility-Per Cubic Yard-7 DAY PAY 7438 E Nido Ave 7428 E Nido Ave 7418 E Nido Ave 7414 E Nido Ave 7410 E Nido Ave 2604 S Raven
8. 11/24/2023 Asphalt 30 $7.313 $219.39 Asphalt-Temperary Cold Patch-Per Square Foot 7 DAY PAY
9. 11/24/2023 Drilling/Bore $10.50 $2,499.00 Bore Single Pipe-7 DAY PAY P.019840
S-71 to North Side of East Plana Ave @ 9538 E Plana Ave to existing pipe and connect 238ft total, 1 Pipe
10. 11/24/2023 Existing Facility 4 $31.80 $127.20 Dig and Expose Existing Facility-Per Cubic Yard-7 DAY PAY 3123 S Cortland Circle 3111 S Cortland Circle P.019840
11. 11/24/2023 Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium RMV-Per Unit 7 Day S71 P.019840
12. 11/24/2023 Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium-Per Unit 7 Day S71 P.019840
13. 11/24/2023 Asphalt 1 $7.313 $7.31 Asphalt-Temperary Cold Patch-Per Square Foot 7 DAY PAY P.019840
14. 11/24/2023 Drilling/Bore $10.50 $2,205.00 Bore Single Pipe-7 DAY PAY P.019840 3305 E Pampa Ave to SE Corner of S 93rd St/E Portobello to HH P31, 210ft total 1 Pipe
15. 11/24/2023 Drilling/Bore $10.50 $5,775.00 Bore Single Pipe-7 DAY PAY P019840 From S29 to NW Corner of E Portobello Ave/S 93rd St and turned corner to West and drilled along North side of E Portobello Ave to 92 Circle to join existing pipe
total 550 ft, 1 Pipe, 250ft for 2 Pipes
16. 11/24/2023 Bore-Additional Pipe 7 Day 250 $1.125 $281.25 Bore-Additional Pipe-7 DAY PAY NW Corner of E Portobello Ave/S 93rd St, West to S 92nd Circle, on North Side
Total 2 Pipes, 250Ft
17. 11/24/2023 Asphalt 42 $7.313 $307.15 Asphalt-Temperary Cold Patch-Per Square Foot 7 DAY PAY 18. 12/01/2023 Hydro- Vac Dump 14 $100.00 $1,400.00 Hydro-Vac Dump Charge
Total $19,369.83 Cash, Zelle or Approved Check excepted for payment
Overdue 11/27/2023 Received 1/24/24, 10:12 AM State of Arizona Mail - Fwd: Case 2024-00681 - Notice of Incomplete No-Pay Complaint - DO NOT REPLY 1/22/2024 ROC Legal
Legal New Mail - AZROC <[email redacted]>
Fwd: Case 2024-00681 - Notice of Incomplete No-Pay Complaint - DO NOT REPLY message
ap ap <[email redacted]> Mon, Jan 22, 2024 at 9:28 AM To: [email redacted], jason hatcher <[email redacted]>
Good Morning!
Please see below and attached for response to their claim: Invoice = 1132 = $6532.80 PAID via ACH 09-08-2023, Invoice was paid in full no adjustments because it was correct. Invoice = 1134 = $19,487.79, PAID via ACH 09-08-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1135 = $6,627.25, PAID via ACH 09-18-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1137 = $3,622.50, PAID via ACH 09-18-2023, Invoice was paid in full no adjustments because it was correct. Invoice = 1138 = $17,850.00 PAID via ACH 09-25-2023, Invoice was paid in full no adjustments because it was correct. Invoice = 1139 = $18,321.60 PAID via ACH 09-25-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1140 = $13,496.55 PAID via ACH 10-10-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1141 = $14,913.68 PAID via ACH 10-23-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1142 = $16,430.42 PAID via ACH 10-16-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1145 = $14,913.68 PAID via ACH 12-15-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1146 = $29,213.99 PAID via Check #4428 on 01-10-2024, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1149 = We have no record of receiving this invoice until it was included on this email. It will be sent through our approval process and paid.
We have also attached our Subcontract Agreement with this Subcontractor for your review. We have attached all of the invoices in question of being paid in full as well.
Please reach out if you have any further questions.
Thank you,
---------- Forwarded message --------- From: Tedi Quezada <[email redacted]> Date: Fri, Jan 19, 2024 at 9:01 AM Subject: Case 2024-00681 - Notice of Incomplete No-Pay Complaint - DO NOT REPLY To:
Hello,
Please see the attached electronic courtesy copy of the Notice of Incomplete No-Pay Complaint issued in Case 2024-00681. This document was also sent to your attention via US Mail.
PLEASE DO NOT REPLY DIRECTLY TO THIS EMAIL. Any reply or response should be addressed to [email redacted]
Thank you
Tedi Quezada Legal Assistant II Legal Department Arizona Registrar of Contractors Main: 602.542-1525
Email: [email redacted]
The ROC is now on social media! Make sure to follow us on:
Fill out AZ ROC's survey to let us know how we're doing and how we can better serve you!
--
HMW Construction, LLC 4225 South 80th Street Omaha, NE 68127 402-275-6103
https://mail.google.com/mail/b/AEoRXRRTcjId_YujiEmoR9YzEkt4RA1BIZZqLXKJ1mmg2ARjSVaU/u/0/?ik=d3afebeda9&view=pt&search=all&permthi… 1/2 Received 1/24/24, 10:12 AM State of Arizona Mail - Fwd: Case 2024-00681 - Notice of Incomplete No-Pay Complaint - DO NOT REPLY 1/22/2024 attachments ROC Legal
20240119 Notice of Incomplete No-Pay Complaint 2024-00681 MAIL.pdf 506K Invoice_1140_from_KG_Construction_LLCDG_Landscape_LLC_ROC_346290_346254.pdf 689K K&G Inv. 1145.pdf 591K K&G Inv. 1146 - REVISED.pdf 578K Invoice_1141_from_KG_Construction_LLCDG_Landscape_LLC_ROC_346290_346254.pdf 998K K&G Inv. 1142.pdf 805K Invoice_1135_from_KG_Construction_LLCDG_Landscape_LLC.pdf 415K Invoice_1139_from_KG_Construction_LLCDG_Landscape_LLC.pdf 643K Invoice_1134_from_KG_Construction_LLCDG_Landscape_LLC.pdf 1000K Subcontract Agreement for K& G Construction for Pauley Job.pdf 1999K
https://mail.google.com/mail/b/AEoRXRRTcjId_YujiEmoR9YzEkt4RA1BIZZqLXKJ1mmg2ARjSVaU/u/0/?ik=d3afebeda9&view=pt&search=all&permthi… 2/2 Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal Received 1/22/2024 ROC Legal
SUBCONTRACT ACREEI\TENT
This Agrecment is made on this day of _ 202., ry and beiween HMW Consauction LLC (.Contracto:r1 and
In consideration ofthc mulpgr covenan* set forth to fumish bercin and the mutuar benefits gained by the performarce hereoi the parties b bc here,to aro fof fo*., ", l. The consist ofthis Agreemenl tre prime s bid and afiy documents ents or agn agr@ments referenced therein, special , specifications, drawings, drawings, issued.and ac*nowr&g"o u"r"* gxecuuon rqJxl;s oelors ;ilgl"'ffi i.*',ii";;-iol this l#irT.:r"{":,il5i1I, addendt addenda and modincations i,J; tl*: j:: Ag3i:::i1i*1l*,r?r tl#*j: lm:* i;";;;; Agreemenl smendmenq i,il i;";;;d;; iiii',r,r other documents ii,i',r,r ag..",.n,. ag..",.n,. n" fi :: l"^1':^+r-:1.*-i and supersedes pri* *s"ii;,t"rr, ffi #iii ;;;;;;;;#;ffi ;f";:Tilffif*::ffi ;:ffiffffi;h:,:i"*. "'"',f;"ffi3:T:::"r, 7. rtoy pow.l ofqqirye Contract. Subcontractor is bound torhe Contractor by the terms andsame f"*I,:*?I#*1.9:**:. con'actor ('primc contract'). A yy t copv orthe :o..rhelqwnelunduitr,"-co"];r *t*""n the *' owner and prim" c."*"i*rii u" p?ifi::"ilTlH*T subcontractor undcrrakes ro perform ail rhc duties anJobrigutioi; oirhu conbrctor under rhe Primc Contracr, insofar as said duties-and obligarions arc WorL Subcontnacror wi n nor do. or fai t ro dolany acr, i f iaiJ,ii.*,fy *inairectly, to rhe by-;;; ; con'aaor wourd be in breach of rhe prime contra.,. rrc"'""."*'rirr.rs ;"h' ;;;;;;ii,irl"'*,, any damagg incruding those under the prime Contract for liquidarod damagis or oril", con'actor shalr be entitred to recovei (ineruding by"mean" f..g", fo, aelays, then otguinrt uny u,nouno othcrwisc owning io subcontracror) su;t *rrr ino a"-"i"t "rli;"i i-..lru"o"tt in proportion o Subcontractor's responsibiriry for such dcray and durrg;. responsibili-ry for such delay and damages in a;;;;; "arentirred ro E ocatc shafl be is sole aiircrl"nl'i"iil.tor, aetcrminstion thercofshall be final and binding upontubcontractor.
3.
Scanned with CamscaRnsr Received 1/22/2024 ROC Legal 't
4, ScMulc. Timc is of thc csscncr end thc Subcootactq qlees to kocp thoroughty infqrnd es m thc ovcnll proEress of dle Projccq to commcncc lnd to pto's€cutr thc Wort uo&rtatsr ln a pmmpt and diligcnl manner rfrenever such Work, or oty plrt of it, bccomcs availablo, or at such timc or limes os the Contractor may dirEcl. so rs to pIqnoic ttc gcmnl pogrcss of dr Projcct Ifthc Primc Contraa provides for an assessment ofliquidatod damaget against tho Contuctor, or acrrnl &lry damagcs suffcrcd by the Ovmer, lh! Subclotrsctor shall bc liablc to lhc Cootzctor for rny portion ofsuch demages that may, in th€ Contr8ctor'c disc1Etioq be a[ributed to the Subsonrecior's delays or failurc to pcrform or complcte the Subconfrd Work as rcquircd by thc Subconeact or thc Subconract Documents.
5- lnsurapce RcouirEmcnts. Subconhctor shall obtsin, meintain and pay for insurrncc in thc amount sct forth in thc attrched Subcontrr8tor ltrlurrnci€ Rcaoircrnartr or such glalcr amount if rcquircd by law. Sukontraclor's insurance shall be primary rnd nmc Contractor end Owna as additional insurcds" and shall *,aive subroption for the bcnefit of Cont&lor and Owncr.
6. Cedificates of Insuraoce. Subcontractor sholl submit a cadificat" of insuanco cvidencing insurance cowrage before any rvork is stsried on the Projesd
7. Pament of Bills. Subcontraaor shall pay for all materials, skill, tabor and insaumenrrliti6 lricd ir1 or in connection $ith the p€rformance ofthis Subcoffiact whcn and rs bills or claims lhcrefore come due, &nd to savc and protcct the Projcc! fhe Own* aod Contraclor from all claims if on liers on accouut [rereo{, and to fi.rnish satisfactory evidcoce to Contactor, whe! snd rcquircd lhat Subcontnactor hrs compihd with thc aborrc requircments.
8. Hold harmless, To the fullest cxtent penru'rcd by lsw, Suboo[kactor.grc€s to dcfcnd, indemnify and hold trarmless the Projcc! the Owner atd Conractor fiom ony and all loas or darnrgs oceasioned wholly or in pan by drc negJigent oct or omission of the Subcontactor or tlrat of anyone directly or indirectly employed by ihcm or perfomring thc Work of this Subcotrtsr.i urder the direction ofthe Subcon&actor or anyooe for whosc acts aoy ofthem may be liablc in carrying out rhc provisions ofthis Subcontrac.
o Or.rter Mandates. Subconbactor shall fully comply wilh all rtquiremeos nccrsirarcd by &e Owner, including any associated laws affecting the Work Suoh rcquircmants may includc applicablc prcrailing wagc laws, rse and tziniag ofrpprcnticeq nonollu5ion, dnrg r.ding; meeting subconrracting outreach goals, local hiring rulcs, labor rcpresentation rulcg cmplopc hackground che,cking and hngcrprintin& E-VGtiry, using only American-mrdc oltedtls, cle. Connactor will atempt to include refercnce to tho lpplicable rcquircmcots in tbc Subconhci Docurnent& or the ciginal Projcct bid documcnl!, ot make rcfertncc to fioir.yrilabillty ftom fto public cntity. However, failurc by Contrtctor to do so shall not rllicrrc Subcortncbr from iB obligarion for cnmplying with sll such roqukcmenls and paying all co$s and cxpcnsas lsseirtod therewidl. Suboonlr.ctor is solely rcsponsiblc for dacrnining thc epgllcabilig ofal! sttch raquirementc to Subcontrador's Scopa of Worlc
Assimrbilitv. This Subcomrlct nor rry psrr hGrlof,, rhall bo assigncd or ftrrthcr sublci by thc SubconFrtr witbout firn obtaiolng pemissioq in wrltin& form Conlrclor. ln Llrc cvcnl subcootncror ftrrhcr rublas or assignr any put 6 hbrlst oflhis Subconrracq widr tho approvrl of Colrtracror, thc Subcsrtrai:lor rhall bc bound by thc ermr rnd cditions of thir Subcontr*t Subcontrr€lor shlll bc fully rcsponsiblc for rll agtr md omisrlonr of ir Subcontnctort.
Scanned with CamScanner Received 1/22/2024 ROC Legal
I l. Subconuaeror cerlifica th.t lhc Wo* againsr tlt d€fccrr in mlterial, and {o*, pcriod '"qrrtlllnsnrp ,0r fa_aa- ofonc of onc ((lI ) yerf iom tie year from dat" of finrl rhc date finaf acccptancc of ilort by tri Work oi dre Uy Lbntstctor' r Luliil contraclor's rcress! ftom responsibirity to rhe """.pun"" owncr, whichcvcr time pcriod (the "Yuranty. P"riod.) rnd agrr.. to ln"k" good, :]:l!!,r or n/orkmrnship .t iu own cxpensg any a.f."i ii malcnals which may occur or develop prior b rhe .fd oithc iv;anry period.
12. In thc cvent tie Subcontractor shatl fail ro conect raplacc and/or-rc-cxecrne fiulty or defective work donc and/or matcrials fumishcd undcr this subcontract when snd rs rcquired by Cont actor, Conr&ctor' upon l! wrinen norice o _!0 days wrincn tl lo thc halc the'righr !o correct, repiace and/or rc-exdc such faulty of dcfecrivc IYg::-l :n:, wo q or b tlkc ovcr tris Subc6ntract and cornpctc tt e ,arn" eitfrir Gugh -Jiii..., ii;; . through a contsactor.'uu"onto"to, oit ffi#ffi;f#ilil;:'-'* ilp.";d"jEl;;: "d'l"y; contsactor or subcontmstor of its choicc. and to charce the cost thcreofto tha subcontrsctor, roge6"r rri* " -y ott "ia*;;;; 13' Tcrmingtior. The performance ofthe work under this Subconaact may be tcrminated for any reason by the Conaactori in whole or in part, any time, by thrce (3) days writte, ;b;. -il: evcDt.ofa tcrmination, the subcontracroi witt stop t oi ,nd follow thi contractor,s insrructions tor wlndlngdown thc job. In the event the Subcontract is teminated and the Subcontractor is not in dcfEult ofany ofits obrigations under the Subconuact, p&ynenr for ar work sarisfsctoriry complercd. h any ih" sub"ont r,ri1 be enritred to * termination, entitled to payment for uncompreted worrq or for 8nt'iciputJprofit s;b";;;.";;iri*il- "",o, or unuusoru"a ou"*".a. Ir thc contrarror has been terminated by thc bwn"r, suu"ont provisions of the prime contracr-Norhing in this "-"Io, *i[ be b*,nd uy tt ri.*in"iion - Agrearnent sh"[ be ili;il cmploymcnt agreement between Contractir and Subtntracto, fo. p"rti"ui", ti;;----' -' "onsrrued; "ry 14. Paynent will be made to the Subcontractor in accordancc with procedurcs set forthG th-e prirn',, Co"t thc tfr"t ifr" shall provide their E^..:--r requircd L:rr! "a "*".p billing information and documcnts on or before ofthe month. PaymenE :|1ll work ::9, ?1oln" 9uc g-," after to rhe Subcontractor untit i daysg'." rq;srv.r rcceives Paymenr payment r( fot such fiom th" on-er una su''-- h."s submitted an applicstion for payme;r ro ih; contncrn, For contractor. or paynents Far att .I:.:Il:j:l ,..- ^-.^--r- du" ti sru"qr*t", r"ft;il#'ffi#Ji#;;ffii;;H"* from rhe owoer by ihj conracror is 3*,1"e.}r..:^ofl: ?iracrgr is:coylon a "o;t,t;; n ;;;;;;;-";;ld;;;il ""J"nii"""v the conrr8ctorro i ,nakc payrDeat ro dE subcontsaaor- The Subconlactor sr*oiir,.J" "ire"*" n-otr"i* "f asarcsuirorrunds;.it;;;;rd"il;;',:H[:T'HLH""J";',fl T,ffi,]i*""ff "guin.t r * clur. sas' additions, deretions' and/or {ry amcndments effecting the scope, msgnitude 8nd/or of fie labor ro be pcrformed and/or mrreriars to be. suppli.J .irirff,ll co., t*iu.n changc ordcr onry b{ bo'dt panies sctting forrh, :iqg to this subconrracr, In rhc cvcnt the T Ftait the ctranges ,aaiiiin., d"r.tions and/or uncndmcnts subcontractor's frrformai"" or intcrfcmd with by acts ofthc owner, conr""tor oi ort .uu"on-,.",oo, "ii*riru"""t ""i il;i;;'- ,t . Subconirscror 3hall not b€ cntirlcd o an incneasc in thc subcofltract nil""", or to J"rigu, or addiriooEl compcnsation es a consequcncc of such.delays or interfercr*, amounts lhat thc Contractor may, on b€halfofthe Subcontracor, .;6;?;i; ;;;;";"y aciually rccovcr or bc grantcd from the Owner for such dehys. Received 1/22/2024 ROC Legal
Ifat_any tirne is shall appear that there is any_lien or any other claim or demand ofany * harsoever for whieh contractor, orr,ner oirt R.j."rr"jl kind t'iite or so treu. and for which conrracror or Subcontsaaor is ctrarg€abtc, b" discharged *aai,ror""a, " Subcil;;;;il#J;;t ;;;i#hiH:, :plT.'-,: out fid"nd ot any money "nle;;;#ffi;i;ii*[ari,,#",i,,*iirr,.", due, or to become due, to Subcontracto, ff,,,ro,rirf ,".arsary to satisfr such lienc claim unril such time as Suu"or"""i* r,r"-"r,i"Jrr"i iir"li be paid and discharged and is solved or Conractor may "r*, " make paymeni oiruJ iLo o, made jointly to Subcontractor and such claimant- '' "frim by payment
16' l'lqndisclosurc' In connection with this A-greemenq contractot may have disctosed lnformation. subcontractor-a€:ees that c-ontractoi's confidcntial strictest confidence and sharl ti prot"ct"a uy c*iio"ntirr Information shalr bc kepr in iuutil;;; subcontracror sha, not r€terse, disctose or divulge in any fashion, form "r#r*r, ;, C.;;;e.mf fnform"tion to ;ilil-rrr$, 17. Aoolicable [.aw. This Subcontract.shal be govemed by the laws of &e state in which work is to be performed, notwithstanding choice of f"Jpfncipf"rl
HMW Construcfion, LLC SUBCONTRACTOK
Its: ,trl"{-f
Scanned with CamScanner 0121034ÿ60733ÿ89 ÿÿ ÿ9 ÿÿ 7ÿ ÿ00326ÿÿ8 Received ÿ Legal 3456ÿ89402/06/2024 :;5;ÿ<=456>?94:;5;@ABC>;:>DBEF
G4 HÿI;J4ÿKLKMNLLOPQÿNÿRBSNT;UV4S=ÿIBVWX;6S= 6ÿ " YZ[ÿIBSJ=A9C=6BSÿ\\Iÿ]&."#$# ^" !#_ `$ 4ÿa (ÿ24ÿ003ÿ ÿ6070ÿ89 `7ÿ̀ .ÿb$ . ÿ] .!c$ . ^#!!",_
711 !""!#1 1$11%&'()#*#2#06+,-'+ #' + .' .7))6*/0)0260622*1/"76/*6/*6/*0*62 61) 0121034ÿ60733ÿ89 ÿÿ ÿ9 ÿÿ 7ÿ ÿ00326ÿÿ8 Received ÿ Legal 02/06/2024
711 !""!#1 1$11%&'()#*#2#06+,-'+ #' + .' .7))6*/0)0260622*1/"76/*6/*6/*0*62 01) 0121034ÿ60733ÿ89 ÿÿ ÿ9 ÿÿ 7ÿ ÿ00326ÿÿ8 Received ÿ Legal ,ÿ9 & 02/06/2024 3+4ÿ$# ))/)002 5ÿ6$ 4ÿ7 (ÿ24ÿ003ÿ ÿ6670)89ÿ6.ÿ9$ . ÿ: .!;$ . <#!!",=ÿ- 7 > 4 ÿ,$ÿ$ .ÿÿ?$ ÿ6*4ÿ0034ÿ ÿ#ÿÿ# ÿ#4ÿ .ÿÿ. . ÿÿ,. ÿ# ÿ.#$ ÿÿ ÿ ÿ?$ ÿ0*4ÿ003!ÿ@$ÿ , ÿ,. .ÿÿÿÿ ÿ#! 5ÿ?$ ÿ004ÿ0034ÿ ÿ "ÿ#,.ÿÿÿÿ>9Aÿ$#ÿBBÿC . D4ÿ"ÿ ,"ÿ . ÿ ÿÿ$ÿÿ ÿ$ ."ÿ,#!ÿ 5ÿ?$ ÿ024ÿ0034ÿEÿ#.ÿÿ#ÿÿ$ÿ ÿ ÿ ÿ$( ÿ .ÿÿ#.4ÿC))Dÿ/)0024ÿ ,"ÿÿ,#ÿ " ÿ;$ "ÿ# ÿÿ#ÿÿ ÿ . 4ÿ,."ÿÿ.#ÿ ÿ$( ÿÿ $ÿÿ#! ÿÿ ÿ. 4ÿ ÿ ÿ( ÿÿ#$# ÿÿ$ÿ" ."ÿ$ÿ ÿ#!ÿ@$ÿ-ÿ ,ÿ$ÿ6 $. 4ÿ7 ($ ÿ4ÿ0034ÿÿ# #ÿ " ."ÿ$ÿ#!ÿ7 $ÿÿ#$# ÿ-ÿ ÿ-ÿ$ÿÿ ÿ#ÿ( "ÿ#.! FGHIJÿLMN OXYPZ[Q\Rÿ^_ ÿTU PVWQW _`_a[baÿcc XYZ[\ÿdYe[fagYba ^fh̀ib[ÿjYZ`_af[fÿikÿlibaf[maif_ n[b̀oÿpqrsturvwtrt xg[`\oÿXYZ[\bYyg[`\zfims[hsZi{ ÿ5ÿÿ-ÿÿ#ÿ .| &ÿ$ÿÿ-ÿ$ÿ7
ÿ }`\\ÿi~aÿ^ÿjl_ÿ_~f{Yÿaiÿ\Yaÿ~_ÿbiyÿiyÿyYfYÿib̀Zÿ[b ÿiyÿyYÿm[bÿYaaYfÿ_Yf{Yÿi~
711 !""!#1 1$11%&'()#*#2#06+,-'+ #' + .' .7))6*/0)0260622*1/"76/*6/*6/*0*62 )1) 0121034ÿ66789ÿ ÿÿÿ ÿÿÿ003296ÿÿÿ 2345ÿ7839:4:ÿ;<345=>839:4:?@AB=:9=CADE
F: G3ÿHIHJKIILMNÿKÿOAPKQ:RS3P<ÿFASTU:5P< 6ÿ" 2345ÿ7839:4:ÿV.!W$.X#!!",Y Z$4ÿ[(ÿ24ÿ003ÿÿ66780ÿ Z7ÿ&."#$#X"!# \4 ÿ,$ÿ$.ÿÿ]$ÿ6*4ÿ0034ÿ ÿ#ÿÿ#ÿ#4ÿ.ÿÿ..ÿÿ,.ÿ#ÿ.#$ÿÿÿ ÿ]$ÿ0*4ÿ003!ÿ^$ÿ, ÿ,..ÿÿÿÿ ÿ#! _ÿ]$ÿ004ÿ0034ÿ ÿ̀"ÿ#,.ÿÿÿÿ\ aÿ$#ÿbbÿc`.d4ÿ"ÿ,"ÿ.ÿÿÿ$ÿÿ ÿ$."ÿ,#!ÿ _ÿ]$ÿ024ÿ0034ÿeÿ#.ÿÿ#ÿÿ$ÿÿ ÿ ÿ$(ÿ.ÿÿ#.4ÿc))dÿ9/)0824ÿ,"ÿÿ,#ÿ"ÿW$"ÿ#ÿÿ#ÿÿ ÿ̀.4ÿ,."ÿÿ.#ÿ ÿ$(ÿÿ$ÿÿ#! ÿÿ ÿ.4ÿ ÿÿ(ÿÿ#$#ÿÿ$ÿ"."ÿ$ÿÿ#!ÿ^$ÿ-ÿ,ÿ$ÿZ $.4ÿ[($ÿ94ÿ0034ÿÿ##ÿ "."ÿ$ÿ#!ÿ[$ÿÿ#$#ÿ-ÿÿ-ÿ$ÿÿ ÿ#ÿ("ÿ#.! fghijÿlmn opqrÿtupvwqw x3C:UÿyGG5G<:P<ÿzz x3C:Uÿ{3T:@<S3P< y@59AP:ÿ|3C5G<@:@ÿA}ÿFAP<@:B<A@G ~:5PÿLIH=JHKNH S:5Uÿx3C:UP3S:5U?@AB=:9=CAD Z ÿ̀_ÿÿ-ÿÿ#ÿ. &ÿ$ÿÿ-ÿ$ÿ7
ÿ 5UUÿA8<ÿy ÿ|FGÿG8@D3Rÿ<AÿU3<ÿ8GÿPAÿAÿ3@3ÿ4A5PCÿ:P4ÿAÿ3ÿB:Pÿ3<<3@ÿG3@D3ÿRA8
HIHJINHHÿ|3GTAPG3ÿ}@ASÿ|3GTAP43P<ÿHIHJKIILMN=T4} 9)//
711!""!#11$11%&'()#*#2#069+,-'+#'+ .' .7)9)6*/0)82686922*0/"7/0883)9/8969/1 616 0121034ÿ2673ÿ89 ÿÿ8 ÿ9 ÿÿ ÿ0703772ÿÿ ÿ Received Legal 02/07/2024 2345ÿ7839:4:ÿ;<345=>839:4:?@AB=:9=CADE
F: G 3ÿ H ÿ ! IHJK IILMNÿ Kÿ OAPK Q:RS3P< ÿFASTU :5P< VWXÿFAPG<@8B<5APÿYYFÿZ%-!"#" [! "\ ] -4ÿ^ 'ÿ.4ÿ0703ÿ ÿ7670ÿ9 _6ÿ_-ÿ̀# - ÿZ -a# - [" !+\ bÿ_-4ÿ " -ÿÿ ÿ+"ÿ! ÿ,ÿb9]ÿ-ÿ"!ÿ" ÿÿb9] ÿ ÿ#ÿ ÿ"+ 4ÿÿ"ÿÿÿÿ ÿ8ÿ ÿÿÿ ÿ" "%ÿ,4ÿb,ÿ--ÿ-ÿ ÿ ÿÿ ÿ ÿ-# ÿ+"4ÿ'#ÿÿ""ÿ#ÿÿ ÿ+" ÿ] ÿ--cÿ"+ÿÿ ÿ ÿÿ!ÿ"4ÿ'# --ÿÿ ÿ_ ÿÿÿÿ ÿ-"ÿÿd((4..20)ÿÿ' "ÿ, -ÿ ÿ ÿ! 4ÿb9]ÿ,#-ÿ ÿ# ÿÿ, ÿ"ÿÿ' ÿ -ÿÿ.ÿ- ÿ+ÿ3ÿ- ÿÿ(7ÿ- ÿ] ÿ"ÿ.ÿ- ÿ+ÿ ÿÿ"ÿ' ÿ ÿÿ# +"ÿ"!ÿ] ÿ, ÿ +ÿ -ÿÿ.ÿ- 4ÿ ÿ, ÿ#-ÿ +ÿ' ÿ" -ÿÿ 4ÿ ÿ ÿ! 4 "ÿÿ, cÿ -ÿÿ.ÿ- ÿ84ÿ+ÿ ÿ, ÿ, ÿ -4ÿ, ÿ, ÿÿ ÿ+"-ÿ# ÿÿ - -ÿ# ÿ ÿ+" ÿ -ÿÿ' ÿ ÿ-ÿÿ#ÿÿ/ÿÿ7ÿÿ/0ÿ4ÿe#ÿ -ÿÿ' ÿ, + ,%-ÿÿ ÿ ÿÿb,ÿ ÿ 611,,,"" "1 1$ "f-&9b!g_%7g_^g9*-&0..3(^7)3h83.^i72jk.!.l * -&-*&*&.7.(.2.)* f ! f&7* f+&/)7* ÿÿ ÿ%,ÿÿ ÿÿ# ÿa# ÿmÿ"ÿ, ÿÿ ÿ, _ % i +ÿ
611 !!"1 1#171$%&'(")""02*+,&* "& * -& -6.)7(7/.0(.../30//)0.!6.)7(7/.0(.../30//)1 1 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 February 8, 2024
Via U.S. Mail and Email
Complainant K&G Construction LLC 1578 N Tucana Ct Gilbert, AZ 85234
Via U.S. Mail and Email
Respondent HMW Construction LLC 4225 S 80th St Omaha, NE 68127
HMW Construction LLC 7887 F St Omaha, NE 68127
Re: Complaint No. 2024-00681
Dear Complainant and Respondent:
The Registrar received a complaint filed against HMW Construction LLC for non- payment of materials or services rendered. This complaint is complete and will be substantively reviewed by the Registrar.
Respondent is free to raise any issue or affirmative defense to this complaint by filing a response with the Registrar by February 15, 2024. Please reference the complaint number listed above if you file a response. Respondent may file a response by:
Mail: P.O. Box 18244, Phoenix, Arizona, 85005-8244 In-Person: 1700 W. Washington St., Ste. 105, Phoenix, Arizona, 85007-2812 Email: [email redacted]
The Registrar will not issue a citation before February 15, 2024 and will review Respondent’s response, if one is submitted.
Please be advised that a response to the complaint is not the same as a written answer. If the Registrar issues a citation Respondent must file a written answer to that citation in accordance with A.R.S. § 32-1155.
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg100 4/21 Sincerely,
/s/ Tedi Quezada _______________ Tedi Quezada Legal Department 1700 W Washington St. Ste. 105 Phoenix, AZ 85007
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg100 4/21 0121034ÿ60733ÿ89 ÿÿ ÿ9 ÿÿ 7ÿ ÿ00326ÿÿ8 Received ÿ Legal 3456ÿ89402/06/2024 :;5;ÿ<=456>?94:;5;@ABC>;:>DBEF
G4 HÿI;J4ÿKLKMNLLOPQÿNÿRBSNT;UV4S=ÿIBVWX;6S= 6ÿ " YZ[ÿIBSJ=A9C=6BSÿ\\Iÿ]&."#$# ^" !#_ `$ 4ÿa (ÿ24ÿ003ÿ ÿ6070ÿ89 `7ÿ̀ .ÿb$ . ÿ] .!c$ . ^#!!",_
711 !""!#1 1$11%&'()#*#2#06+,-'+ #' + .' .7))6*/0)0260622*1/"76/*6/*6/*0*62 61) 0121034ÿ60733ÿ89 ÿÿ ÿ9 ÿÿ 7ÿ ÿ00326ÿÿ8 Received ÿ Legal 02/06/2024
711 !""!#1 1$11%&'()#*#2#06+,-'+ #' + .' .7))6*/0)0260622*1/"76/*6/*6/*0*62 01) 0121034ÿ60733ÿ89 ÿÿ ÿ9 ÿÿ 7ÿ ÿ00326ÿÿ8 Received ÿ Legal ,ÿ9 & 02/06/2024 3+4ÿ$# ))/)002 5ÿ6$ 4ÿ7 (ÿ24ÿ003ÿ ÿ6670)89ÿ6.ÿ9$ . ÿ: .!;$ . <#!!",=ÿ- 7 > 4 ÿ,$ÿ$ .ÿÿ?$ ÿ6*4ÿ0034ÿ ÿ#ÿÿ# ÿ#4ÿ .ÿÿ. . ÿÿ,. ÿ# ÿ.#$ ÿÿ ÿ ÿ?$ ÿ0*4ÿ003!ÿ@$ÿ , ÿ,. .ÿÿÿÿ ÿ#! 5ÿ?$ ÿ004ÿ0034ÿ ÿ "ÿ#,.ÿÿÿÿ>9Aÿ$#ÿBBÿC . D4ÿ"ÿ ,"ÿ . ÿ ÿÿ$ÿÿ ÿ$ ."ÿ,#!ÿ 5ÿ?$ ÿ024ÿ0034ÿEÿ#.ÿÿ#ÿÿ$ÿ ÿ ÿ ÿ$( ÿ .ÿÿ#.4ÿC))Dÿ/)0024ÿ ,"ÿÿ,#ÿ " ÿ;$ "ÿ# ÿÿ#ÿÿ ÿ . 4ÿ,."ÿÿ.#ÿ ÿ$( ÿÿ $ÿÿ#! ÿÿ ÿ. 4ÿ ÿ ÿ( ÿÿ#$# ÿÿ$ÿ" ."ÿ$ÿ ÿ#!ÿ@$ÿ-ÿ ,ÿ$ÿ6 $. 4ÿ7 ($ ÿ4ÿ0034ÿÿ# #ÿ " ."ÿ$ÿ#!ÿ7 $ÿÿ#$# ÿ-ÿ ÿ-ÿ$ÿÿ ÿ#ÿ( "ÿ#.! FGHIJÿLMN OXYPZ[Q\Rÿ^_ ÿTU PVWQW _`_a[baÿcc XYZ[\ÿdYe[fagYba ^fh̀ib[ÿjYZ`_af[fÿikÿlibaf[maif_ n[b̀oÿpqrsturvwtrt xg[`\oÿXYZ[\bYyg[`\zfims[hsZi{ ÿ5ÿÿ-ÿÿ#ÿ .| &ÿ$ÿÿ-ÿ$ÿ7
ÿ }`\\ÿi~aÿ^ÿjl_ÿ_~f{Yÿaiÿ\Yaÿ~_ÿbiyÿiyÿyYfYÿib̀Zÿ[b ÿiyÿyYÿm[bÿYaaYfÿ_Yf{Yÿi~
711 !""!#1 1$11%&'()#*#2#06+,-'+ #' + .' .7))6*/0)0260622*1/"76/*6/*6/*0*62 )1) January 19, 2024
Via U.S. Mail and Email
Complainant K&G Construction LLC 1578 N Tucana Ct Gilbert, AZ 85234
Via U.S. Mail and Email
Respondent HMW Construction LLC 4225 S 80th St Omaha, NE 68127
HMW Construction LLC 7887 F St. Omaha, NE 68127
Re: Complaint No. 2024-00681
Dear Complainant and Respondent:
The Registrar received a complaint filed against HMW Construction LLC for non- payment of materials or services rendered. This complaint is incomplete and will not be substantively reviewed by the Registrar until the following documentation is provided: 1. As indicated on the Non-Payment Complaint Form Instructions & Checklist, provide a copy of the original construction contract signed (by both parties). If no written contract, provide a written statement describing the agreement that includes the following information: • The reason a written contract is not being provided. • A description of the work to be performed under the contract. • The names of the people who negotiated the contract. • The agreed upon payment schedule. • An explanation of who was to receive payment. • The date the work was to be completed.
Please provide ALL requested information by January 29, 2024. The Registrar will close this complaint (as incomplete) without further written notice if you fail to provide the requested documentation by such date.
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg100a 11/23 Documents can be submitted by:
Mail: P.O. Box 18244, Phoenix, Arizona, 85005-8244 In-Person: 1700 W. Washington St., Ste. 105, Phoenix, Arizona, 85007-2812 Email: [email redacted]
Although the complaint is incomplete at this time, Respondent may file a response with the Registrar raising any issues or affirmative defenses to the complaint.
If the required information is provided and this complaint becomes complete, Respondent will be provided an additional opportunity to respond to the complaint.
Sincerely,
/s/ Tedi Quezada ________________ Tedi Quezada Legal Department 1700 W Washington St. Ste. 105 Phoenix, AZ 85007
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg100a 11/23 Non-Payment Complaint Form Departmental Use Only Complaint Number: Mail to: Registrar of Contractors P.O. Box 18243 Phoenix, AZ 85005-8243
Person Filing Complaint (Payee) Business Name Full Name (First Middle Last) ROC License Number(s) (if any) Kevin Thomas Matzke Street Address City State Zip Code 1578 N Tucana Ct Gilbert Arizona 85234 Phone Number Email Address [number redacted] [email redacted] I consent to receive communications electronically in connection with this case
Name of Attorney (if any)
Attorney’s Street Address City State Zip Code
Attorney’s Phone Number Attorney’s Email Address
Licensee Information (Payer) Name (as shown on contracts, invoices, etc.) ROC License Number(s) HMW Construction LLC ROC 328765 Street Address City State Zip Code 4225 S 80th St Omaha NE 68127 Phone Number Email Address
Name of Person(s) Representing License Hank Doss Complaint Information Principal Amount Due (excluding interest and fees) Contract Date (if applicable) $62,992.28 September 18, 2023 Have you filed a civil complaint? No List all specific invoices which have not been paid. Attach additional pages if necessary. 1149, 1146, 1145, 1143, 1142, 1140
Certification I certify, upon information and belief, that the above-named licensee has failed to pay monies in excess of seven hundred fifty dollars when due for materials or services rendered in connection with the licensee’s operations as a contractor. I further certify, upon information and belief, that the above-named licensee has the capacity to pay, or has received sufficient monies as payment for the particular construction work project or operation for which the services or materials were rendered or purchased. A.R.S. § 32-1154(A)(10). Printed Name Signature Date Kevin Thomas Matzke Declaration & Signature I am the Complainant in this Complaint Form or Complainant’s duly authorized representative. I declare under penalty of perjury that the information contained in this Form is true and correct to the best of my knowledge. I further certify that any documents submitted in support of this complaint are true and correct copies of the originals and are accurate to the best of my knowledge. I will assist in the investigation or in the prosecution of the contractor or other parties, and will, if necessary, attend hearings and testify to facts. Printed Name Signature Date Kevin Thomas Matzke INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to HMW Construction 129 East Pima Street Phoenix, AZ 85004
Invoice details Invoice no.: 1140 Terms: Due on receipt Invoice date: 09/18/2023 Due date: 09/25/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 LUMEN Project P.032287
2. 09/19/2023 Drilling/Bore $10.50 $1,365.00 Bore Single Pipe-7 day pay
P-68 to corner of 7251 E Navarro Ave, to cross to North side of street and north on Terripin Circle. 130ft total 3 pipes
3. 09/19/2023 Bore-Additional Pipe 7 Day 130 $1.125 $146.25 Bore-Additional Pipe-7 day pay
P-68 to corner of 7251 E Navarro Ave, to cross to North side of street and north on Terripin Circle. 130ft total 3 pipes
4. 09/19/2023 Bore-Additional Pipe 7 Day 130 $1.125 $146.25 Bore-Additional Pipe-7 day pay
P-68 to corner of 7251 E Navarro Ave, to cross to North side of street and north on Terripin Circle. 130ft total 3 pipes
5. 09/20/2023 Drilling/Bore $10.50 $1,942.50 Bore Single Pipe-7 day pay
P-13 South, crossing E Navarro Ave to splice pipes from P-68. Total 185ft, 3 Pipes
6. 09/20/2023 Bore-Additional Pipe 7 Day 185 $1.125 $208.13 Bore-Additional Pipe-7 day pay
P-13 South, crossing E Navarro Ave to splice pipes from P-68. Total 185ft, 3 Pipes 7. 09/20/2023 Bore-Additional Pipe 7 Day 185 $1.125 $208.13 Bore-Additional Pipe-7 day pay
P-13 South, crossing E Navarro Ave to splice pipes from P-68. Total 185ft, 3 Pipes
8. 09/20/2023 Existing Facility 4 $31.80 $127.20 Dig and Expose Existing Facility-Per Cubic Yard
2637 S Terripin Circle 2649 S Terripin Cirlce
9. 09/21/2023 Drilling/Bore $10.50 $903.00 Bore Single Pipe-7 day pay
S-102 South to splice with pipes from P-67. West side of 72nd Circle. Total 86 ft, 2 pipes
10. 09/21/2023 Bore-Additional Pipe 7 Day 86 $1.125 $96.75 Bore-Additional Pipe-7 day pay
S-102 South to splice with pipes from P-67. Total 86 ft, 2 pipes
11. 09/21/2023 Existing Facility 2 $31.80 $63.60 Dig and Expose Existing Facility-Per Cubic Yard
2654 S 72nd Circle
12. 09/22/2023 Drilling/Bore $10.50 $6,825.00 Bore Single Pipe-7 day pay
72nd Street from E Madero Ave to E Monte Ave, East side of 72nd St. 650ft, 1 pipe
13. 09/22/2023 Drilling/Bore $10.50 $1,701.00 Bore Single Pipe-7 day pay
2654 S 72nd Circle to P-12. West side of 72nd Circle. 162ft total, 2 pipes
14. 09/22/2023 Bore-Additional Pipe 7 Day 162 $1.125 $182.25 Bore-Additional Pipe-7 day pay
2654 S 72nd Circle to P-12. West side of 72nd Circle. 162ft total, 2 pipes
15. 09/22/2023 Existing Facility 4 $31.80 $127.20 Dig and Expose Existing Facility-Per Cubic Yard
2646 S 72nd Circle 2638 S 72nd Circle
16. Hydro- Vac Dump 7 $100.00 $700.00 Hydro-Vac Dump Charge
17. $0.00 ACH ON 10/10/23 FOR 13496.55
Total $14,742.26 Cash, Zelle or Approved Check excepted for payment
Payment -$9,757.49 Balance due $4,984.77
Overdue 09/25/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to HMW Construction 129 East Pima Street Phoenix, AZ 85004
Invoice details Invoice no.: 1142 Terms: Due on receipt Invoice date: 10/02/2023 Due date: 10/09/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 Project P.032287 Lumen
2. Drilling/Bore $10.50 $3,318.00 Bore Single Pipe-7 day pay
7445 E Nopal Ave, P-42 to P-74 @7505 E Nopal Ave. 316ft, 4 pipes total
3. Bore-Additional Pipe 7 Day 316 $1.125 $355.50 Bore-Additional Pipe-7 day pay
7445 E Nopal Ave, P-42 to P-74 @7505 E Nopal Ave. 316ft, 4 pipes total
4. Bore-Additional Pipe 7 Day 315 $1.125 $354.38 Bore-Additional Pipe-7 day pay
7445 E Nopal Ave, P-42 to P-74 @7505 E Nopal Ave. 316ft, 4 pipes total
5. Bore-Additional Pipe 7 Day 316 $1.125 $355.50 Bore-Additional Pipe-7 day pay
7445 E Nopal Ave, P-42 to P-74 @7505 E Nopal Ave. 316ft, 4 pipes total
6. Existing Facility 6 $31.80 $190.80 Dig and Expose Existing Facility-Per Cubic Yard
7449 E Nopal Ave 7457 E Nopal Ave 7461 E Nopal Ave 7. Asphalt 4 $7.313 $29.25 Asphalt-Temperary Cold Patch-Per Square Foot
8. Drilling/Bore $10.50 $4,147.50 Bore Single Pipe-7 day pay
P42 to corner of S Raven and E Nopal Ave. 2 Pipes. Total ft 395. 1-395, 2-215
9. Bore-Additional Pipe 7 Day 215 $1.125 $241.88 Bore-Additional Pipe-7 day pay
P42 to corner of S Raven and E Nopal Ave. 2 Pipes. Total ft 395. 1-395, 2-215
10. Asphalt 2 $7.313 $14.63 Asphalt-Temperary Cold Patch-Per Square Foot
11. Pedestal-Medium 1 $24.33 $24.33 Pedestal-Medium RMV-Per Unit 7 Day
12. Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium-Per Unit 7 Day
13. Existing Facility 6 $31.80 $190.80 Dig and Expose Existing Facility-Per Cubic Yard
7437 E Nopal Ave 7425 E Nopal Ave 7415 E Nopal Ave
14. 10/05/2023 Drilling/Bore $10.50 $4,431.00 Bore Single Pipe-7 day pay
P-58 to P-36 and past in preparation to cross street east 422ft total, 1-422, 2-280
15. 10/05/2023 Bore-Additional Pipe 7 Day 280 $1.125 $315.00 Bore-Additional Pipe-7 day pay
P-58 to Connection @ S Raven and E Nopal Ave 280 ft total
16. 10/05/2023 Asphalt 6 $7.313 $43.88 Asphalt-Temporary Cold Patch-Per Square Foot
17. 10/05/2023 Existing Facility 10 $31.80 $318.00 Dig and Expose Existing Facility-Per Cubic Yard
2748 S Raven 2744 S Raven 2738 S Raven 2724 S Raven 2710 S Raven
18. 10/06/2023 Drilling/Bore $10.50 $1,785.00 Bore Single Pipe-7 day pay
7446 E Naranja 170 ft total, 2 pipes 19. 10/06/2023 Bore-Additional Pipe 7 Day 170 $1.125 $191.25 Bore-Additional Pipe-7 day pay
7446 E Naranja Ave
20. 10/06/2023 Asphalt 11.5 $7.313 $84.10 Asphalt-Temperary Cold Patch-Per Square Foot
21. 10/06/2023 Existing Facility 8 $31.80 $254.40 Dig and Expose Existing Facility-Per Cubic Yard
7446 E Naranja Ave 7438 E Naranja Ave 7426 E Naranja Ave 7416 E Naranja Ave
22. Pedestal-Medium 2 $28.612 $57.22 Pedestal-Medium-Per Unit 7 Day
23. Pedestal-Medium 2 $24.33 $48.66 Pedestal-Medium RMV-Per Unit 7 Day
24. Hydro- Vac Dump 11 $100.00 $1,100.00 Hydro-Vac Dump Charge
25. $0.00 ACH ON 10/23/23 FOR 14913.68
26. $0.00 975.30 ACH CREDITED FROM 10/16/23 ACH PAYMENT ON INVOICE 1141
Total $17,879.69 Cash, Zelle or Approved Check excepted for payment
Payment -$15,888.98
Balance due $1,990.71
Overdue 10/09/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to HMW Construction 129 East Pima Street Phoenix, AZ 85004
Invoice details Invoice no.: 1143 Terms: Due on receipt Invoice date: 10/09/2023 Due date: 10/16/2023
# Date Product or service SKU Qty Rate Amount
1. 10/09/2023 Drilling/Bore 280 $10.50 $2,940.00 Bore Single Pipe-7 day pay
7438 E Naranja Ave to 2753 S Raven. 280ft total, 2 Pipes
2. 10/09/2023 Bore-Additional Pipe 7 Day 280 $1.13 $316.40 Bore-Additional Pipe-7 day pay
7438 E Naranja Ave to 2753 S Raven. 280ft total, 2 Pipes
3. 10/09/2023 Asphalt 8 $7.31 $58.48 Asphalt-Temperary Cold Patch-Per Square Foot
4. Drilling/Bore 444 $10.50 $4,662.00 Bore Single Pipe-7 day pay
P73-P40. 444ft total, 1 Pipe
5. 10/10/2023 Existing Facility 10 $31.80 $318.00 Dig and Expose Existing Facility-Per Cubic Yard
7462 E Naranja Ave 7506 E Naranja Ave 7510 E Naranja Ave 7514 E Naranja Ave 7518 E Naranja Ave
6. Asphalt 5 $7.31 $36.55 Asphalt-Temperary Cold Patch-Per Square Foot 7. Pedestal-Medium 1 $28.61 $28.61 Pedestal-Medium-Per Unit 7 Day
8. Pedestal-Medium 1 $24.33 $24.33 Pedestal-Medium RMV-Per Unit 7 Day
9. 10/11/2023 Drilling/Bore 905 $10.50 $9,502.50 Bore Single Pipe-7 day pay
P-51 to 7422 E Navarro Ave. 905ft total, 2 Pipes
10. 10/11/2023 Bore-Additional Pipe 7 Day 260 $1.125 $292.50 Bore-Additional Pipe-7 Day Pay
P-51 to 7422 E Navarro Ave. 905ft total, 2 Pipes
11. 10/11/2023 Existing Facility 16 $31.80 $508.80 Dig and Expose Existing Facility-Per Cubic Yard
7518 E Navarro Ave 7512 E Navarro Ave 7502 E Navarro Ave 7460 E Navarro Ave 7442 E Navarro Ave 7432 E Navarro Ave 7428 E Navarro Ave 7422 E Navarro Ave
12. 10/11/2023 Asphalt 12 $7.313 $87.76 Asphalt-Temperary Cold Patch-Per Square Foot
13. 10/12/2023 Drilling/Bore 465 $10.50 $4,882.50 Bore Single Pipe7 day pay 465ft total
P-52 to P-51. 2 Pipe 465ft. P-49 to connection @ 2650 S Raven. 1 Pipe 165ft
14. 10/12/2023 Bore-Additional Pipe 7 Day 300 $1.125 $337.50 Bore-Additional Pipe-7 Day Pay
P-52 to P-51. 2 Pipe 465ft. P-49 to connection @ 2650 S Raven. 1 Pipe 165ft
15. Existing Facility 4 $31.80 $127.20 Dig and Expose Existing Facility-Per Cubic Yard
7413 E Navarro Ave 7452 E Navarro Ave
16. 10/12/2023 Asphalt 42 $7.313 $307.15 Asphalt-Temperary Cold Patch-Per Square Foot
17. 10/13/2023 Drilling/Bore 75 $10.50 $787.50 Bore Single Pipe-7 Day Pay
7422 E Navarro Ave crossing street to 7421 E Navarro Ave. Total 75 ft, 2 pipes 18. Drilling/Bore $10.50 $787.50 Bore Single Pipe-7 Day Pay
7422 E Navarro Ave crossing street to 7421 E Navarro Ave. Total 75 ft, 2 pipes
19. Hydro- Vac Dump 11 $100.00 $1,100.00 Hydro-Vac Dump Charge
20. Asphalt 24 $7.313 $175.51 Asphalt-Temporary Cold Patch-Per Square Foot
21. Pedestal-Medium 4 $24.33 $97.32 Pedestal-Medium RMV-Per Unit 7 Day
22. Pedestal-Medium 4 $28.612 $114.45 Pedestal-Medium-Per Unit 7 Day
23. $0.00 ACH 11/1/23 FOR 25,075.98
Total $27,492.56 Cash, Zelle or Approved Check excepted for payment
Payment -$25,075.98
Balance due $2,416.58
Overdue 10/16/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to Ship to HMW Construction HMW Construction 129 East Pima Street 129 East Pima Street Phoenix, AZ 85004 Phoenix, AZ 85004
Invoice details Invoice no.: 1145 Terms: Due on receipt Invoice date: 10/22/2023 Due date: 10/22/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 P.032287
2. 10/20/2023 Drilling/Bore $10.50 $8,893.50 Bore Single Pipe-7 day pay
7442 E Nido Ave to P63/ End of Street. 2 Pipes, 847ft total. 1-847ft/1-197ft
3. 10/20/2023 Bore-Additional Pipe 7 Day 197 $1.125 $221.63 Bore-Additional Pipe-7 day pay
7442 E Nido Ave to P63/ End of Street. 2 Pipes, 847ft total. 1-847ft/1-197ft
4. 10/20/2023 Asphalt 36 $7.313 $263.27 Asphalt-Temperary Cold Patch-Per Square Foot
5. 10/20/2023 Existing Facility 22 $31.80 $699.60 Dig and Expose Existing Facility-Per Cubic Yard
7446 E Nido Ave 7456 E Nido Ave 7462 E Nido Ave 7466 E Nido Ave 7510 E Nido Ave 7514 E Nido Ave 7526 E Nido Ave 7532 E Nido Ave 7542 E Nido Ave 7546 E Nido Ave 6. 10/20/2023 Hydro- Vac Dump 14 $100.00 $1,400.00 Hydro-Vac Dump Charge
7. 10/20/2023 Cut Concrete 14 $4.335 $60.69 Concrete RMV Per Sq Ft 7 Day Pay
8. 10/20/2023 Pedestal-Medium 1 $24.33 $24.33 Pedestal-Medium RMV-Per Unit 7 Day
9. 10/20/2023 Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium-Per Unit 7 Day
10. 10/17/2023 Asphalt 14 $7.313 $102.38 Asphalt-Temperary Cold Patch-Per Square Foot
11. 10/17/2023 Drilling/Bore $10.50 $5,932.50 Bore Single Pipe-7 day pay
P50 2662 S Raven to P53 2628 S Raven. 565ft total, 3 Pipes. 1-565/1-180/1-76
12. 10/17/2023 Bore-Additional Pipe 7 Day 180 $1.125 $202.50 Bore-Additional Pipe-7 day pay
P50 2662 S Raven to P53 2628 S Raven. 565ft total, 3 Pipes. 1-565/1-180/1-76
13. 10/17/2023 Bore-Additional Pipe 7 Day 76 $1.125 $85.50 Bore-Additional Pipe-7 day pay
P50 2662 S Raven to P53 2628 S Raven. 565ft total, 3 Pipes. 1-565/1-180/1-76
14. 10/17/2023 Existing Facility 14 $31.80 $445.20 Dig and Expose Existing Facility-Per Cubic Yard
2650 S Raven 2644 S Raven 2534 S Raven 2620 S Raven 2616 S Raven 2610 S Raven
15. 10/17/2023 Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium-Per Unit 7 Day P50
16. 10/17/2023 Pedestal-Medium 1 $24.33 $24.33 Pedestal-Medium RMV-Per Unit 7 Day P50
17. 10/17/2023 Cut Concrete 6 $4.335 $26.01 Concrete RMV Per Sq Ft 7 Day Pay
Total $18,438.66 Cash, Zelle or Approved Check excepted for payment
Payment -$14,913.68
Balance due $3,524.98 Overdue 10/22/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to Ship to HMW Construction HMW Construction 129 East Pima Street 129 East Pima Street Phoenix, AZ 85004 Phoenix, AZ 85004
Invoice details Invoice no.: 1146 Terms: Due on receipt Invoice date: 10/23/2023 Due date: 10/27/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 P.0032289
2. 10/27/2023 Drilling/Bore $10.50 $9,639.00 Bore Single Pipe-7 day pay
P60-P63 total 918ft. 1-918/2-208
3. 10/27/2023 Bore-Additional Pipe 7 Day 208 $1.125 $234.00 Bore-Additional Pipe
P60-P63 total 918ft. 1-918/2-208
4. 10/27/2023 Hydro- Vac Dump 13 $100.00 $1,300.00 Hydro-Vac Dump Charge
5. 10/27/2023 Existing Facility 18 $31.80 $572.40 Dig and Expose Existing Facility-Per Cubic Yard
7446 E Nido Ave 7450 E Nido Ave 7456 E Nido Ave 7466 E Nido Ave 7504 E Nido Ave 7510 E Nido Ave 7520 E Nido Ave 7538 E Nido Ave 7542 E Nido Ave 6. 10/27/2023 Asphalt 49 $7.313 $358.34 Asphalt-Temporary Cold Patch-Per Square Foot
7. 10/27/2023 Pedestal-Medium 8 $28.612 $228.90 Pedestal-Medium-Per Unit 7 Day
8. 10/27/2023 Pedestal-Medium 8 $24.33 $194.64 Pedestal-Medium RMV-Per Unit 7 Day
9. 11/03/2023 Drilling/Bore $10.50 $14,805.00 Bore Single Pipe-7 day pay
HH 41044 to P57 1410 ft total. 1-1410/2-440
10. 11/03/2023 Bore-Additional Pipe 7 Day 440 $1.125 $495.00 Bore-Additional Pipe-7 day pay
HH 41044 to P57 1410 ft total. 1-1410/2-440
11. 11/03/2023 Hydro- Vac Dump 13 $100.00 $1,300.00 Hydro-Vac Dump Charge
12. 11/03/2023 Existing Facility 24 $31.80 $763.20 Dig and Expose Existing Facility-Per Cubic Yard
2632 S Rowen 2628 S Rowen 2618 S Rowen 7434 e Natal Ave 7438 E Natal Ave 7442 E Natal Ave 7450 E Natal Ave 7454 E Natal Ave 7464 E Natal Ave 7506 E Natal Ave 7536 E Natal Ave 7548 E Natal Ave
13. 11/03/2023 Asphalt 68 $7.313 $497.28 Asphalt-Temporary Cold Patch-Per Square Foot
14. 11/03/2023 Pedestal-Medium 6 $28.612 $171.67 Pedestal-Medium-Per Unit 7 Day
15. 11/03/2023 Pedestal-Medium 6 $24.33 $145.98 Pedestal-Medium RMV-Per Unit 7 Day
16. $0.00 ACH PAYMENT MADE 12/18/23 14913.68
Total $30,705.41 Cash, Zelle or Approved Check excepted for payment
Overdue 10/27/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to Ship to HMW Construction HMW Construction 129 East Pima Street 129 East Pima Street Phoenix, AZ 85004 Phoenix, AZ 85004
Invoice details Invoice no.: 1149 Terms: Due on receipt Invoice date: 11/27/2023 Due date: 11/27/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 P032287
2. Drilling/Bore $10.50 $4,536.00 Bore Single Pipe-7 DAY PAY
P59-P60 1 pipe 432ft total
3. 11/24/2023 Hydro- Vac Dump 12 $100.00 $1,200.00 Hydro-Vac Dump Charge
4. 11/24/2023 Bore-Additional Pipe 7 Day 191 $1.125 $214.88 Bore-Additional Pipe-7 DAY
P59-P80 1 additional pipe 191ft total
5. 11/24/2023 Pedestal-Medium 3 $28.612 $85.84 Pedestal-Medium-Per Unit 7 Day P59 P60 P80
6. 11/24/2023 Pedestal-Medium 3 $24.33 $72.99 Pedestal-Medium RMV-Per Unit 7 Day P59 P60 P80 7. 11/24/2023 Existing Facility 12 $31.80 $381.60 Dig and Expose Existing Facility-Per Cubic Yard-7 DAY PAY 7438 E Nido Ave 7428 E Nido Ave 7418 E Nido Ave 7414 E Nido Ave 7410 E Nido Ave 2604 S Raven
8. 11/24/2023 Asphalt 30 $7.313 $219.39 Asphalt-Temperary Cold Patch-Per Square Foot 7 DAY PAY
9. 11/24/2023 Drilling/Bore $10.50 $2,499.00 Bore Single Pipe-7 DAY PAY P.019840
S-71 to North Side of East Plana Ave @ 9538 E Plana Ave to existing pipe and connect 238ft total, 1 Pipe
10. 11/24/2023 Existing Facility 4 $31.80 $127.20 Dig and Expose Existing Facility-Per Cubic Yard-7 DAY PAY 3123 S Cortland Circle 3111 S Cortland Circle P.019840
11. 11/24/2023 Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium RMV-Per Unit 7 Day S71 P.019840
12. 11/24/2023 Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium-Per Unit 7 Day S71 P.019840
13. 11/24/2023 Asphalt 1 $7.313 $7.31 Asphalt-Temperary Cold Patch-Per Square Foot 7 DAY PAY P.019840
14. 11/24/2023 Drilling/Bore $10.50 $2,205.00 Bore Single Pipe-7 DAY PAY P.019840 3305 E Pampa Ave to SE Corner of S 93rd St/E Portobello to HH P31, 210ft total 1 Pipe
15. 11/24/2023 Drilling/Bore $10.50 $5,775.00 Bore Single Pipe-7 DAY PAY P019840 From S29 to NW Corner of E Portobello Ave/S 93rd St and turned corner to West and drilled along North side of E Portobello Ave to 92 Circle to join existing pipe
total 550 ft, 1 Pipe, 250ft for 2 Pipes
16. 11/24/2023 Bore-Additional Pipe 7 Day 250 $1.125 $281.25 Bore-Additional Pipe-7 DAY PAY NW Corner of E Portobello Ave/S 93rd St, West to S 92nd Circle, on North Side
Total 2 Pipes, 250Ft
17. 11/24/2023 Asphalt 42 $7.313 $307.15 Asphalt-Temperary Cold Patch-Per Square Foot 7 DAY PAY 18. 12/01/2023 Hydro- Vac Dump 14 $100.00 $1,400.00 Hydro-Vac Dump Charge
Total $19,369.83 Cash, Zelle or Approved Check excepted for payment
Overdue 11/27/2023 REGISTRAR OF CONTRACTORS OF THE STATE OF ARIZONA
Case No. 2024-00681 K&G Construction LLC,
COMPLAINANT, v. CITATION HMW Construction LLC License No. ROC 328765,
RESPONDENT.
The Registrar issues this Citation to HMW Construction LLC (“Respondent”) under
A.R.S. § 32-1155(A). If Respondent fails to answer this Citation by March 23, 2024, then under A.R.S. § 32-1155(C), Respondent’s failure to answer may be deemed an admission of the
act or acts charged in the underlying complaint, and the Registrar may then suspend or revoke
Respondent’s license(s).
THE WRITTEN COMPLAINT
On January 18, 2024, K&G Construction LLC (“Complainant”) filed a written
complaint with the Registrar. A copy of that Complaint is attached to this Citation.
A FORMAL STATEMENT OF THE CHARGES AGAINST RESPONDENT
The Registrar investigated this matter and finds cause to charge Respondent with
violation(s) of Title 32, Chapter 10 of the Arizona Revised Statutes. Respondent is charged
with violating:
Charge :1 A.R.S. § 32-1154(A)(10) — Failure by a licensee or agent or official of a licensee to pay monies in excess of $750 when due for materials or services rendered in connection with the licensee's operations as a contractor unless the
of 5
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 licensee proves that the licensee lacks the capacity to pay and has not received sufficient monies as payment for the particular construction work project or operation for which the services or materials were rendered or purchased.
If the matter proceeds to a hearing and the administrative law judge determines that any of the charges listed above are supported by a preponderance of the evidence, then Respondent’s license(s) may be subject to suspension or revocation, and Respondent may be subject to other penalties provided by law, including civil penalties under A.R.S. §§ 32-1154(E) and (F). FILING A WRITTEN ANSWER Respondent must appear by filing with the Registrar a written answer to the citation and complaint showing cause, if any, why Respondent’s license(s) should not be suspended or revoked. A.R.S. § 32-1155(A). Respondent’s written answer should contain the heading “Written Answer to Citation and Complaint” and should include the case number, which is Case No. 2024-00681. How to File a Written Answer: Respondent’s written answer may be submitted in the following ways: In-Person: 1700 W. Washington St., Ste. 105, Phoenix, Arizona, 85007-2812 Mail: P.O. Box 18244, Phoenix, Arizona, 85005-8244 Email: [email redacted] The Registrar’s normal office hours are 8:00 a.m. to 5:00 p.m., Monday through Friday. If Respondent submits a written answer by mail, it is not filed with the Registrar until the Registrar actually receives it. Deadline for Filing a Written Answer: Respondent must file a written answer with the Registrar no later than March 23, 2024. This deadline is calculated under A.R.S. §§ 32-1155(A) and (B), which provides a
of 5
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 deadline ten days after service of the Citation. Service of the Citation and Complaint is complete five days after the Registrar mails a copy of the Citation and Complaint to Respondent’s latest address of record in the Registrar’s office. Consequences for Failing to File a Written Answer: If Respondent fails to answer, Respondent’s failure may be deemed an admission of the act or acts charged in the written complaint. A.R.S. § 32-1155(C). The Registrar may then suspend or revoke Respondent’s license(s). THE ADMINISTRATIVE HEARING If Respondent files a timely written answer contesting any charges in the Complaint, then the Registrar will request the Office of Administrative Hearings set a date for an administrative hearing and will notify all the parties at least 30 days before that hearing. A.R.S. § 41-1092.05(D). RESPONDENT’S RIGHT TO REQUEST AN INFORMAL SETTLEMENT CONFERENCE Under A.R.S. § 41-1092.06, if Respondent submits a request to the Registrar for an informal settlement conference, the Registrar must hold a conference within 15 days after receiving the request. Respondent’s request for an informal settlement conference must be in writing and must be filed no later than 20 days before the administrative hearing. A.R.S. § 41- 1092.06(A). The Registrar will not close or settle any case without both parties’ appearance at the Settlement Conference. The parties participating in the settlement conference must have the authority to settle the case and must waive their right to object to the participation of the Registrar’s settlement conference representative in the final administrative decision. A.R.S. § 41-1092.06(B). Any statements, either written or oral, made by the parties at the conference, including a written document, created or expressed solely for the purpose of settlement negotiations, are
of 5
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 inadmissible in the administrative hearing. A.R.S. § 41-1092.06(B). RESPONDENT’S PRIOR RECORD Under A.A.C. R4-9-117, in determining the appropriate discipline, the administrative law judge and the Registrar may consider not only facts in the current case, but also facts in prior cases and any documents regarding Respondent on file with the Registrar. Respondent’s prior disciplinary record and current license(s) status may be considered as a mitigating or aggravating factor in determining the appropriate discipline. EVIDENTIARY DISCLAIMER By issuing this Citation, the Registrar is directing Respondent to file a written answer to the Citation and Complaint, showing cause, if any, why Respondent’s license(s) should not be suspended or revoked. A.R.S. § 32-1155(A). This Citation does not constitute proof that any charge or allegation in Complainant’s written complaint is in fact true. This Citation does not constitute proof that Respondent violated any statutory provision or rule adopted by the Registrar. Dated March 8, 2024. By: /s/ Robert Stirling Robert Stirling Assistant General Counsel Legal Department Arizona Registrar of Contractors COPY of the foregoing mailed by Certified Mail, Return Receipt Requested, March 8, 2024 to:
Respondent Certified Mail No: [number redacted]
HMW Construction LLC 4225 S 80th St Omaha, NE 68127
of 5
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 Copy mailed by USPS First Class mail this same date to: Respondent HMW Construction LLC 4225 S 80th St Omaha, NE 68127 HMW Construction LLC 7887 F St Omaha, NE 68127
Complainant K&G Construction LLC 1578 N Tucana Ct Gilbert, AZ 85234
Copy sent electronically this same date to:
Respondent at email address on record with the Registrar Complainant at email address on record with the Registrar
Case No. 2024-00681/tq
of 5
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg101 8/21 2/21/24, 2:02 PM State of Arizona Mail - Re: Non-Payment Complaint 2024-00681 Received Legal 02/21/2024 Tedi Quezada <[email redacted]>
Re: Non-Payment Complaint 2024-00681 message
K&G Construction LLC <[email redacted]> Wed, Feb 21, 2024 at 1:43 PM To: Tedi Quezada <[email redacted]>
Sorry I missed it.
We have not received anything from HMW, no money, calls, emails etc. it is still outstanding.
Thank you
Kevin Matzke K&G Construction [number redacted]
On Wed, Feb 21, 2024 at 10:54 AM Tedi Quezada <[email redacted]> wrote: Good morning Kevin,
I have attempted to call you at 303-807-3256, the voice mailbox is full.
I am inquiring as to the status of the debt between K&G and HMW, has this been resolved or is there still an outstanding balance? I need to know this information no later than the end of business today, 5:00 PM. The deadline for HMW to respond has passed and I would like to either move this complaint forward if necessary or get it closed if the debt has been resolved.
I look forward to communication from you.
Thank you
Tedi Quezada Legal Assistant II Legal Department Arizona Registrar of Contractors Main: 602.542-1525
Email: [email redacted]
The ROC is now on social media! Make sure to follow us on:
Fill out AZ ROC's survey to let us know how we're doing and how we can better serve you!
https://mail.google.com/mail/u/0/?ik=b3c9c6c218&view=pt&search=all&permthid=thread-a:r-[number redacted]%7Cmsg-f:[number redacted]… 1/1 0121034ÿ2673ÿ89 ÿÿ8 ÿ9 ÿÿ ÿ0703772ÿÿ ÿ Received Legal 02/07/2024 2345ÿ7839:4:ÿ;<345=>839:4:?@AB=:9=CADE
F: G 3ÿ H ÿ ! IHJK IILMNÿ Kÿ OAPK Q:RS3P< ÿFASTU :5P< VWXÿFAPG<@8B<5APÿYYFÿZ%-!"#" [! "\ ] -4ÿ^ 'ÿ.4ÿ0703ÿ ÿ7670ÿ9 _6ÿ_-ÿ̀# - ÿZ -a# - [" !+\ bÿ_-4ÿ " -ÿÿ ÿ+"ÿ! ÿ,ÿb9]ÿ-ÿ"!ÿ" ÿÿb9] ÿ ÿ#ÿ ÿ"+ 4ÿÿ"ÿÿÿÿ ÿ8ÿ ÿÿÿ ÿ" "%ÿ,4ÿb,ÿ--ÿ-ÿ ÿ ÿÿ ÿ ÿ-# ÿ+"4ÿ'#ÿÿ""ÿ#ÿÿ ÿ+" ÿ] ÿ--cÿ"+ÿÿ ÿ ÿÿ!ÿ"4ÿ'# --ÿÿ ÿ_ ÿÿÿÿ ÿ-"ÿÿd((4..20)ÿÿ' "ÿ, -ÿ ÿ ÿ! 4ÿb9]ÿ,#-ÿ ÿ# ÿÿ, ÿ"ÿÿ' ÿ -ÿÿ.ÿ- ÿ+ÿ3ÿ- ÿÿ(7ÿ- ÿ] ÿ"ÿ.ÿ- ÿ+ÿ ÿÿ"ÿ' ÿ ÿÿ# +"ÿ"!ÿ] ÿ, ÿ +ÿ -ÿÿ.ÿ- 4ÿ ÿ, ÿ#-ÿ +ÿ' ÿ" -ÿÿ 4ÿ ÿ ÿ! 4 "ÿÿ, cÿ -ÿÿ.ÿ- ÿ84ÿ+ÿ ÿ, ÿ, ÿ -4ÿ, ÿ, ÿÿ ÿ+"-ÿ# ÿÿ - -ÿ# ÿ ÿ+" ÿ -ÿÿ' ÿ ÿ-ÿÿ#ÿÿ/ÿÿ7ÿÿ/0ÿ4ÿe#ÿ -ÿÿ' ÿ, + ,%-ÿÿ ÿ ÿÿb,ÿ ÿ 611,,,"" "1 1$ "f-&9b!g_%7g_^g9*-&0..3(^7)3h83.^i72jk.!.l * -&-*&*&.7.(.2.)* f ! f&7* f+&/)7* ÿÿ ÿ%,ÿÿ ÿÿ# ÿa# ÿmÿ"ÿ, ÿÿ ÿ, _ % i +ÿ
611 !!"1 1#171$%&'(")""02*+,&* "& * -& -6.)7(7/.0(.../30//)0.!6.)7(7/.0(.../30//)1 1 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 Received Legal 02/07/2024 February 8, 2024
Via U.S. Mail and Email
Complainant K&G Construction LLC 1578 N Tucana Ct Gilbert, AZ 85234
Via U.S. Mail and Email
Respondent HMW Construction LLC 4225 S 80th St Omaha, NE 68127
HMW Construction LLC 7887 F St Omaha, NE 68127
Re: Complaint No. 2024-00681
Dear Complainant and Respondent:
The Registrar received a complaint filed against HMW Construction LLC for non- payment of materials or services rendered. This complaint is complete and will be substantively reviewed by the Registrar.
Respondent is free to raise any issue or affirmative defense to this complaint by filing a response with the Registrar by February 15, 2024. Please reference the complaint number listed above if you file a response. Respondent may file a response by:
Mail: P.O. Box 18244, Phoenix, Arizona, 85005-8244 In-Person: 1700 W. Washington St., Ste. 105, Phoenix, Arizona, 85007-2812 Email: [email redacted]
The Registrar will not issue a citation before February 15, 2024 and will review Respondent’s response, if one is submitted.
Please be advised that a response to the complaint is not the same as a written answer. If the Registrar issues a citation Respondent must file a written answer to that citation in accordance with A.R.S. § 32-1155.
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg100 4/21 Sincerely,
/s/ Tedi Quezada _______________ Tedi Quezada Legal Department 1700 W Washington St. Ste. 105 Phoenix, AZ 85007
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg100 4/21 0121034ÿ60733ÿ89 ÿÿ ÿ9 ÿÿ 7ÿ ÿ00326ÿÿ8 Received ÿ Legal 3456ÿ89402/06/2024 :;5;ÿ<=456>?94:;5;@ABC>;:>DBEF
G4 HÿI;J4ÿKLKMNLLOPQÿNÿRBSNT;UV4S=ÿIBVWX;6S= 6ÿ " YZ[ÿIBSJ=A9C=6BSÿ\\Iÿ]&."#$# ^" !#_ `$ 4ÿa (ÿ24ÿ003ÿ ÿ6070ÿ89 `7ÿ̀ .ÿb$ . ÿ] .!c$ . ^#!!",_
711 !""!#1 1$11%&'()#*#2#06+,-'+ #' + .' .7))6*/0)0260622*1/"76/*6/*6/*0*62 61) 0121034ÿ60733ÿ89 ÿÿ ÿ9 ÿÿ 7ÿ ÿ00326ÿÿ8 Received ÿ Legal 02/06/2024
711 !""!#1 1$11%&'()#*#2#06+,-'+ #' + .' .7))6*/0)0260622*1/"76/*6/*6/*0*62 01) 0121034ÿ60733ÿ89 ÿÿ ÿ9 ÿÿ 7ÿ ÿ00326ÿÿ8 Received ÿ Legal ,ÿ9 & 02/06/2024 3+4ÿ$# ))/)002 5ÿ6$ 4ÿ7 (ÿ24ÿ003ÿ ÿ6670)89ÿ6.ÿ9$ . ÿ: .!;$ . <#!!",=ÿ- 7 > 4 ÿ,$ÿ$ .ÿÿ?$ ÿ6*4ÿ0034ÿ ÿ#ÿÿ# ÿ#4ÿ .ÿÿ. . ÿÿ,. ÿ# ÿ.#$ ÿÿ ÿ ÿ?$ ÿ0*4ÿ003!ÿ@$ÿ , ÿ,. .ÿÿÿÿ ÿ#! 5ÿ?$ ÿ004ÿ0034ÿ ÿ "ÿ#,.ÿÿÿÿ>9Aÿ$#ÿBBÿC . D4ÿ"ÿ ,"ÿ . ÿ ÿÿ$ÿÿ ÿ$ ."ÿ,#!ÿ 5ÿ?$ ÿ024ÿ0034ÿEÿ#.ÿÿ#ÿÿ$ÿ ÿ ÿ ÿ$( ÿ .ÿÿ#.4ÿC))Dÿ/)0024ÿ ,"ÿÿ,#ÿ " ÿ;$ "ÿ# ÿÿ#ÿÿ ÿ . 4ÿ,."ÿÿ.#ÿ ÿ$( ÿÿ $ÿÿ#! ÿÿ ÿ. 4ÿ ÿ ÿ( ÿÿ#$# ÿÿ$ÿ" ."ÿ$ÿ ÿ#!ÿ@$ÿ-ÿ ,ÿ$ÿ6 $. 4ÿ7 ($ ÿ4ÿ0034ÿÿ# #ÿ " ."ÿ$ÿ#!ÿ7 $ÿÿ#$# ÿ-ÿ ÿ-ÿ$ÿÿ ÿ#ÿ( "ÿ#.! FGHIJÿLMN OXYPZ[Q\Rÿ^_ ÿTU PVWQW _`_a[baÿcc XYZ[\ÿdYe[fagYba ^fh̀ib[ÿjYZ`_af[fÿikÿlibaf[maif_ n[b̀oÿpqrsturvwtrt xg[`\oÿXYZ[\bYyg[`\zfims[hsZi{ ÿ5ÿÿ-ÿÿ#ÿ .| &ÿ$ÿÿ-ÿ$ÿ7
ÿ }`\\ÿi~aÿ^ÿjl_ÿ_~f{Yÿaiÿ\Yaÿ~_ÿbiyÿiyÿyYfYÿib̀Zÿ[b ÿiyÿyYÿm[bÿYaaYfÿ_Yf{Yÿi~
711 !""!#1 1$11%&'()#*#2#06+,-'+ #' + .' .7))6*/0)0260622*1/"76/*6/*6/*0*62 )1) January 19, 2024
Via U.S. Mail and Email
Complainant K&G Construction LLC 1578 N Tucana Ct Gilbert, AZ 85234
Via U.S. Mail and Email
Respondent HMW Construction LLC 4225 S 80th St Omaha, NE 68127
HMW Construction LLC 7887 F St. Omaha, NE 68127
Re: Complaint No. 2024-00681
Dear Complainant and Respondent:
The Registrar received a complaint filed against HMW Construction LLC for non- payment of materials or services rendered. This complaint is incomplete and will not be substantively reviewed by the Registrar until the following documentation is provided: 1. As indicated on the Non-Payment Complaint Form Instructions & Checklist, provide a copy of the original construction contract signed (by both parties). If no written contract, provide a written statement describing the agreement that includes the following information: • The reason a written contract is not being provided. • A description of the work to be performed under the contract. • The names of the people who negotiated the contract. • The agreed upon payment schedule. • An explanation of who was to receive payment. • The date the work was to be completed.
Please provide ALL requested information by January 29, 2024. The Registrar will close this complaint (as incomplete) without further written notice if you fail to provide the requested documentation by such date.
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg100a 11/23 Documents can be submitted by:
Mail: P.O. Box 18244, Phoenix, Arizona, 85005-8244 In-Person: 1700 W. Washington St., Ste. 105, Phoenix, Arizona, 85007-2812 Email: [email redacted]
Although the complaint is incomplete at this time, Respondent may file a response with the Registrar raising any issues or affirmative defenses to the complaint.
If the required information is provided and this complaint becomes complete, Respondent will be provided an additional opportunity to respond to the complaint.
Sincerely,
/s/ Tedi Quezada ________________ Tedi Quezada Legal Department 1700 W Washington St. Ste. 105 Phoenix, AZ 85007
1700 W. Washington Street, Suite 105 · Phoenix AZ 85007-2812 602.542.1525 · Toll Free 877.692.9762 · roc.az.gov Lg100a 11/23 Non-Payment Complaint Form Departmental Use Only Complaint Number: Mail to: Registrar of Contractors P.O. Box 18243 Phoenix, AZ 85005-8243
Person Filing Complaint (Payee) Business Name Full Name (First Middle Last) ROC License Number(s) (if any) Kevin Thomas Matzke Street Address City State Zip Code 1578 N Tucana Ct Gilbert Arizona 85234 Phone Number Email Address [number redacted] [email redacted] I consent to receive communications electronically in connection with this case
Name of Attorney (if any)
Attorney’s Street Address City State Zip Code
Attorney’s Phone Number Attorney’s Email Address
Licensee Information (Payer) Name (as shown on contracts, invoices, etc.) ROC License Number(s) HMW Construction LLC ROC 328765 Street Address City State Zip Code 4225 S 80th St Omaha NE 68127 Phone Number Email Address
Name of Person(s) Representing License Hank Doss Complaint Information Principal Amount Due (excluding interest and fees) Contract Date (if applicable) $62,992.28 September 18, 2023 Have you filed a civil complaint? No List all specific invoices which have not been paid. Attach additional pages if necessary. 1149, 1146, 1145, 1143, 1142, 1140
Certification I certify, upon information and belief, that the above-named licensee has failed to pay monies in excess of seven hundred fifty dollars when due for materials or services rendered in connection with the licensee’s operations as a contractor. I further certify, upon information and belief, that the above-named licensee has the capacity to pay, or has received sufficient monies as payment for the particular construction work project or operation for which the services or materials were rendered or purchased. A.R.S. § 32-1154(A)(10). Printed Name Signature Date Kevin Thomas Matzke Declaration & Signature I am the Complainant in this Complaint Form or Complainant’s duly authorized representative. I declare under penalty of perjury that the information contained in this Form is true and correct to the best of my knowledge. I further certify that any documents submitted in support of this complaint are true and correct copies of the originals and are accurate to the best of my knowledge. I will assist in the investigation or in the prosecution of the contractor or other parties, and will, if necessary, attend hearings and testify to facts. Printed Name Signature Date Kevin Thomas Matzke INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to HMW Construction 129 East Pima Street Phoenix, AZ 85004
Invoice details Invoice no.: 1140 Terms: Due on receipt Invoice date: 09/18/2023 Due date: 09/25/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 LUMEN Project P.032287
2. 09/19/2023 Drilling/Bore $10.50 $1,365.00 Bore Single Pipe-7 day pay
P-68 to corner of 7251 E Navarro Ave, to cross to North side of street and north on Terripin Circle. 130ft total 3 pipes
3. 09/19/2023 Bore-Additional Pipe 7 Day 130 $1.125 $146.25 Bore-Additional Pipe-7 day pay
P-68 to corner of 7251 E Navarro Ave, to cross to North side of street and north on Terripin Circle. 130ft total 3 pipes
4. 09/19/2023 Bore-Additional Pipe 7 Day 130 $1.125 $146.25 Bore-Additional Pipe-7 day pay
P-68 to corner of 7251 E Navarro Ave, to cross to North side of street and north on Terripin Circle. 130ft total 3 pipes
5. 09/20/2023 Drilling/Bore $10.50 $1,942.50 Bore Single Pipe-7 day pay
P-13 South, crossing E Navarro Ave to splice pipes from P-68. Total 185ft, 3 Pipes
6. 09/20/2023 Bore-Additional Pipe 7 Day 185 $1.125 $208.13 Bore-Additional Pipe-7 day pay
P-13 South, crossing E Navarro Ave to splice pipes from P-68. Total 185ft, 3 Pipes 7. 09/20/2023 Bore-Additional Pipe 7 Day 185 $1.125 $208.13 Bore-Additional Pipe-7 day pay
P-13 South, crossing E Navarro Ave to splice pipes from P-68. Total 185ft, 3 Pipes
8. 09/20/2023 Existing Facility 4 $31.80 $127.20 Dig and Expose Existing Facility-Per Cubic Yard
2637 S Terripin Circle 2649 S Terripin Cirlce
9. 09/21/2023 Drilling/Bore $10.50 $903.00 Bore Single Pipe-7 day pay
S-102 South to splice with pipes from P-67. West side of 72nd Circle. Total 86 ft, 2 pipes
10. 09/21/2023 Bore-Additional Pipe 7 Day 86 $1.125 $96.75 Bore-Additional Pipe-7 day pay
S-102 South to splice with pipes from P-67. Total 86 ft, 2 pipes
11. 09/21/2023 Existing Facility 2 $31.80 $63.60 Dig and Expose Existing Facility-Per Cubic Yard
2654 S 72nd Circle
12. 09/22/2023 Drilling/Bore $10.50 $6,825.00 Bore Single Pipe-7 day pay
72nd Street from E Madero Ave to E Monte Ave, East side of 72nd St. 650ft, 1 pipe
13. 09/22/2023 Drilling/Bore $10.50 $1,701.00 Bore Single Pipe-7 day pay
2654 S 72nd Circle to P-12. West side of 72nd Circle. 162ft total, 2 pipes
14. 09/22/2023 Bore-Additional Pipe 7 Day 162 $1.125 $182.25 Bore-Additional Pipe-7 day pay
2654 S 72nd Circle to P-12. West side of 72nd Circle. 162ft total, 2 pipes
15. 09/22/2023 Existing Facility 4 $31.80 $127.20 Dig and Expose Existing Facility-Per Cubic Yard
2646 S 72nd Circle 2638 S 72nd Circle
16. Hydro- Vac Dump 7 $100.00 $700.00 Hydro-Vac Dump Charge
17. $0.00 ACH ON 10/10/23 FOR 13496.55
Total $14,742.26 Cash, Zelle or Approved Check excepted for payment
Payment -$9,757.49 Balance due $4,984.77
Overdue 09/25/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to HMW Construction 129 East Pima Street Phoenix, AZ 85004
Invoice details Invoice no.: 1142 Terms: Due on receipt Invoice date: 10/02/2023 Due date: 10/09/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 Project P.032287 Lumen
2. Drilling/Bore $10.50 $3,318.00 Bore Single Pipe-7 day pay
7445 E Nopal Ave, P-42 to P-74 @7505 E Nopal Ave. 316ft, 4 pipes total
3. Bore-Additional Pipe 7 Day 316 $1.125 $355.50 Bore-Additional Pipe-7 day pay
7445 E Nopal Ave, P-42 to P-74 @7505 E Nopal Ave. 316ft, 4 pipes total
4. Bore-Additional Pipe 7 Day 315 $1.125 $354.38 Bore-Additional Pipe-7 day pay
7445 E Nopal Ave, P-42 to P-74 @7505 E Nopal Ave. 316ft, 4 pipes total
5. Bore-Additional Pipe 7 Day 316 $1.125 $355.50 Bore-Additional Pipe-7 day pay
7445 E Nopal Ave, P-42 to P-74 @7505 E Nopal Ave. 316ft, 4 pipes total
6. Existing Facility 6 $31.80 $190.80 Dig and Expose Existing Facility-Per Cubic Yard
7449 E Nopal Ave 7457 E Nopal Ave 7461 E Nopal Ave 7. Asphalt 4 $7.313 $29.25 Asphalt-Temperary Cold Patch-Per Square Foot
8. Drilling/Bore $10.50 $4,147.50 Bore Single Pipe-7 day pay
P42 to corner of S Raven and E Nopal Ave. 2 Pipes. Total ft 395. 1-395, 2-215
9. Bore-Additional Pipe 7 Day 215 $1.125 $241.88 Bore-Additional Pipe-7 day pay
P42 to corner of S Raven and E Nopal Ave. 2 Pipes. Total ft 395. 1-395, 2-215
10. Asphalt 2 $7.313 $14.63 Asphalt-Temperary Cold Patch-Per Square Foot
11. Pedestal-Medium 1 $24.33 $24.33 Pedestal-Medium RMV-Per Unit 7 Day
12. Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium-Per Unit 7 Day
13. Existing Facility 6 $31.80 $190.80 Dig and Expose Existing Facility-Per Cubic Yard
7437 E Nopal Ave 7425 E Nopal Ave 7415 E Nopal Ave
14. 10/05/2023 Drilling/Bore $10.50 $4,431.00 Bore Single Pipe-7 day pay
P-58 to P-36 and past in preparation to cross street east 422ft total, 1-422, 2-280
15. 10/05/2023 Bore-Additional Pipe 7 Day 280 $1.125 $315.00 Bore-Additional Pipe-7 day pay
P-58 to Connection @ S Raven and E Nopal Ave 280 ft total
16. 10/05/2023 Asphalt 6 $7.313 $43.88 Asphalt-Temporary Cold Patch-Per Square Foot
17. 10/05/2023 Existing Facility 10 $31.80 $318.00 Dig and Expose Existing Facility-Per Cubic Yard
2748 S Raven 2744 S Raven 2738 S Raven 2724 S Raven 2710 S Raven
18. 10/06/2023 Drilling/Bore $10.50 $1,785.00 Bore Single Pipe-7 day pay
7446 E Naranja 170 ft total, 2 pipes 19. 10/06/2023 Bore-Additional Pipe 7 Day 170 $1.125 $191.25 Bore-Additional Pipe-7 day pay
7446 E Naranja Ave
20. 10/06/2023 Asphalt 11.5 $7.313 $84.10 Asphalt-Temperary Cold Patch-Per Square Foot
21. 10/06/2023 Existing Facility 8 $31.80 $254.40 Dig and Expose Existing Facility-Per Cubic Yard
7446 E Naranja Ave 7438 E Naranja Ave 7426 E Naranja Ave 7416 E Naranja Ave
22. Pedestal-Medium 2 $28.612 $57.22 Pedestal-Medium-Per Unit 7 Day
23. Pedestal-Medium 2 $24.33 $48.66 Pedestal-Medium RMV-Per Unit 7 Day
24. Hydro- Vac Dump 11 $100.00 $1,100.00 Hydro-Vac Dump Charge
25. $0.00 ACH ON 10/23/23 FOR 14913.68
26. $0.00 975.30 ACH CREDITED FROM 10/16/23 ACH PAYMENT ON INVOICE 1141
Total $17,879.69 Cash, Zelle or Approved Check excepted for payment
Payment -$15,888.98
Balance due $1,990.71
Overdue 10/09/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to HMW Construction 129 East Pima Street Phoenix, AZ 85004
Invoice details Invoice no.: 1143 Terms: Due on receipt Invoice date: 10/09/2023 Due date: 10/16/2023
# Date Product or service SKU Qty Rate Amount
1. 10/09/2023 Drilling/Bore 280 $10.50 $2,940.00 Bore Single Pipe-7 day pay
7438 E Naranja Ave to 2753 S Raven. 280ft total, 2 Pipes
2. 10/09/2023 Bore-Additional Pipe 7 Day 280 $1.13 $316.40 Bore-Additional Pipe-7 day pay
7438 E Naranja Ave to 2753 S Raven. 280ft total, 2 Pipes
3. 10/09/2023 Asphalt 8 $7.31 $58.48 Asphalt-Temperary Cold Patch-Per Square Foot
4. Drilling/Bore 444 $10.50 $4,662.00 Bore Single Pipe-7 day pay
P73-P40. 444ft total, 1 Pipe
5. 10/10/2023 Existing Facility 10 $31.80 $318.00 Dig and Expose Existing Facility-Per Cubic Yard
7462 E Naranja Ave 7506 E Naranja Ave 7510 E Naranja Ave 7514 E Naranja Ave 7518 E Naranja Ave
6. Asphalt 5 $7.31 $36.55 Asphalt-Temperary Cold Patch-Per Square Foot 7. Pedestal-Medium 1 $28.61 $28.61 Pedestal-Medium-Per Unit 7 Day
8. Pedestal-Medium 1 $24.33 $24.33 Pedestal-Medium RMV-Per Unit 7 Day
9. 10/11/2023 Drilling/Bore 905 $10.50 $9,502.50 Bore Single Pipe-7 day pay
P-51 to 7422 E Navarro Ave. 905ft total, 2 Pipes
10. 10/11/2023 Bore-Additional Pipe 7 Day 260 $1.125 $292.50 Bore-Additional Pipe-7 Day Pay
P-51 to 7422 E Navarro Ave. 905ft total, 2 Pipes
11. 10/11/2023 Existing Facility 16 $31.80 $508.80 Dig and Expose Existing Facility-Per Cubic Yard
7518 E Navarro Ave 7512 E Navarro Ave 7502 E Navarro Ave 7460 E Navarro Ave 7442 E Navarro Ave 7432 E Navarro Ave 7428 E Navarro Ave 7422 E Navarro Ave
12. 10/11/2023 Asphalt 12 $7.313 $87.76 Asphalt-Temperary Cold Patch-Per Square Foot
13. 10/12/2023 Drilling/Bore 465 $10.50 $4,882.50 Bore Single Pipe7 day pay 465ft total
P-52 to P-51. 2 Pipe 465ft. P-49 to connection @ 2650 S Raven. 1 Pipe 165ft
14. 10/12/2023 Bore-Additional Pipe 7 Day 300 $1.125 $337.50 Bore-Additional Pipe-7 Day Pay
P-52 to P-51. 2 Pipe 465ft. P-49 to connection @ 2650 S Raven. 1 Pipe 165ft
15. Existing Facility 4 $31.80 $127.20 Dig and Expose Existing Facility-Per Cubic Yard
7413 E Navarro Ave 7452 E Navarro Ave
16. 10/12/2023 Asphalt 42 $7.313 $307.15 Asphalt-Temperary Cold Patch-Per Square Foot
17. 10/13/2023 Drilling/Bore 75 $10.50 $787.50 Bore Single Pipe-7 Day Pay
7422 E Navarro Ave crossing street to 7421 E Navarro Ave. Total 75 ft, 2 pipes 18. Drilling/Bore $10.50 $787.50 Bore Single Pipe-7 Day Pay
7422 E Navarro Ave crossing street to 7421 E Navarro Ave. Total 75 ft, 2 pipes
19. Hydro- Vac Dump 11 $100.00 $1,100.00 Hydro-Vac Dump Charge
20. Asphalt 24 $7.313 $175.51 Asphalt-Temporary Cold Patch-Per Square Foot
21. Pedestal-Medium 4 $24.33 $97.32 Pedestal-Medium RMV-Per Unit 7 Day
22. Pedestal-Medium 4 $28.612 $114.45 Pedestal-Medium-Per Unit 7 Day
23. $0.00 ACH 11/1/23 FOR 25,075.98
Total $27,492.56 Cash, Zelle or Approved Check excepted for payment
Payment -$25,075.98
Balance due $2,416.58
Overdue 10/16/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to Ship to HMW Construction HMW Construction 129 East Pima Street 129 East Pima Street Phoenix, AZ 85004 Phoenix, AZ 85004
Invoice details Invoice no.: 1145 Terms: Due on receipt Invoice date: 10/22/2023 Due date: 10/22/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 P.032287
2. 10/20/2023 Drilling/Bore $10.50 $8,893.50 Bore Single Pipe-7 day pay
7442 E Nido Ave to P63/ End of Street. 2 Pipes, 847ft total. 1-847ft/1-197ft
3. 10/20/2023 Bore-Additional Pipe 7 Day 197 $1.125 $221.63 Bore-Additional Pipe-7 day pay
7442 E Nido Ave to P63/ End of Street. 2 Pipes, 847ft total. 1-847ft/1-197ft
4. 10/20/2023 Asphalt 36 $7.313 $263.27 Asphalt-Temperary Cold Patch-Per Square Foot
5. 10/20/2023 Existing Facility 22 $31.80 $699.60 Dig and Expose Existing Facility-Per Cubic Yard
7446 E Nido Ave 7456 E Nido Ave 7462 E Nido Ave 7466 E Nido Ave 7510 E Nido Ave 7514 E Nido Ave 7526 E Nido Ave 7532 E Nido Ave 7542 E Nido Ave 7546 E Nido Ave 6. 10/20/2023 Hydro- Vac Dump 14 $100.00 $1,400.00 Hydro-Vac Dump Charge
7. 10/20/2023 Cut Concrete 14 $4.335 $60.69 Concrete RMV Per Sq Ft 7 Day Pay
8. 10/20/2023 Pedestal-Medium 1 $24.33 $24.33 Pedestal-Medium RMV-Per Unit 7 Day
9. 10/20/2023 Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium-Per Unit 7 Day
10. 10/17/2023 Asphalt 14 $7.313 $102.38 Asphalt-Temperary Cold Patch-Per Square Foot
11. 10/17/2023 Drilling/Bore $10.50 $5,932.50 Bore Single Pipe-7 day pay
P50 2662 S Raven to P53 2628 S Raven. 565ft total, 3 Pipes. 1-565/1-180/1-76
12. 10/17/2023 Bore-Additional Pipe 7 Day 180 $1.125 $202.50 Bore-Additional Pipe-7 day pay
P50 2662 S Raven to P53 2628 S Raven. 565ft total, 3 Pipes. 1-565/1-180/1-76
13. 10/17/2023 Bore-Additional Pipe 7 Day 76 $1.125 $85.50 Bore-Additional Pipe-7 day pay
P50 2662 S Raven to P53 2628 S Raven. 565ft total, 3 Pipes. 1-565/1-180/1-76
14. 10/17/2023 Existing Facility 14 $31.80 $445.20 Dig and Expose Existing Facility-Per Cubic Yard
2650 S Raven 2644 S Raven 2534 S Raven 2620 S Raven 2616 S Raven 2610 S Raven
15. 10/17/2023 Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium-Per Unit 7 Day P50
16. 10/17/2023 Pedestal-Medium 1 $24.33 $24.33 Pedestal-Medium RMV-Per Unit 7 Day P50
17. 10/17/2023 Cut Concrete 6 $4.335 $26.01 Concrete RMV Per Sq Ft 7 Day Pay
Total $18,438.66 Cash, Zelle or Approved Check excepted for payment
Payment -$14,913.68
Balance due $3,524.98 Overdue 10/22/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to Ship to HMW Construction HMW Construction 129 East Pima Street 129 East Pima Street Phoenix, AZ 85004 Phoenix, AZ 85004
Invoice details Invoice no.: 1146 Terms: Due on receipt Invoice date: 10/23/2023 Due date: 10/27/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 P.0032289
2. 10/27/2023 Drilling/Bore $10.50 $9,639.00 Bore Single Pipe-7 day pay
P60-P63 total 918ft. 1-918/2-208
3. 10/27/2023 Bore-Additional Pipe 7 Day 208 $1.125 $234.00 Bore-Additional Pipe
P60-P63 total 918ft. 1-918/2-208
4. 10/27/2023 Hydro- Vac Dump 13 $100.00 $1,300.00 Hydro-Vac Dump Charge
5. 10/27/2023 Existing Facility 18 $31.80 $572.40 Dig and Expose Existing Facility-Per Cubic Yard
7446 E Nido Ave 7450 E Nido Ave 7456 E Nido Ave 7466 E Nido Ave 7504 E Nido Ave 7510 E Nido Ave 7520 E Nido Ave 7538 E Nido Ave 7542 E Nido Ave 6. 10/27/2023 Asphalt 49 $7.313 $358.34 Asphalt-Temporary Cold Patch-Per Square Foot
7. 10/27/2023 Pedestal-Medium 8 $28.612 $228.90 Pedestal-Medium-Per Unit 7 Day
8. 10/27/2023 Pedestal-Medium 8 $24.33 $194.64 Pedestal-Medium RMV-Per Unit 7 Day
9. 11/03/2023 Drilling/Bore $10.50 $14,805.00 Bore Single Pipe-7 day pay
HH 41044 to P57 1410 ft total. 1-1410/2-440
10. 11/03/2023 Bore-Additional Pipe 7 Day 440 $1.125 $495.00 Bore-Additional Pipe-7 day pay
HH 41044 to P57 1410 ft total. 1-1410/2-440
11. 11/03/2023 Hydro- Vac Dump 13 $100.00 $1,300.00 Hydro-Vac Dump Charge
12. 11/03/2023 Existing Facility 24 $31.80 $763.20 Dig and Expose Existing Facility-Per Cubic Yard
2632 S Rowen 2628 S Rowen 2618 S Rowen 7434 e Natal Ave 7438 E Natal Ave 7442 E Natal Ave 7450 E Natal Ave 7454 E Natal Ave 7464 E Natal Ave 7506 E Natal Ave 7536 E Natal Ave 7548 E Natal Ave
13. 11/03/2023 Asphalt 68 $7.313 $497.28 Asphalt-Temporary Cold Patch-Per Square Foot
14. 11/03/2023 Pedestal-Medium 6 $28.612 $171.67 Pedestal-Medium-Per Unit 7 Day
15. 11/03/2023 Pedestal-Medium 6 $24.33 $145.98 Pedestal-Medium RMV-Per Unit 7 Day
16. $0.00 ACH PAYMENT MADE 12/18/23 14913.68
Total $30,705.41 Cash, Zelle or Approved Check excepted for payment
Overdue 10/27/2023 INVOICE
K&G Construction LLC/D&G Landscaping kandgconstructionaz ROC 349465, 346290, 346254 @gmail.com +1 (480) 500-1746 1578 North Tucana Ct Gilbert, AZ 85234
HMW Construction Bill to Ship to HMW Construction HMW Construction 129 East Pima Street 129 East Pima Street Phoenix, AZ 85004 Phoenix, AZ 85004
Invoice details Invoice no.: 1149 Terms: Due on receipt Invoice date: 11/27/2023 Due date: 11/27/2023
# Date Product or service SKU Qty Rate Amount
1. $0.00 P032287
2. Drilling/Bore $10.50 $4,536.00 Bore Single Pipe-7 DAY PAY
P59-P60 1 pipe 432ft total
3. 11/24/2023 Hydro- Vac Dump 12 $100.00 $1,200.00 Hydro-Vac Dump Charge
4. 11/24/2023 Bore-Additional Pipe 7 Day 191 $1.125 $214.88 Bore-Additional Pipe-7 DAY
P59-P80 1 additional pipe 191ft total
5. 11/24/2023 Pedestal-Medium 3 $28.612 $85.84 Pedestal-Medium-Per Unit 7 Day P59 P60 P80
6. 11/24/2023 Pedestal-Medium 3 $24.33 $72.99 Pedestal-Medium RMV-Per Unit 7 Day P59 P60 P80 7. 11/24/2023 Existing Facility 12 $31.80 $381.60 Dig and Expose Existing Facility-Per Cubic Yard-7 DAY PAY 7438 E Nido Ave 7428 E Nido Ave 7418 E Nido Ave 7414 E Nido Ave 7410 E Nido Ave 2604 S Raven
8. 11/24/2023 Asphalt 30 $7.313 $219.39 Asphalt-Temperary Cold Patch-Per Square Foot 7 DAY PAY
9. 11/24/2023 Drilling/Bore $10.50 $2,499.00 Bore Single Pipe-7 DAY PAY P.019840
S-71 to North Side of East Plana Ave @ 9538 E Plana Ave to existing pipe and connect 238ft total, 1 Pipe
10. 11/24/2023 Existing Facility 4 $31.80 $127.20 Dig and Expose Existing Facility-Per Cubic Yard-7 DAY PAY 3123 S Cortland Circle 3111 S Cortland Circle P.019840
11. 11/24/2023 Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium RMV-Per Unit 7 Day S71 P.019840
12. 11/24/2023 Pedestal-Medium 1 $28.612 $28.61 Pedestal-Medium-Per Unit 7 Day S71 P.019840
13. 11/24/2023 Asphalt 1 $7.313 $7.31 Asphalt-Temperary Cold Patch-Per Square Foot 7 DAY PAY P.019840
14. 11/24/2023 Drilling/Bore $10.50 $2,205.00 Bore Single Pipe-7 DAY PAY P.019840 3305 E Pampa Ave to SE Corner of S 93rd St/E Portobello to HH P31, 210ft total 1 Pipe
15. 11/24/2023 Drilling/Bore $10.50 $5,775.00 Bore Single Pipe-7 DAY PAY P019840 From S29 to NW Corner of E Portobello Ave/S 93rd St and turned corner to West and drilled along North side of E Portobello Ave to 92 Circle to join existing pipe
total 550 ft, 1 Pipe, 250ft for 2 Pipes
16. 11/24/2023 Bore-Additional Pipe 7 Day 250 $1.125 $281.25 Bore-Additional Pipe-7 DAY PAY NW Corner of E Portobello Ave/S 93rd St, West to S 92nd Circle, on North Side
Total 2 Pipes, 250Ft
17. 11/24/2023 Asphalt 42 $7.313 $307.15 Asphalt-Temperary Cold Patch-Per Square Foot 7 DAY PAY 18. 12/01/2023 Hydro- Vac Dump 14 $100.00 $1,400.00 Hydro-Vac Dump Charge
Total $19,369.83 Cash, Zelle or Approved Check excepted for payment
Overdue 11/27/2023 Received 3/11/24, 8:02 AM State of Arizona Mail - Written answer to citation and complaint 2024-00681 3/09/2024 ROC Legal
Answers - AZROC <[email redacted]>
Written answer to citation and complaint 2024-00681 message
ap ap <[email redacted]> Sat, Mar 9, 2024 at 2:44 PM To: [email redacted] Cc: ap ap <[email redacted]>
This information was provided in the last response. I have included proof of that email that was sent Jan 22, 2024 with no response all invoices are provided with adjustments that were made due to inaccurate information on invoices. Invoice #1149 was not provided to our accounts department for payment. we did request it from them and now have it. it is scheduled to be paid on resolution of this matter. We are also having issues with damages caused by subcontractors on the project in Mesa, and auditing to see if there are any issues with work performed by this particular subcontractor. A written contract was provided and signed by both parties.
I have attached a ledger of of all transactions with this subcontractor along with and open balance statement showing final amount due for Invoice 1149.
I have attached all invoices with adjustments that were made due to mistakes or billing for work discrepancies in quantity or pricing. Please feel free to contact me if you have any questions.
Jason Hatcher [email redacted]
Please see below and attached for response to their claim: Invoice = 1132 = $6532.80 PAID via ACH 09-08-2023, Invoice was paid in full no adjustments because it was correct. Invoice = 1134 = $19,487.79, PAID via ACH 09-08-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1135 = $6,627.25, PAID via ACH 09-18-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1137 = $3,622.50, PAID via ACH 09-18-2023, Invoice was paid in full no adjustments because it was correct. Invoice = 1138 = $17,850.00 PAID via ACH 09-25-2023, Invoice was paid in full no adjustments because it was correct. Invoice = 1139 = $18,321.60 PAID via ACH 09-25-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1140 = $13,496.55 PAID via ACH 10-10-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1141 = $14,913.68 PAID via ACH 10-23-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1142 = $16,430.42 PAID via ACH 10-16-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1145 = $14,913.68 PAID via ACH 12-15-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1146 = $29,213.99 PAID via Check #4428 on 01-10-2024, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1149 = We have no record of receiving this invoice until it was included on this email. It will be sent through our approval process and paid.
We have also attached our Subcontract Agreement with this Subcontractor for your review. We have attached all of the invoices in question of being paid in full as well.
Please reach out if you have any further questions.
https://mail.google.com/mail/b/AEoRXRTqvsXDsMefoYto6nPz57z5wCU6kMDGv1iIYwO0Ld9lwRDb/u/0/?ik=581c53cf5c&view=pt&search=all&permth… 1/2 Received 3/11/24, 8:02 AM State of Arizona Mail - Written answer to citation and complaint 2024-00681 3/09/2024 ROC Legal --
HMW Construction, LLC 4225 South 80th Street Omaha, NE 68127 402-275-6103
attachments Invoice_1135_from_KG_Construction_LLCDG_Landscape_LLC.pdf 415K K&G Inv. 1142.pdf 805K Invoice_1141_from_KG_Construction_LLCDG_Landscape_LLC_ROC_346290_346254.pdf 998K Invoice_1139_from_KG_Construction_LLCDG_Landscape_LLC.pdf 643K K&G Inv. 1146 - REVISED.pdf 578K Invoice_1140_from_KG_Construction_LLCDG_Landscape_LLC_ROC_346290_346254.pdf 689K K&G Inv. 1145.pdf 591K Invoice_1134_from_KG_Construction_LLCDG_Landscape_LLC (1).pdf 1000K hmw-construction.com Mail - Case 2024-00681 - Notice of Incomplete No-Pay Complaint - DO NOT REPLY.pdf 263K kg TRANSACTION.pdf 38K kg OPEN BALANCE.pdf 38K
https://mail.google.com/mail/b/AEoRXRTqvsXDsMefoYto6nPz57z5wCU6kMDGv1iIYwO0Ld9lwRDb/u/0/?ik=581c53cf5c&view=pt&search=all&permth… 2/2 Received 3/9/24, 3:23 PM hmw-construction.com Mail - Case 2024-00681 - Notice of Incomplete No-Pay Complaint - DO NOT REPLY 3/09/2024 ROC Legal
ap ap <[email redacted]>
Case 2024-00681 - Notice of Incomplete No-Pay Complaint - DO NOT REPLY messages
Tedi Quezada <[email redacted]> Fri, Jan 19, 2024 at 9:00 AM Bcc: [email redacted]
Hello,
Please see the attached electronic courtesy copy of the Notice of Incomplete No-Pay Complaint issued in Case 2024-00681. This document was also sent to your attention via US Mail.
PLEASE DO NOT REPLY DIRECTLY TO THIS EMAIL. Any reply or response should be addressed to [email redacted]
Thank you
Tedi Quezada Legal Assistant II Legal Department Arizona Registrar of Contractors Main: 602.542-1525
Email: [email redacted]
The ROC is now on social media! Make sure to follow us on:
Fill out AZ ROC's survey to let us know how we're doing and how we can better serve you!
20240119 Notice of Incomplete No-Pay Complaint 2024-00681 MAIL.pdf 506K
ap ap <[email redacted]> Mon, Jan 22, 2024 at 10:28 AM To: [email redacted], jason hatcher <[email redacted]>
Good Morning!
Please see below and attached for response to their claim: Invoice = 1132 = $6532.80 PAID via ACH 09-08-2023, Invoice was paid in full no adjustments because it was correct. Invoice = 1134 = $19,487.79, PAID via ACH 09-08-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1135 = $6,627.25, PAID via ACH 09-18-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1137 = $3,622.50, PAID via ACH 09-18-2023, Invoice was paid in full no adjustments because it was correct. Invoice = 1138 = $17,850.00 PAID via ACH 09-25-2023, Invoice was paid in full no adjustments because it was correct. Invoice = 1139 = $18,321.60 PAID via ACH 09-25-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1140 = $13,496.55 PAID via ACH 10-10-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1141 = $14,913.68 PAID via ACH 10-23-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1142 = $16,430.42 PAID via ACH 10-16-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1145 = $14,913.68 PAID via ACH 12-15-2023, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1146 = $29,213.99 PAID via Check #4428 on 01-10-2024, Invoice was adjusted due to billing the wrong price and/or not being approved for payment. Invoice = 1149 = We have no record of receiving this invoice until it was included on this email. It will be sent through our approval process and paid.
We have also attached our Subcontract Agreement with this Subcontractor for your review. We have attached all of the invoices in question of being paid in full as well.
Please reach out if you have any further questions.
Thank you, [Quoted text hidden] --
HMW Construction, LLC 4225 South 80th Street Omaha, NE 68127 402-275-6103
https://mail.google.com/mail/u/0/?ik=0802b50bee&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted]… 1/2 Received 3/9/24, 3:23 PM hmw-construction.com Mail - Case 2024-00681 - Notice of Incomplete No-Pay Complaint - DO NOT REPLY 3/09/2024 attachments ROC Legal
20240119 Notice of Incomplete No-Pay Complaint 2024-00681 MAIL.pdf 506K Invoice_1140_from_KG_Construction_LLCDG_Landscape_LLC_ROC_346290_346254.pdf 689K K&G Inv. 1145.pdf 591K K&G Inv. 1146 - REVISED.pdf 578K Invoice_1141_from_KG_Construction_LLCDG_Landscape_LLC_ROC_346290_346254.pdf 998K K&G Inv. 1142.pdf 805K Invoice_1135_from_KG_Construction_LLCDG_Landscape_LLC.pdf 415K Invoice_1139_from_KG_Construction_LLCDG_Landscape_LLC.pdf 643K Invoice_1134_from_KG_Construction_LLCDG_Landscape_LLC.pdf 1000K Subcontract Agreement for K& G Construction for Pauley Job.pdf 1999K
ap ap <[email redacted]> Sat, Mar 9, 2024 at 3:09 PM Draft To: [email redacted]
[Quoted text hidden]
attachments 20240119 Notice of Incomplete No-Pay Complaint 2024-00681 MAIL.pdf 506K Invoice_1140_from_KG_Construction_LLCDG_Landscape_LLC_ROC_346290_346254.pdf 689K K&G Inv. 1145.pdf 591K K&G Inv. 1146 - REVISED.pdf 578K Invoice_1141_from_KG_Construction_LLCDG_Landscape_LLC_ROC_346290_346254.pdf 998K K&G Inv. 1142.pdf 805K Invoice_1135_from_KG_Construction_LLCDG_Landscape_LLC.pdf 415K Invoice_1139_from_KG_Construction_LLCDG_Landscape_LLC.pdf 643K Invoice_1134_from_KG_Construction_LLCDG_Landscape_LLC.pdf 1000K Subcontract Agreement for K& G Construction for Pauley Job.pdf 1999K
https://mail.google.com/mail/u/0/?ik=0802b50bee&view=pt&search=all&permthid=thread-f:[number redacted]&simpl=msg-f:[number redacted]… 2/2 Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal Received 3/09/2024 ROC Legal 3:27 PM HMW Construction, LLC 03/09/24 Vendor Open Balance Accrual Basis All Transactions
Type Date Num Memo Due Date Open Balance Amount K&G Construction LLC Bill 11/27/2023 1149 Pauley OMA r... 02/22/2024 19,325.95 19,325.95
Total K&G Construction LLC 19,325.95 19,325.95
TOTAL 19,325.95 19,325.95
Page 1 Received 3/09/2024 ROC Legal 3:27 PM HMW Construction, LLC 03/09/24 All Transactions for K&G Construction LLC All Transactions
Type Num Date Account Amount
Bill Pmt -Check 4428 01/10/2024 American National Ba... -29,213.99 Bill Pmt -Check ACH 12/15/2023 American National Ba... -14,913.68 Bill 1149 11/27/2023 Accounts Payable -19,325.95 Bill Pmt -Check ACH 10/31/2023 American National Ba... -25,075.98 Bill Pmt -Check ACH 10/23/2023 American National Ba... -14,913.68 Bill 1146 10/23/2023 Accounts Payable -29,213.99 Bill 1145 10/22/2023 Accounts Payable -14,913.68 Bill Pmt -Check ACH 10/16/2023 American National Ba... -16,430.42 Bill Pmt -Check ACH 10/10/2023 American National Ba... -13,496.55 Bill 1143 10/09/2023 Accounts Payable -25,075.98 Bill 1141 10/03/2023 Accounts Payable -14,913.68 Bill 1142 10/02/2023 Accounts Payable -16,430.42 Bill Pmt -Check ACH 09/25/2023 American National Ba... -36,171.60 Bill Pmt -Check ACH 09/18/2023 American National Ba... -10,249.75 Bill 1140 09/18/2023 Accounts Payable -13,496.55 Bill 1139 09/15/2023 Accounts Payable -18,321.60 Bill 1138 09/12/2023 Accounts Payable -17,850.00 Bill Pmt -Check ACH 09/08/2023 American National Ba... -26,020.59 Bill 1137 09/04/2023 Accounts Payable -3,622.50 Bill 1135 09/04/2023 Accounts Payable -6,627.25 Bill 1132 08/07/2023 Accounts Payable -6,532.80 Bill 1134 08/07/2023 Accounts Payable -19,487.79 Total
Page 1 Mediation Notice
Mediation Services Mediation services are available to the parties. What is Mediation? Mediation is a method of resolving disputes where the parties can end conflict without the expense and time associated with the full administrative process. Who Participates in During mediation, a mediator will attempt to help the Mediation? parties find an optimal solution to the conflict. Both parties must agree to participate in mediation, and both parties must bring a representative to mediation that has full authority to settle the entire matter. Mediation Is Not Neither the Registrar nor the Office of Administrative Mandatory Hearings will penalize a party for not agreeing to mediation. Where do the Parties The parties will meet at the Office of Administrative Meet for Mediation? Hearings to participate in mediation.
The Office of Administrative Hearings is located at 1400 West Washington, Suite 101, Phoenix, Arizona 85007. When does Mediation can occur after the Registrar issues a citation, but Mediation Occur? before the administrative hearing. Why Should Parties Mediation can be an alternative to the full administrative Consider Mediation? process. Mediation is beneficial because it is (1) time- efficient, (2) cost-effective, (3) confidential, and (4) capable of providing flexible solutions to complex problems. How to Request If the parties wish to mediate this case, they must file a Joint Mediation Request for Mediation with the Office of Administrative Hearings. A Joint Request for Mediation is included with this Mediation Notice. REGISTRAR OF CONTRACTORS OF THE STATE OF ARIZONA _________________________ Case No. _______________ COMPLAINANT,
v. JOINT REQUEST FOR MEDIATION _________________________ RESPONDENT.
REQUEST
The parties jointly request that this matter be referred to mediation in the Office of Administrative Hearings (OAH). ☐ This matter is set for hearing on __________________(date). ☐ This matter is not currently set for hearing. MEDIATION AGREEMENT By requesting this mediation and signing below, the parties understand, represent, and agree: 1. The parties are prepared to commence mediation and will be ready for mediation on _____________________(date); 2. The parties will participate in the mediation process in good faith; 3. This request for mediation is not intended to hinder or delay administrative proceedings; 4. No party will contend that the mediation limits the power of OAH and its administrative law judges to conduct an administrative hearing and issue decisions under A.R.S. §§ 41-1092 – 1092.12; 5. The parties will be courteous and respectful throughout the mediation process to all participants; 6. The mediation is completely voluntary and the principal purpose is to allow the parties a full and fair opportunity to discuss settlement; of 3 REGISTRAR OF CONTRACTORS 1700 W. Washington St. Suite 105 – PHOENIX, AZ 85007-2812 Telephone (602)542-1525 1-877-692-9762 7. The mediator may conduct joint and separate meetings with the parties and may suggest resolutions to the parties’ dispute, but the mediator has no authority to impose a settlement upon the parties; 8. The mediation process is confidential. Communications made, material created for or used during, and acts occurring during mediation are confidential and may not be discovered or admitted into evidence in any proceeding except as provided by A.R.S. § 12-2238; 9. The mediator is not subject to service of process or a subpoena to produce evidence or to testify regarding any evidence or occurrence relating to the mediation except as provided in A.R.S. § 12-2238(C); 10. Neither the mediator, nor the Registrar of Contractors, nor the Office of Administrative Hearings is subject to civil liability for any act or omission in connection with any mediation service or activity except for acts involving
intentional misconduct or reckless disregard of a substantial risk of injury to the rights of others; 11. Throughout the mediation process, each party must have a representative present who will have full settlement authority to settle all claims at issue in the administrative
proceeding. 12. The mediation process will terminate when: a. The parties reach settlement; b. The mediator determines that further efforts at mediation are no longer likely
to achieve a settlement; or c. One of the parties withdraws from mediation. _____________________________________ _______________________ Complainant (or representative) Date
_____________________________________ _______________________ Respondent (or representative) Date
of 3 REGISTRAR OF CONTRACTORS 1700 W. Washington St. Suite 105 – PHOENIX, AZ 85007-2812 Telephone (602)542-1525 1-877-692-9762 PREHEARING DISCLOSURE STATEMENT INSTRUCTIONS ***DO NOT SUBMIT THESE INSTRUCTIONS WITH THE PREHEARING DISCLOSURE FORM***
ADMINISTRATIVE RULES A copy of the Arizona Administrative Code’s Rules for the Registrar of Contractors can be located on the Registrar’s Website.
PREHEARING DISCLOSURE REQUIREMENT Under A.A.C. R4-9-118(A), before a hearing, the parties must prepare a disclosure statement. The disclosure statement must contain: • A list of all the witnesses the party will call to testify, including the witnesses’ contact information and a brief description of the subject matter of the witnesses’ expected testimony; and • A list of all the exhibits that the party will use at the hearing.
FILE PREHEARING DISCLOSURE STATEMENTS • The Prehearing Disclosure Statements and Exhibits may be submitted to the Arizona Office of Administrative Hearings using any of the following: • Electronically: https://portal.azoah.com/submission/ • In-Person or by Mail: 1740 West Adams Street, Lower Level, Phoenix, Arizona 85007
EXCHANGING DISCLOSURE STATEMENTS AND EXHIBITS Under A.A.C. R4-9-118(B) (effective November 5, 2017), a party to the hearing must serve on every other party and file with the Office of Administrative Hearings a copy of: • The disclosure statement; and, • Any exhibit that the party will use at the hearing. Service: The disclosure statement and exhibits must be served on all parties in accordance with Arizona Administrative Code R2-19-108 Filing Documents. Under A.A.C. R2-19-108, service is completed by: • Personal delivery; • 1st class, certified or express mail; or • Facsimile. Timing: The disclosure statement and the exhibits must be served and filed not less than seven calendar days before the date of the hearing. Under A.A.C. R2-19-108, a document is served on a party: • On the date it is personally served; • Five days after it is mailed by express or 1st class mail; • On the date of the return receipt if it is mailed by certified mail; or • On the date indicated on the facsimile transmission.
CONSEQUENCES FOR FAILING TO DISCLOSE Under A.A.C. R4-9-108(C), if a witness or an exhibit is not timely disclosed as required the rules, and good cause for the failure to disclose is not shown, then the administrative law judge may: • Order that certain witnesses or exhibits not be used at the hearing; • Order that a particular fact is or is not established for the record; or, • Order that a charge, a defense, a claim, or some portion thereof, be dismissed.
Form RC-L-800A Prehearing Disclosure Statement Rev. 10/08/2019 Instructions Form PREHEARING DISCLOSURE STATEMENT FORM RC-L-800A
PART 1: WITNESS LIST DOCKET NO. Under A.A.C. R4-9-118(A), before a hearing, a party must prepare a disclosure statement containing a list of all the witnesses the party will call to testify, including the witnesses’ contact information and a brief description of the subject matter of the witnesses’ expected testimony. If you need additional space to list all witnesses, complete and attach additional Witness Lists. Example 1. Name 2. Telephone Number 3. Email Address
John Doe (123) 456-7890 [email redacted] 4. Subject Matter of Expected Testimony
John Doe will testify regarding the poor workmanship and poor installation of the Garage Door. Mr. Doe will also testify regarding the invoices and change orders for the project.
Witness 1. Name 2. Telephone Number 3. Email Address
4. Subject Matter of Expected Testimony
Witness 1. Name 2. Telephone Number 3. Email Address
4. Subject Matter of Expected Testimony
Witness 1. Name 2. Telephone Number 3. Email Address
4. Subject Matter of Expected Testimony
Witness 1. Name 2. Telephone Number 3. Email Address
4. Subject Matter of Expected Testimony
Form RC-L-800A Prehearing Disclosure Statement Rev. 1/15/2019 Page 1 of 3 PART 2: EXHIBIT LIST DOCKET NO. Under A.A.C. R4-9-118(A), before a hearing, a party must prepare a disclosure statement containing a list of all the exhibits that the party will use at the hearing. Note: All exhibits listed below must be provided to all parties to the hearing. See A.A.C. R4-9-118(B). If you need additional space to list all witnesses, complete and attach additional Exhibit Lists. Example Contract for new garage door. Invoice #10001 – Cost for garage door replacement.
Exhibit Exhibit Name
Form RC-L-800A Prehearing Disclosure Statement Rev. 1/15/2019 Page 2 of 3 PART 3: ACKNOWLEDGEMENT & SIGNATURE I certify that the above information is true and correct and that I will serve a copy of this disclosure statement and any exhibits listed in Part 2 to all parties to the hearing in accordance with A.A.C. R4-9-118. I acknowledge and understand that if I fail to properly disclose a witness or exhibit, the administrative law judge may: • Order that certain witnesses or exhibits not be used at the hearing; • Order that a particular fact is or is not established for the record; or, • Order that a charge, a defense, a claim, or some portion thereof, be dismissed.
I am the (check one): Complainant Respondent Docket No.
Print Name Signature Date
Form RC-L-800A Prehearing Disclosure Statement Rev. 1/15/2019 Page 3 of 3